Loading...
HomeMy WebLinkAboutBoulder Contracting, LLC - FY24 Rainbow Dr RR Crossing Repair, Cont. No. 1108 - 12.16.2024CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: FY 2024 RAINBOW DRIVE RAILROAD CROSSING REPAIR CONTRACT NO, 1108 Date Prepared: November 21, 2024 AMOUNT: $4,957.37 DECREASE TO: BOULDER CONTRACTING, LLC , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated Mav 20. 2024. A. Description of change to be made or extra work to be done: Adjust construction quantities to actual construction quantities B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. TOTAL DECREASE $4,957.37 BY. 1'I°�" 16/2024 BOULDER CONTRACTING, LLC Mayor Date CONTRACTOR ATTEST: Kelley FelchCe BY: Date SIGN[NFN D 12/16/2024 SIG City Clerk TITLE: Arcacr ,.i4,6,4151,,' Date APPROVED: Ci y Engine ' Date Final Quantity Adjustment Contract No. 1108 Sheet 1 of 2 FY 2024 RAINBOW DR RAILROAD CROSSING REPAIR FINAL CONTRACT NO. 1108 PERIOD: BID ITEM ITEM DESCRIPTION UNIT ORIGINAL BID QTY. FINAL QUANTITY QUANTITY DIFFERENCE CONTRACTOR UNIT PRICE CONTRACTOR BID PRICE EXT. INCREASE/ DECREASE 1 EXCAVATION, CLASS 10 - WASTE CY 30 10.0 (20.0) $ 33.00 $ (660.00) $ (660.00) 2 TOPSOIL, FURNISH AND SPREAD CY 24 36.0 12.0 $ 57.00 $ 684.00 $ 684.00 3 MODIFIED SUBBASE CY 15 29.087 14.1 $ 73.00 $ 1,028.35 $ 1,028.35 4 STANDARD/SLIP-FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 6-INCH SY 43.3 43.3 - $ 74.00 $ - $ - 5 STANDARD/SLIP-FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 10-INCH SY 78.9 78.9 - $ 110.00 $ - $ - 6 MANHOLE ADJUSTMENT, MINOR, STORM EA 1.0 1.0 - $ 954.00 $ - $ - 7 SUBDRAIN, STANDARD, PERFORATED PLASTIC PIPE, 6 IN. DIA. LF 46.0 - (46.00) $ 43.00 $ (1,978.00) $ (1,978.00) 8 REMOVAL OF PAVEMENT SY 230.3 - (230.30) $ 21.00 $ (4,836.30) $ (4,836.30) 9 REMOVAL OF PAVED DRIVEWAY SY 63.0 63.0 - $ 19.00 $ - $ - 10 RAILROAD APPROACH SECTION, PCC SY 163.1 163.1 - $ 117.00 $ - $ - 11 PAINT MARKINGS, SOLVENT OR WATER -BOURNE STA 3.46 3.78 0.32 $ 194.00 $ 62.08 $ 62.08 12 SEEDING AND FERTILIZING (URBAN) ACRE 0.015 0.015 - $ 50,000.00 $ - $ - 13 TRAFFIC CONTROL LS 1.0 1.00 - $ 4,040.00 $ - $ - 14 SAFETY CLOSURE EA 2.0 2.0 - $ 102.00 $ - $ - 15 CD JOINT ASSEMBLY EA 2.0 2.0 - $ 415.00 $ - $ - 16 MOBILIZATION LS 1.0 1.0 - $ 4,500.00 $ - $ - 1001 HMA, 8-INCH SY 9.7 15.1 5.4 $ 137.50 $ 742.50 $ 742.50 PROJECT TOTALS $ (4,957.37) $ (4,957.37) PAYMENTS: AMOUNT AMT. TO DATE PAY ESTIMATE #1 $ 45,827.59 $ 45,827.59 PAY ESTIMATE #2 $ 2,390.44 $ 2,390.44 RETAINAGE $ 2,537.79 $ 50,755.82 TOTAL PAYMENTS: $ 50,755.82 CHANGE ORDERS: AMOUNT CHANGE ORDER #1- 11/1/2024 $ 1,773.75 CHANGE ORDER TOTAL $ 1,773.75 AMOUNT ORIGINAL CONTRACT AMOUNT $ 53,939.44 CHANGE ORDER TOTAL $ 1,773.75 REVISED CONTRACT AMOUNT $ 55,713.19 FINAL QUANTITY SUMMARY $ (4,957.37) FINAL CONTRACT AMOUNT $ 50,755.82 Final Quantity Adjustment Contract 41108 Sheet 2 of 2