Loading...
HomeMy WebLinkAboutMatt Construction, Inc. - South_Hills - 5.5.2025 Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA 1A Document A1 01 - 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the Fifth day of May in the year Two Thousand Twenty-Five (In words, indicate day, month and year.) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added information needed for its (Name, legal status, address and other information) completion.The author may also have revised the text of the original City of Waterloo AIA standard form.An Additions and 1101 Campbell Ave. Deletions Report that notes added Waterloo,IA 50701 information as well as revisions to Telephone Number:319-291-0141 the standard form text is available from the author and should be reviewed.A vertical line in the left and the Contractor: margin of this document indicates (Name, legal status, address and other information) where the author has added necessary information and where Matt Construction,Inc. the author has added to or deleted 203 Y Avenue from the original AIA text. Sumner,Iowa 50674 This document has important legal Telephone Number:(563)578-8418 consequences.Consultation with an attorney is encouraged with respect to its completion or modification. for the following Project: The parties should complete (Name, location and detailed description) A1010-2017,Exhibit A,Insurance and Bonds,contemporaneously with F.Y.2025 South Hills Golf Course Maintenance Building Contract No. 1130 this Agreement.AIA Document 1830 East Shaulis Road A201ED-2017,General Conditions of Waterloo,IA 50701 the Contract for Construction,is Construction of a maintenance building for the City of Waterloo's South Hills Golf adopted in this document by Course consisting of office and break room space,toilet room,utility room,chemical reference.Do not use with other storage and heated shop space.The project is a new 1,605 square foot wood post-frame general conditions unless this building with a prefinished corrugated steel roof over wood trusses.Exterior cladding is document is modified. to be prefinished corrugated steel panels over insulated walls.Interior finishes to be sealed concrete floors,painted gypsum wallboard walls and ceilings.HVAC in the office to be provided a mini-split system with supplemental electric baseboard heaters.HVAC in the shop area is provided by electric blower heaters.HVAC in the chemical storage area is provided by ceiling mounted electrical radiant heaters.Oil/sand separator will be installed outside of building.Site work is limited to gravel approaches at overhead doors and finish grading around building. The Architect: (Name, legal status, address and other information) Cannon Moss Brygger&Associates P.C.,dba CMBA Architects 3228 Cedar Heights Drive Cedar Falls,IA 50613 Telephone Number:319.277.5636 The Owner and Contractor agree as follows. Init. AIA DocumentA101—2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not / for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (389ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary,and other Conditions),Drawings,Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement,and Modifications issued after execution of this Agreement,all of which form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein.The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations,or agreements,either written or oral.An enumeration of the Contract Documents,other than a Modification,appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents,except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3.1 The date of commencement of the Work shall be: (Check one of the follotiving boxes.) [X] The date of this Agreement. [ ] A date set forth in a notice to proceed issued by the Owner. [ ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected,then the date of commencement shall be the date of this Agreement. §3.2 The Contract Time shall be measured from the date of commencement of the Work. §3.3 Substantial Completion §3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Contractor shall achieve Substantial Completion of the entire Work: Mit. AIA Document A101—2017.CopyrightO 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The 2 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not t for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA (Check one of the following boxes and complete the necessary information.) [ ] Not later than ( )calendar days from the date of commencement of the Work. [X] By the following date:November 14,2025. (Paragraph Deleted) (Table Deleted) (Paragraph Deleted) ARTICLE 4 CONTRACT SUM §4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be Two Hundred and Thirty Thousand Nine Hundred Fifty-Eight Dollars and Zero Cents($230,958.00),subject to additions and deductions as provided in the Contract Documents. §4.2 Alternates §4.2.1 Alternates,if any,included in the Contract Sum: Item Price Alternate 1 -Trench drain and oil/sand $5,600.00 separator Alternate 2-24 Gauge Steel on west $558.00 side of building (Paragraphs Deleted) (Table Deleted) §4.3 Allowances,if any,included in the Contract Sum: (Identify each allowance) Item Price Contingency Allowance $10,000.00 (Paragraphs Deleted) (Table Deleted) (Paragraphs