HomeMy WebLinkAboutCouncil Packet - 5/19/2025 CITYOF
qo� << TERLOO
IOWA
THE CITY COUNCIL OF WATERLOO, IOWA
WORK SESSION TO BE HELD AT
Harold E. Getty Council Chambers
Monday, May 19, 2025
4:50 PM
RULES FOR WORK SESSION PUBLIC COMMENT
Iowa Code Chapter 21 gives the public the right to attend council meetings, but it does not
require cities to allow public participation except during public hearings.The city council shall
not receive any public comment during a work session.
Roll Call.
Agenda, as proposed or amended.
Approval of Minutes of the April 21, 2025, Council Work Session, as proposed or
amended.
4:50 p.m. Discussion of a sewer rate increase and Waste Management Department
update.
Submitted by: Bridgett Wood, Finance Director, Randy Bennett, Public Works Division
Manager
ADJOURNMENT
Kelley Felchle
City Clerk
Page 1 of 41
April 21, 2025
COUNCIL WORK SESSION
Harold E. Getty Council Chambers
Roll Call.
Members present: Mayor Quentin Hart in the Chair. Mr. Boesen, Mr. Nichols, Mr. Chiles, Mr.
Simon, Ms. Wilder and Mr. Feuss. Ms. Creighton-Smith was absent.
Agenda, as proposed or amended.
Nichols/Wilder
that the agenda as proposed be approved. Voice vote-Ayes: Six. Motion carried.
Approval of Minutes of the April 7, 2025 work session as proposed or amended.
Nichols/Wilder
that the minutes of the April 7, 2025 Council Work Session, as proposed or amended, be
approved. Voice vote-Ayes: Six. Motion carried.
Update from the Sanitation Department.
Randy Bennett, Public Works Division Manager, provided an overview of the structure of the
Sanitation Department. Scott Brunson, Sanitation Director, provided an overview of the
Waterloo WYRE App and the improvements and benefits it provides.
Mr. Chiles questioned if the city would look to bring recycling in-house in the future.
Randy Bennett explained that the city is currently under contract with recycling services.
However, before the contract expires, they can look at the pros, cons, and costs of a change.
Mr. Boesen questioned when the go back charges would begin.
Randy Bennett explained that it will take a while but hopefully by fall.
Mr. Boesen questioned how long the dumpster locking ordinance has been in effect.
Randy Bennett explained that, unfortunately, he was not aware it was in the ordinance until
recently.
Mr. Nichols questioned how to report waste alongside the road.
Randy Bennett explained that citizens can use the app to report an issue.
Mr. Simon commented that, for example, what happens if someone reports a nuisance, like a
chair sitting out in front of someone's house.
Randy Bennett explained that a clean-up like that would first go through code enforcement to
give them a chance to rectify the problem.
ADJOURNMENT
Page 1 of 2
Page 2 of 41
Feuss/Chiles
that the council adjourn at 5:09 p.m. Voice vote-Ayes: Six. Motion carried.
Kelley Felchle
City Clerk
Page 2 of 2
Page 3 of 41
CONSENT DECREE FINALIZATION /
CRITICAL PROJECT LIST CITY OF
WATERLOO WASTE
MANAGEMENT SERVICES
CITU OF
WATERLOO
Waste Management
Sewer Rates after Increase
• Minimum monthly charge $22 . 15 (includes first 3 CCF)
• Minimum quarterly charge $66.44 (includes first 9 CCF)
• Per CCF over minimum monthly $3 .55 per CCF
charge
The average residential user cost will rise by $1.90 per month, while
the minimum quarterly charge will rise by $3 . 16.
Page 5 of 41
Concent Decree Background
• Consent Decree October 2015
• Master Plan Submitted to EPA December 2017
• Amended Master Plan 2020
• Final Amended Master Plan 2023
• 1 Year Demonstration Period began August 2023
• Demonstration Period extended to May 15., 2025
• Termination Request sent to EPA May 13 , 2025
Project #1 the Anaerobic Lagoon
The Anaerobic Lagoon is a critical Asset to WMS treatment capabilities. It treats a Population Equivalent of
324,00 People. The Anaerobic Lagoon takes effluent waste from Tyson Fresh Foods. Without a properly
functioning Anaerobic Lagoon Downstream Wastewater Treatment would be overwhelmed with pollutants.
