HomeMy WebLinkAboutEN Engineering - Addendum #3 - 3.3.2025ADDENDUM NO. 3
TO THE
EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA - PROJECT MANAGEMENT, CONSTRUCTION
MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2025
CITY OF WATERLOO, IOWA
DATE: February 14, 2025
The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA -
PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND
ENGINEERING SUPPORT SERVICES 2025 (Project #2572004.00):
o Included in the agreement is the option to expedite underground construction activities
from April through October 2025 by increasing the number of crews to 20 during this
period.
o To support this accelerated schedule and the crew counts, an additional two (2)
Construction Inspectors and one (1) additional Project Coordinator will be required to
maintain our contracted ratio of one (1) Construction Inspector for every four (4)
construction crews.
o If for any reason the contractor's crew count reduces during this period, the number of
inspectors required will be re-evaluated at that time and applicable monthly payments
adjusted accordingly.
o These additional resources will be billed at $65,656 per month, from April through
October 2025.
RESOURCE
MONTHLY TOTAL
APR - OCT 2025 TOTAL
Construction Inspector
$24,678
$172,746
Construction Inspector
$24,678
$172,746
Project Coordinator
$16,300
$114,100
TOTALS
$65,656
$459,592
o An additional $4,000 per month will be added to cover the estimated monthly travel
expenses for these inspectors (will be billed as incurred on a not -to -exceed basis).
Any revisions to any of the Contract Documents made by this Addendum shall be considered as the
same revision to any and all related areas of the Contract Documents not specifically called out in
this Addendum.
Quentin Hart
Mayor of Waterloo, Iowa
City of Waterloo
SIGNED Eric- LGoe_
David Klimas
Chief Operating Officer
EN Engineering, LLC
DIO[IALLY
SIGNED
Eric Lage
General Manager of Telecommunications
Waterloo Fiber