Deleted) I i AIA Document A101—2017.Copyright@ 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights Init. reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The 3 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not t for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA ARTICLE 5 PAYMENTS §5.1 Progress Payments §5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect,the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. §5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month,or as follows: §5.1.3 Provided that an Application for Payment is received by the Architect not later than the last day of a month, the Owner shall make payment of the amount certified to the Contractor not later than the last day of the following month.If an Application for Payment is received by the Architect after the application date fixed above,payment of the amount certified shall be made by the Owner not later than Thirty(30)days after the Architect receives the Application for Payment. (Federal, state or local laivs may require payment within a certain period of time.) §5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work.The schedule of values shall be prepared in such form,and supported by such data to substantiate its accuracy,as the Architect may require.This schedule of values shall be used as a basis for reviewing the Contractor's Applications for Payment. §5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. §5.1.6 In accordance with AIA Document A201TM--2017,General Conditions of the Contract for Construction,and subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: §5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction,or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing;and .3 That portion of Construction Change Directives that the Architect determines,in the Architect's professional judgment,to be reasonably justified. §5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; .2 The amount,if any,for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201-2017; .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application,any amount for which the Architect may withhold payment,or nullify a Certificate of Payment in whole or in part,as provided in Article 9 of AIA Document A201-2017;and .5 Retainage withheld pursuant to Section 5.1.7. §5.1.7 Retainage §5.1.7.1 For each progress payment made prior to Substantial Completion of the Work,the Owner may withhold the following amount,as retainage,from the payment otherwise due: (Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.) 3% Init. AIA Document A101—2017.Copyright@ 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The 4 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not t for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA §5.1.7.1.1 The following items are not subject to retainage: (Insert any items not subject to the withholding of retainage,such as general conditions, insurance, etc) §5.1.7.2 Reduction or limitation of retainage,if any,shall be as follows: (If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion ofportions of the Work as provided in Section 3.3.2, insert provisions for such modifications) Retainage to be reduced in accordance with the laws of the State of Iowa,as applicable. §5.1.7.3 Except as set forth in this Section 5.1.7.3,upon Substantial Completion of the Work,the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7.The Application for Payment submitted at Substantial Completion shall not include retainage as follows: (Insert any other conditions for release of retainage upon Substantial Completion) §5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor,the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201-2017. §5.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or equipment which have.not been delivered and stored at the site. §5.2 Final Payment §5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of AIA Document A201-2017,and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by the Architect. §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: §5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below,or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) 6.00%per annum ARTICLE 6 DISPUTE RESOLUTION §6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017,unless the parties appoint below another individual,not a party to this Agreement,to serve as the Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect) Init. AIA DocumentA101—2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved.'The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The 5 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not / for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (389ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA §6.2 Binding Dispute Resolution For any Claim subject to,but not resolved by,mediation pursuant to Article 15 of AIA Document A201-2017,the method of binding dispute resolution shall be as follows: (Check the appropriate box.) [ ] Arbitration pursuant to Section 15.4 of AIA Document A201-2017 [X] Litigation in a court of competent jurisdiction [ ] Other(Specify) If the Owner and Contractor do not select a method of binding dispute resolution,or do not subsequently agree in writing to a