Loading...
HomeMy WebLinkAboutAECOM - SA #2 - Titus Lift Station CRS Agreement - 3.17.2025AECOM March 5, 2025 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Titus Lift Station and Force Main Project Supplemental Agreement No. 2 City of Waterloo, Iowa City Contract No. 975 AECOM #60726355 Dear Mr. Gaherty: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com 319-232-6531 tel 319-232-0271 fax AECOM is requesting Supplement Agreement No. 2 to continue Construction Related Services for the Titus Lift Station and Force Main Project. The Original Final Completion Date was 11/30/24. The Final Completion Date was revised to 05/30/25 after the approval of WRH Change Order No. 6 on 01/21/25 by the City Council. The following are the reasons for the request: • WRH lost 3 weeks of time searching for a leak in the force main • WRH received defective check valves that delayed the installation of the lift station equipment and startup • MidAmerican Energy took 5 months to resolve an unknown conflict with our connection to the existing sanitary sewer and an existing 4-IN gas main. This lengthy process caused WRH to be delayed 2 months making that connection, and pushed the demolition of the existing lift station, paving and fencing of the site to the spring The project is approximately 90% complete. This Supplemental Agreement will provide AECOM funding to complete the Construction Related Services, Record Drawings, SRF assistance and Project Close Out. Thank you for your consideration of this request. Yours sincerely, { Christopher G. Oelkers, PE Enclosure: Supplemental Agreement No. 2 S:\02-WATERLOO\100-AGREEMENTS\TITUS SA\975 TITUS - SA2 LTR.docx AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com TITUS LIFT STATION AND FORCE MAIN PROJECT CITY OF WATERLOO, IOWA CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated September 24, 2018, for the design of the Titus Lift Station and Force Main project. WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated February 5, 2024, for construction -related services for the project; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 for additional construction -related services for the project. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. Project Description The project consists of replacement and construction of a new lift station, force main and gravity sewer at the existing Titus Lift Station site and along the Broadway Street corridor in the northwest portion of the City of Waterloo. The project will improve current overloading of the existing lift station during periods of wet weather and provide capacity to expand the service areas north and northwest of the station. The project provides benefits for economic development and improves flow conditions in a portion of the system which currently experiences overloading during wet - weather flows. The City utilizes a State Revolving Fund (SRF) loan for the project. The construction cost for the project is approximately $6.2 million dollars. ATS will provide construction -related services along with engineering assistance to the City for the SRF process. II. Scope of Services The Scope of Services will encompass and include additional work, services, materials, equipment, personnel and supplies necessary to provide construction -related services for the project and associated engineering assistance to the City for the SRF process required for the project for the extended project schedule with an anticipated end date of August 31, 2025. The Scope of Services is further defined as follows: Task 1. Prepare additional monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 2. Perform additional construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 3. Provide additional periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 4. Facilitate additional construction progress meetings of project as needed and complete minutes for each meeting. AECOM III. Compensation Page 2 Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in Supplemental Agreement No. 1. The estimated fee is Forty -Nine Thousand Two Hundred Dollars ($49,200.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated September 24, 2018. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By edae Skt,(-eZ Michelle M. Sweeney, PE, PTOE Associate Vice President APPROVED FOR CITY OF WATERLOO: Date March 5, 2025 /�/ eft %n (1�Uti 1/L SIGNED 3/17/2025 By: Date Quentin Hart Mayor L:\Secure DCSWdministration\AGREE\SUPPLE\SA2 WAT Titus Lift Station CRS.docx