Loading...
HomeMy WebLinkAboutPeters Construction CO # 1 City of Waterloo Parking Ramp, Atrium & Skywalk Update - 1.6.25PETERS CONSTRUCTION CORPORATION 901 Black Hawk Rd., Waterloo, IA 50701 Phone: 319-236-2003 Fax: 319-236-2009 CITY OF WATERLOO PARKING RAMP, ATRIUM, & SKYWALK UPDATE COMMERCIAL STREET PARKING RAMP PROPOSED CHANGE ORDER #1 DECEMBER 3RD, 2024 GENERAL PROJECT REQUIREMENTS • Onsite field and office supervision and coordination. • Electric service usage fees/costs to be provided by the City of Waterloo. • Temporary internet and cell phone service. • General project cleanup. • Waste disposal fees. • Subcontractor liability insurance. SELECTIVE DEMOLITION • Remove and dispose of gypsum board ceiling outside the North skywalk door in the atrium area. • Remove and dispose of existing 1 x wood baseboard. CONCRETE FINISHING • Infill voids of existing concrete with grout in atrium area that was covered by carpet tile. FINISH CARPENTRY • Furnish and install new I x8 wood baseboard in the atrium area. SHEET METAL FLASHING AND TRIM • Furnish and install primed sheet metal panel to cover the existing insulation at the South doors of the skywalk. JOINT SEALANTS • Caulking of new I x8 wood baseboard. PAINTING • Paint the existing exposed ceiling structure and existing structure around the fire dampers at the North entiy of the skywalk in the atrium area. • Paint the new sheet metal flashing at the South doors of the skywalk. • Paint the wall base in the atrium area. SPRINKLER SYSTEM • Add sprinkler heads around the fire dampers at the North end of the skywalk to maintain proper coverage. PETERS CORPORATION CONSTRUCTION 901 Black Hawk Rd., Waterloo, IA 50701 Phone: 319-236-2003 Fax: 319-236-2009 ELECTRICAL • Remove the existing transformer and disconnect any electrical associated with the RTU to above the door into the hotel. CHANGE ORDER TOTAL NOTES AND CLARIFICATION Quer 'z 9l'i Kelley Telchle S11,898.00 U/2025 • Sales tax is excluded. • Building permit and plan review fees are excluded. • Davis -Bacon wages are excluded. • Temporary heat to be provided by Owner. • Builders risk insurance to be provided by Owner. • All cost increases after 30 days from the original proposal date of December 3"1. 2025