HomeMy WebLinkAboutMidAmerican_Commercial_-_Gas_service_pump_house_-_4.21.25Docusign Envelope ID: 90C731A5-AC54-4CA4-95C6-727D3EC2FDB2
MiclAmerican
ENERGY
OBSESSPVELY. RELENTLESSLY ar YOUR SERVICE.
4/10/2025
Waterloo Leisure Services
Attn: Travis Nichols
TRAVIS.NICHOLS@WATERLOO-IA.ORG
MidAmerican Energy
Attn: Brad Ballard - DMCC
PO Box 657
Des Moines, IA 50306
Reference: Gas service extension of 2" PL to serve a reconstructed pool pump house at 801
Campbell Ave. in Waterloo, IA. MX: 3821851
Dear Travis,
The enclosed drawing shows MidAmerican Energy Company's proposal for providing gas to
serve 3,150,000 BTU with one (1) meter at the above location. The applicant charge for this
installation is $6,100. This proposal is valid for 90 days and if MidAmerican Energy Company
construction has not commenced within 12 months it may be voided. This proposal is based on
the following terms:
MidAmerican Energy Company Proposes To:
1. Furnish and install gas service piping of the appropriate size to serve the above load.
2. Furnish and install applicable gas meter and header.
3. Supply 2psig at the meter.
a. For a 2psig delivery pressure to a customer, the customer's piping system must be
able to receive, withstand and control 5 psig of gas pressure.
The Applicant Agrees To:
1. Be responsible for all restoration.
2. Provide without cost to the Company such easements as are necessary for the installation
and maintenance of Company's facilities on private property. If a 3rd party easement is
required any cost associated in obtaining the easement will be paid by the applicant.
Docusign Envelope ID: 90C731A5-AC54-4CA4-95C6-727D3EC2FDB2
1 MidAnierican
ENERGY
OBSESSPVELY. RELENTLESSLY ar YOUR SERVICFA
MidAmerican Energy
Attn: Brad Ballard - DMCC
PO Box 657
Des Moines, IA 50306
3. Grade the service route to within four inches of final grade and clear the route of
construction materials, obstructions, trees, etc. Extra costs for additional excavation
beyond normal trenching operations, due to unforeseen underground obstructions, shall
be paid by the applicant.
4. Permanently mark private fuel lines with metal tags or paint for each unit.
5. The 2" gas riser bracket must be installed at final grade.
6. Furnish and install guard posts around the gas meter set (if needed).
7. Locate all underground facilities such as storm and sanitary sewer, septic lines,
underground electric cable, communication cable, irrigation systems and water lines that
are not located by members of One Call. MidAmerican Energy Company assumes no
liability for private facilities not located.
8. Be responsible for complying with all aspects of compliance as required by any local,
state, or federal permit or plan associated with storm water pollution prevention or
erosion control. It is specifically understood and agreed that MidAmerican Energy
Company is providing the service requested by the Applicant solely for the Applicant.
MidAmerican Energy will not become or agree to become a co-permittee or operator for
the purpose of applicants' compliance with any local, state or federal permit or plan
associated with storm water pollution prevention or erosion control.
9. It is specifically understood and agreed Applicant must certify that all of the above
requirements shall be met or this Agreement shall be deemed null and void.
If a customer makes a change to their facility that requires MidAmerican Energy Company to
install protect posts around the existing gas meter/s, the customer will be responsible for the cost
to install the posts.
If MidAmerican Energy Company is required to start construction of gas facilities during the
winter season the work will be subject to an additional winter construction charge.
It is MidAmerican Energy Company's responsibility to see that the various utility companies'
facilities are located before our construction. This includes electric, natural gas, telephone, cable
television, and generally water. It is the owner's responsibility to see that any privately owned
systems such as water systems, irrigation systems, drain pipes, septic lines and underground
wiring are located before MidAmerican Energy Company's construction. MidAmerican Energy
Company assumes no liability for private facilities that are not located.
MidAmerican Energy Company installed facilities will remain the property of MidAmerican
Energy Company.
Docusign Envelope ID: 90C731A5-AC54-4CA4-95C6-727D3EC2FDB2
icamerican
ENERGY
OBSESSPVELY. RELENTLESSLY ar YOUR SERVICFA
MidAmerican Energy
Attn: Brad Ballard - DMCC
PO Box 657
Des Moines, IA 50306
If this proposal is satisfactory, please sign and return one (1) copy of this letter to me.
MidAmerican Energy Company will release the work for scheduling upon the receipt of a signed
proposal, site readiness, and payment of $6,100. Please keep us advised of your plans so we may
schedule our construction work at the appropriate time. If you have any questions, please call
me at 515-252-6707.
Please allow a minimum of ten (10) working days notice when requesting your gas meter.
Sincerely,
MidAmerican Energy Company
Brad Ballard
Customer Project Coordinator II
Enclosures: Design Map
�DocuSigned by:
nAtAidi
By:,�
Accepted
eeo78AAcaaao..
Date Service Required:
Docusign Envelope ID: 90C731A5-AC54-4CA4-95C6-727D3EC2FDB2
801 Campbell Ave Waterloo
I 938 I 932 [ I 92oi 1 1 UZZ 1 1 J 11
2" PX 25# (25#) 1994
z
D
CAMPBELL AVE
MS 3735 ; 901 801
Remove 1
i-
1
I
/11
II
II
1/
'
I
I'
1 2" 90* ELL
• 1 2" Flanged riser
L
i 1/4" PL Cap 1
i Install 2" X 1 1/4" PL reducer 1
Install 2" PL Shutoff Valve and Box 1
-I 350' of 2" PL
5M Meter set
P202H Regulator 2" Flange body
1/2" orif, Dark Blue Spring set to 2#
Item: 41-10010220
L
MMIDAMERICAN
EN ERCY CMPANY.
Crew HQ:WAT
Cust: ANTHONY HERMANN
Addr: 801 CAMPBELL AVE
City: WATERLOO
X = 1945261 Y = 907045
WMS_REV:3821851-1
Date: 3/31/2025
Scale: 1 IN = X FT
Designer:MOLLY CLAIRE BROUWER
Job Desc: WATERLOO LEISURE SERVICES
DISCLAIMER OF LIABILITY
NOTE: This drawing reflects facilities in place at the time of its preparation and is subject to change at any time. For current facility information, please contact MidAmerican Energy
Company. Further, MidAmerican Energy Company disclaims all liability and responsibility for all claims and damages including but not limited to, personal injury, death and
property damage, resulting from any authorized or unauthorized use of, or reliance upon, this drawing for any purpose.