Loading...
HomeMy WebLinkAboutEntrust - Addendum No. 2, Cont. No. 1088 - 1.8.2025 ADDENDUM NO. 2 TO THE EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA— PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2024 CITY OF WATERLOO, IOWA DATE: DECMBER 30, 2024 The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2024: o Due to long lead times with USACE permits for three (3) levee crossings in Task Orders 9, 13 and 14, the City requested to go overhead and attach to MidAmerican Energy poles. o This Addendum has been created to account for labor towards the Make Ready Engineering (MIRE) services (make ready, pole loading analysis, pole applications, and pole data collection) for the MidAmerican Energy pole attachment applications.. o The following labor pricing is net new costs to the project: Make Ready Engineering Description Quantity Unit Price Amount Services Design Coordinator 20 $145.00 $2,900.00 Design Tech II 20 $130.00 $2,600.00 Construction Manager 8 $175.00 $1,400.00 Construction Inspector 1 8 1 $140.00 $1,120.00 Field Manager 2 $200.00 $400.00 TOTAL $8,420.00 Any revisions to any of the Contract Documents made by this Addendum shall be considered as the same revision to any and all related areas of the Contract Documents not specifically called out in this Addendum. /GAUL J lWv SIGNED _� SIGNEG f V � Quentin Hart Andrew Van Fleet Mayor of Waterloo, Iowa Board Chair City of Waterloo Waterloo Fiber Mike Hawkins Vice President Operations EN Engineering, LLC Page 1 of 1