Tyson Waste Stream
PE In 324,000
90% BOD Removal }�
74% TSS Removal f �
i
PE Out 32,000
I k{ r14
Discharge Combines with Wastes from a
Tannery to Make Up Satellite Influent
Page 7 of 41
Project # 1 Capitot Improvement Needs at
Anaerobic Lagoon
Waterloo, Iowa
Anaerobic Lagoon Upgrades
Funded by State
5/13/2024 Revolving Fund (SRF)
Budget
Lagoon Cover Removal $ 300,000
Lagoon Cover $ 1,500,000
Lagoon Cleaning $ 1,000,000
Piping and Supports $ 800,000
Flare/Gas Safety Equipment $ 400,000
Bldg/Blower Upgrades $ 200,000
Electrical Upgrades $ 100,000
Site Work $ 50,000
subtotal $ 4,350,000
Contingencies @ 30% $ 1,305,000
subtotal $ 5,655,000
Planning, Design, Bidding, Construction Engr $ 1,131,000
Total $ 6,786,000
Page 8 of 41
Project #2 Cattle Congress Lift Station/Force Main
The Cattle Congress Lift Station is a wet pit plus dry pit type wastewater pumping station
originally constructed in 1961. This lift station is a major conveyor in the City of Waterloo collection
system and is in dire need of replacement
snap
ANNIVERSARY
' - 1 HALL
MINIII
M=
_ 'IIS
■■ ■■ ■�
worge
ProjCongressject # 2 CattIe Lift Station/ Force Main
Take-Home Points:
Design Agreement in place with AECOM at cost
of $250,000
Construction Cost expected to be $3.2 Million
Construction Related Services Expected to be
$250,000
Issues expected with Sovern Lands and Land
Clearance
Funded by State Revolving Fund (SRF)
Page 10 of 41
Project #3 Phase 2 Highway 63 Lift Station and Collection System Improvements
Phase 2 Highway 63 Sanitary Sewer Improvements improves Highway 63 Sanitary Sewer Collections from Jane
Street to the Highway 20 Intersection. Phase 2 is critical to economic growth to this area in Greyhound Park and
residential sewer conveyance to the East of Ridgeway Ave
$yY�"
R
PHASE lit a4 PHASE 1
f _ PHASE IF �
pow
V,
y r ry �o• � 7
i
EXISTING 1JTILITI�'3 �r FIGURE fr3
•• hu IeEON-FIgER OPTIC —+ --'CENTUKYI-INK-TELEPHONE PHASE
11
U-d TE RRWATE-rTLVCFtk-r:'IBER OPTIC
-•CRY OF WATERLOO-S++.NITARY 91 V&ER D' 208' 408'
- ---MIOAMI•FIl3EROPTIC ---- CITY OFWATERLOO-STORMSEWER AECOM
JAIVESTREETTONIGNINAY20
--W'INOSTREAM-FIBER OPTPG CITY OF WATERL00-TRAFFIC CONTROL �r PRELIMINARY ENGINEERING RE PORT Pie 11 f 41
MIMCAhiERCAN.ELECTRIC CRY OF WATE
IRLOO.WATER WORKO SCALE U$H14HNfhY E3 90'UTH IHTEF[CEPT4R SEWER UP4
- --•MIDAERCAN-OAS MAY 2x21 CITY OF WATERLOO.IOWA 9063770?
Project #3 Phase 2 Highway 63 Lift Station and Collection System Improvements
Take-Home Points:
Need to enter into Engineering Design Agreement
with at cost of $600,000
Construction Related Services Cost expected to
be $600,000
Construction estimated at $6.0 Million
Total Construction Cost expected $7.2 Million
Funded by State Revolving Fund (SRF)
Page 12 of 41
Project #4 Airline Highway Lift Station and Collection Systems Improvements to
No Name Creek;
With the recent economic developments on Leversee Road, (Northwest Industrial Park), downstream Lift
Station Improvements are necessary at Airline Highway Lift Station and Collection System to No Name Creek
i
MR
FA
r �
3349 33493 3349 z 3349 3349 _ ? �_ #Tfili 3574 35�4'3 35744
3349 -3349 33443M95
33d334% 3349fi-3535976PS766
357 7 3574Qi7Q M35415740 Id
1
Tim -
3349 ••.;��
-=33498 - 3341 �7 _ Q � 4535I42
r
�3349�.334 _
pWQ7 I+ 3349&33487
rp
r 1
3474
Project #4 Airline Highway Lift Station and Collection Systems Improvements to No
Name Creek
Take-Home Points:
Need to enter into Engineering Design Agreement
for lift station only with a cost of $300,000
Construction Related Services Cost for lift station
only expected to be $300,000
Construction for lift station only estimated at $3.0
Million
Total Construction Cost for Lift Station expected
$3.6 Million
Cost for Collection system improvements
downstream still being vetted by consulting
engineer
Funded by TIF Funds
Page 14 of 41
rtAll, • L T T J / '
,•; .,s �.al 7R "1 � ,F��• r # Y{T Ste{ t y� _ ■{y -,. ",
' � ` 4 i #fid � �'� ti•s +. ■ � *-* �'�. f .+�- �y��5 ' Y* 'y' , - ,
+h . 'rt* lb
oe
s' t!
