Loading...
HomeMy WebLinkAboutEconomic Development Administration - Final Acceptance-02.03.2025OMB Number: 0610-0096 Expiration Date: 01/31/2025 ECONOMIC DEVELOPMENT ADMINISTRATION FINAL ACCEPTANCE REPORT EDA Award Number: 05-79-06185 Date: 1/13/2025 Recipient: City of Waterloo Co-Recipient(s): Recipient's Authorized Representative: Quentin Hart, Mayor Name & Phone Number Contract # 1 of 1 Contracts Contract Award Date: 2/5/24 Project/Contract Description: Fiber Backbone The following representatives were present during the final inspection (include Name/Title): Owner: City of Waterloo Architect/Engineer: Dave Arrigo Contractor: Price Industrial Electric EDA Representative (if applicable): Vincent Greener Other: RECITAL: The work performed under this contract was inspected on 2/3/2025 (date) for the purpose of determining acceptability of construction. The Date of Acceptance is hereby established as February 3, 2025 The "Date of Acceptance" is the date which the Owner may occupy and/or use the facility for the purpose for which it is intended in accordance with the contract documents and all work for the facility has been completed with the exception of minor cleanup and minor corrective action as shown in the Architect/Engineer's list made during the final inspection. Dave Arrigo Architect/Engineer (Print) Architect/Engineef (Signature) Date 1/13/2025 The Contractor agrees that the Date of Acceptance is also the date of commencement of all warranties required by the contract documents and that he/she (the Contractor) has released all liens on the project, including material, men and mechanics liens or others filed by the Contractor. The Contractor will complete the work on the Architect/Engineer's list of minor cleanup and corrective work within the Date of/A eptance. (., Jarree) Pekr <« Contractor Signature Contractor (Print) The Owner accepts the work as complete/substantially complete and will assume full possession thereof on (date). 67CCetz-Wz 9 it V 02/03/25 Owner (Print) Owner Signature Date