Loading...
HomeMy WebLinkAbout2025-163-03.17.2025Prepared LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo, IA 50703, (319) 291-4323. RESOLUTION NO. 2025-163 A RESOLUTION CONFIRMING APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, ETC., AND AUTHORIZING TO PROCEED IN CONJUNCTION WITH THE FY 2025 E./W. SAN MARNAN DRIVE RECONSTRUCTION PROJECT, CONTRACT NO. 1116. WHEREAS, the City of Waterloo has completed the development of plans, specifications, and a form of contract for the E./W. San Marnan Drive Reconstruction Project as part of the FY 2025 capital improvements, designated as Contract No. 1116; and WHEREAS, these documents have been prepared in accordance with applicable engineering standards and city requirements to ensure the project's success in enhancing transportation infrastructure; and WHEREAS, formal approval of the project documentation and authorization to commence proceedings is required to facilitate project execution and completion; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waterloo as follows: 1. The plans, specifications, and form of contract for the FY 2025 E./W. San Marnan Drive Reconstruction Project, Contract No. 1116, are hereby approved. 2. The Engineering Department is authorized to take all necessary steps to proceed with implementing this contract, including but not limited to the execution of contracts, and commencement of work as per the approved plans and specifications. 3. This resolution shall become effective immediately upon its approval and adoption by the City Council. PASSED AND ADOPTED this 17`h day of March 2025. Ottertaa »ai Quentin Hart, Mayor ATTEST: 1(elley Felchle Kelley Felchle, City Clerk SEAL 0 fr..ftfed OWF, p1M1Mill P1110111111 T 1Vi