Ap
006
Expected finish
Project #S Titus Lift Station/ Force MainSurnmer 2025
Take-Home Points:
Design with AECOM at cost of $470,000
Construction Related Services Cost expected to be
$595,000
Construction bid at $6.2 Million
Total Cost $7.265 Million
Picture below is representation of what newly
:o
ISOON
Page 16 of 41
Project #6 Ongoing Cure in Place Pipe .
This is the annual targeted area to perform CIPP on existing
infrastructure .
• Annual CIPP Budget Currently @ $1,000,000 a
year
• Assists in reducing infiltration and inflow ( I & I )
Page 17 of 41
Project #7 Liquid Improvements/Nutrient Reduction Engineering Design Phase 2
WWTP History
1990s: Most of the facilities were constructed
Two plants were constructed side-by-side
—20 year life
2012: One plant was "mothballed" because
the capacity wasn't needed and it was costly to
operate.
2024 Plans in place to re-activate "mothballed" _ x
Satellite plant to meet DNR Requirements
2017/18: Major planning effort in conjunction
with DNR required nutrient removal study �, f
Phased WWTP upgrades recommended
Ultimately combine the two plants to - -
provide capacity while meeting DNR
requirements for Nutrient Reduction -
1 -
$101 million in three phases. Phase 1 �
Biosolids Improvements Completed atl l __
cost of $18 Million
Phase 2 Cost in 2024 Dollars at $51
million
Project #7 Liquid Improvements/Nutrient Reduction Engineering Design
Take-Home Points:
WWTP capacity needs to be expanded or
Economic growth/industry/jobs will be
impacted
Lowest cost plan is still to combine the plants
while achieving nutrient reductions per DNR
requirements
-$94 million total cost (2023 dollars)
Next phase is to increase capacity while
removing nutrients - $51 million (2024 dollars)
Timing is becoming critical as the next phase
will take 5 years to provide the needed capacity
COST TO BEGIN DESIGN $ 390609000 2024
Dollars
Easton Plant Built -1998
�'�fnlli�n Dlnnf Ridif - 1009 Page 19 of 41
In House rehabilitation of Lift Stations
• Updating electrical controls, alarm systems
and Programmable Logic Controllers ( PLC)
• PLC will integrate with Fiber Backbone to
allow stations to be visible via city's current
Supervisory Control and Data Acquisition
(SCADA) system
• Replacement of outdate mechanical
systems ( pumps, valves, piping)
• Bringing equipment up to present day
standards
Page 20 of 41
Midland/Titus Lift Station (1955) Contract 975
NEW Cattle Congress Lift Station and Force Main(1961)
Lift Station -Airline(1968) (1) (CAN)
Lift Station -63 South(1975) (2) (CAN)
Lift Station -Triangle (1977) (3 )(CAN)
Lift Station - Cedar Terrace (1974) (4) (CAN)
Douglas Lift Station (1942) Rehab
Lift Station Rehab - Hawkeye(1971) (5)
In House I Lift Station Rehab- David (1981) (6)
Lift Station Rehab - Park Road(1967) (7)
rehabilitatio Hackett Lift Station and Force Main Remodel(1960)
Lift Station Rehab -Webster(1971) (8)
of Lidt Station Rehab-Virigina(1954) (9)
Lift Station Rehab - Garden Avenue(1960) (10)
Lift Stations Lift Station Rehab - Greenbrier(1962) (11)
Lift Station Rehab - Midway(1960) (12)
Lift Station Rehab - Byrnbrae(1947) (13)
Gates Golf Course Lift Station(1956)
Country View (Currently Managing) (1988)
City Hall Lift Station (1991)
Ball Park Lift Station
LaPorte Road (South View) Lift Station (2013)
Public Works Lift Station (2011)
Tower Park/ Dry Run Creek(2021)
Page 21 of 41
Equipment and Vehicle Replacement
Program
• Sewer Cleaning equipment aging
• Replace equipment before
maintenance cost increase and
there is still value left in
equipment
• Keep equipment up to present
day standards
Page 22 of 41
CONSENT DECREE FINALIZATION /
CRITICAL PROJECT LIST CITY OF
WATERLOO WASTE
MANAGEMENT SERVICES
CITU OF
WATERLOO
Waste Management
Sewer Rates after 5 % Increase FY2026
• Minimum monthly charge $22 . 15 (includes first 3 CCF)
• Minimum quarterly charge $66.44 (includes first 9 CCF)
• Per CCF over minimum monthly $3 .55 per CCF
charge
The average residential user cost will rise by $1.90 per month, while
the minimum quarterly charge will rise by $3 . 16.
Page 24 of 41
Concent Decree Background
• Consent Decree October 2015
• Master Plan Submitted to EPA December 2017
• Amended Master Plan 2020
• Final Amended Master Plan 2023
• 1 Year Demonstration Period began August 2023
• Demonstration Period extended to May 15., 2025
• Termination Request sent to EPA May 13 , 2025
Project #1 the Anaerobic Lagoon
The Anaerobic Lagoon is a critical Asset to WMS treatment capabilities. It treats a Population Equivalent of
324,00 People. The Anaerobic Lagoon takes effluent waste from Tyson Fresh Foods. Without a properly
functioning Anaerobic Lagoon Downstream Wastewater Treatment would be overwhelmed with pollutants.
Tyson Waste Stream
PE In 324,000
90% BOD Removal }�
74% TSS Removal f �
i
PE Out 32,000
I k{ r14
Discharge Combines with Wastes from a
Tannery to Make Up Satellite Influent
Page 26 of 41
Project # 1 Capitot Improvement Needs at
Anaerobic Lagoon
Waterloo, Iowa
Anaerobic Lagoon Upgrades
Funded by State
5/13/2024 Revolving Fund (SRF)
Budget
Lagoon Cover Removal $ 300,000
Lagoon Cover $ 1,500,000
Lagoon Cleaning $ 1,000,000
Piping and Supports $ 800,000
Flare/Gas Safety Equipment $ 400,000
Bldg/Blower Upgrades $ 200,000
Electrical Upgrades $ 100,000
Site Work $ 50,000
subtotal $ 4,350,000
Contingencies @ 30% $ 1,305,000
subtotal $ 5,655,000
Planning, Design, Bidding, Construction Engr $ 1,131,000
Total $ 6,786,000
Page 27 of 41
Project #2 Cattle Congress Lift Station/Force Main
The Cattle Congress Lift Station is a wet pit plus dry pit type wastewater pumping station
originally constructed in 1961. This lift station is a major conveyor in the City of Waterloo collection
system and is in dire need of replacement
snap
ANNIVERSARY
' - 1 HALL
MINIII
M=
_ 'IIS
■■ ■■ ■�
I
x t' ' Page 28 of 41
ProjCongressject # 2 CattIe Lift Station/ Force Main
Take-Home Points:
Design Agreement in place with AECOM at cost
of $250,000
Construction Cost expected to be $3.2 Million
Construction Related Services Expected to be
$250,000
Issues expected with Sovern Lands and Land
Clearance
Funded by State Revolving Fund (SRF)
Page 29 of 41
Project #3 Airline Highway Lift Station and Collection Systems Improvements to
No Name Creek;
With the recent economic developments on Leversee Road, (Northwest Industrial Park), downstream Lift
Station Improvements are necessary at Airline Highway Lift Station and Collection System to No Name Creek
i
MR
FA
r �
3349 33493 3349 z 3349 3349 _ ? �_ #Tfili 3574 35�4'3 35744
3349 -3349 33443M95
33d334% 3349fi-3535976PS766
357 7 3574Qi7Q M35415740 Id
1
Tim -
3349 ••.;��
-=33498 - 3341 �7 _ Q � 4535I42
r
�3349�.334 _
pWQ7 I+ 3349&33487
rp
r 1
3474
Project #3 Airline Highway Lift Station and Collection Systems Improvements to No
Name Creek
Take-Home Points:
Need to enter into Engineering Design Agreement
for lift station only with a cost of $300,000
Construction Related Services Cost for lift station
only expected to be $300,000
Construction for lift station only estimated at $3.0
Million
Total Construction Cost for Lift Station expected
$3.6 Million
Cost for Collection system improvements
downstream still being vetted by consulting
engineer
Funded by TIF Funds
Page 31 of 41
Project #4 Phase 2 Highway 63 Lift Station and Collection System Improvements
Phase 2 Highway 63 Sanitary Sewer Improvements improves Highway 63 Sanitary Sewer Collections from Jane
Street to the Highway 20 Intersection. Phase 2 is critical to economic growth to this area in Greyhound Park and
residential sewer conveyance to the East of Ridgeway Ave
$yY�"
R
PHASE lit a4 PHASE 1
f _ PHASE IF �
pow
V,
y r ry �o• � 7
0110P %61�
i
EXISTING UTILITIES �r � FIGURE&-3
•• AU:tFON-FIFWR OPTIC -+ --'CENTUKYLINK-TELEPHONE PHASE 11
UI.11TE RRWATE-rTWOFtk-R'IBER 8o'TIO -•CRY OF WATERLOO-S++.NITARY 91 Y&RR D' 208' 408'
-�---M IMAM.FI6ER OPTIC ---- CITY OF WATERLOG-STORM SEWER AECOM
JAN E STREET TO H I G H WAY 20
--w1N0$TREAM-FIBER oPTrc CITY OF WATERL00-TRAFFIC CONTROL �r PRELIMINARY ENGINEERING REPORT Pie 32 f 41
MIDAMERICAN.ELECTRIC CRY OF WATERLOO.WATER WORKO SCALE U$H14HNfhY E3 94UTH INTERCEPTOR SEWER 11P4
- --•MIDAMERICAN-OAS MAY 2GZ1 CITY OF WATERLOO.IOWA 90637702
Project #4 Phase 2 Highway 63 Lift Station and Collection System Improvements
Take-Home Points:
Need to enter into Engineering Design Agreement
with at cost of $600,000
Construction Related Services Cost expected to
be $600,000
Construction estimated at $6.0 Million
Total Construction Cost expected $7.2 Million
Funded by State Revolving Fund (SRF)
Page 33 of 41
Project #7 Liquid Improvements/Nutrient Reduction Engineering Design
Take -Home Points:
WWTP capacity needs to be expanded or
Economic growth/industry/jobs will be
impacted
Lowest cost plan is still to combine the plants
while achieving nutrient reductions per DNR
requirements
-$94 million total cost (2023 dollars)
Next phase is to increase capacity while
removing nutrients - $51 million (2024 dollars)
Timing is becoming critical as the next phase
will take 5 years to provide the needed capacity
COST TO BEGIN DESIGN $ 390609000 2024
Dollars
Easton Plant Built -1998
Din"+ Ri di+ — 1009 Page 38 of 41
In House rehabilitation of Lift Stations
• Updating electrical controls, alarm systems
and Programmable Logic Controllers (PLC)
• PLC will integrate with Fiber Backbone to
allow stations to be visible via city's current
Supervisory Control and Data Acquisition
(SCADA) system
• Replacement of outdate mechanical
systems (pumps, valves, piping)
• Bringing equipment up to present day
standards
Page 39 of 41
(Midland/Titus Lift Station (1955) Contract 975
NEW Cattle Congress Lift Station and Force Main (1961)
Lift Station - Airline (1968) (1) (CAN)
Lift Station - 63 South (1975) (2) (CAN)
Lift Station - Triangle (1977) (3 )(CAN)
Lift Station - Cedar Terrace (1974) (4) (CAN)
Douglas Lift Station (1942) Rehab
Lift Station Rehab - Hawkeye (1971) (5)
Lift Station Rehab- David (1981) (6)
Lift Station Rehab - Park Road (1967) (7)
Hackett Lift Station and Force Main Remodel (1960)
Lift Station Rehab - Webster (1971) (8)
Lidt Station Rehab - Virigina (1954) (9)
Lift Station Rehab - Garden Avenue (1960) (10)
Lift Station Rehab - Greenbrier (1962) (11)
Lift Station Rehab - Midway (1960) (12)
Lift Station Rehab - Byrnbrae (1947) (13)
Gates Golf Course Lift Station (1956)
Country View (Currently Managing) (1988)
City Hall Lift Station (1991)
Ball Park Lift Station
LaPorte Road (South View) Lift Station (2013)
Public Works Lift Station (2011)
Tower Park / Dry Run Creek (2021)
Page 40 of 41
Equipment and Vehicle Replacement
Program
• Sewer Cleaning equipment aging
• Replace equipment before
maintenance cost increase and
there is still value left in
equipment
• Keep equipment up to present
day standards
Page 41 of 41