binding dispute resolution method other than litigation,Claims will be resolved by litigation in a court of competent jurisdiction. ARTICLE 7 TERMINATION OR SUSPENSION §7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2017. (Paragraphs Deleted) §7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2017. ARTICLE 8 MISCELLANEOUS PROVISIONS §8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2017 or another Contract Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. §8.2 The Owner's representative: (Name, address, email address, and other information) Mayor Quentin Hart 1101 Campbell Ave. Waterloo,IA 50701 Telephone Number:319.391.4301 Email Address:Email Address:mayor@waterloo-ia.org §8.3 The Contractor's representative: (Name, address, email address, and other information) Megan Matt-Callahan 203 Y Avenue Sumner,Iowa 50674 Telephone Number: 563-578-8418 Email Address:megan.mattconstruction@gmail.com Init. AIA Document A101—2017.Copyright 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,'"AIA,'the AIA Logo,and"AIA Contract Documents"are trademarks of The 6 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not / for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (389ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA §8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days' prior notice to the other party. §8.5 Insurance and Bonds §8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101TM_ 2017,Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A,Insurance and Bonds,and elsewhere in the Contract Documents. §8.5.2 The Contractor shall provide bonds as set forth in AIA Document A101TM-2017 Exhibit A,and elsewhere in the Contract Documents. (Paragraphs Deleted) §8.7 Other provisions: If litigation is instituted in connection with an controversey arising out of this Agreement or to interpret or enforce any rights under this Agreement,the prevailing party shall be entitled to recover from the non-prevailing party all attorney fees,costs,expert witness fees and litigation expenses incurrred by prevailing party,including those incurred on appeal. RTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS §9.1 This Agreement is comprised of the following documents: .1 AIA Document AlolTM-2017,Standard Form of Agreement Between Owner and Contractor .2 AIA Document AJO1Tm-2017,Exhibit A,Insurance and Bonds .3 AIA Document A201Tm-2017,General Conditions of the Contract for Construction (Paragraph Deleted) (Insert the date of the building information modeling exhibit incorporated into this Agreement.) .5 Drawings Number Title Date See attached Exhibit B Sheet Index .6 Specifications Section Title Date Pages See attached Exhibit C Table of Contents .7 Addenda,if any: Number Date Pages Addendum# Addendum#1 April 17,2025 9 Addendum#2 April 22,2025 2 Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9. Init. AIA Document A101—2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents'are trademarks of The 7 American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not / for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA .8 Other Exhibits: (Check all boxes that apply and include appropriate information identifying the exhibit where required.) (Paragraphs Deleted) (Paragraph Deleted) (Table Deleted) (Paragraph Deleted) (Table Deleted) (Paragraphs Deleted) This Agreement entered into as of the day and year first written above. DocuSigned by: Ft�C, V, AAkf 'A^ A✓�✓'` VV/'M tgna acre) CONT TOR(Signature) VV/ Mayor Quentin Hart,City of Waterloo Mayor Megan Matt-Callahan,Project Manager (Printed name and title) (Printed name and title) Init. AIA Document A101—2017.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not t for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA43) Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA Exhibit Sheef Index General G1.0 TITLE SHEET civil C1.0 CIVIL PLANS Sludural S1 FOUNDATION AND ROOF FRAMING PLAN WITH GENERAL NOTES S2 STRUCTURAL DETAILS Architectural A2.0 PLANS &SCHEDULE A3.0 EXTERIOR ELEVATIONS A5.0 BUILDING SECTIONS &WALL SECTION A7.0 TOILET INFORMATION, CASEWORK ELEVATIONS & FINISH SCHEDULE A8.0 OPENING SCHEDULE & DETAILS Electrical E1.0 POWER PLAN Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA Exhibit SECTION 00 01 10 TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 00 00 Cover Sheet 0001 07 Seals Pages 0001 10 Table of Contents 0011 13 Notice to Bidders 0021 13 Instructions to Bidders 0031 00 Available Project Information 00 40 00 Procurement Forms and Supplements 0041 00 Bid Form 00 50 00 Contracting Forms and Supplements Non-Collusion Affidavit(Prime) Non-Collusion Affidavit(Subcontractor) Equal Opportunity Clause Title VI Civil Rights Bidder Status Form Affirmative Action Program SPECIFICATIONS DIVISION 01 -GENERAL REQUIREMENTS 01 1000 Summary 01 2000 Price and Payment Procedures 01 21 00 Allowances 01 2300 Alternates 01 3000 Administrative Requirements 01 4000 Quality Requirements 01 5000 Temporary Facilities and Controls 01 6000 Product Requirements 01 6010 Substitution Procedures 01 6010.01 Substitution Request Form 01 7000 Execution and Closeout Requirements 01 7800 Closeout Submittals DIVISION 02 - EXISTING CONDITIONS (NOT USED) DIVISION 03 -CONCRETE 03 30 00 Cast-in-Place Concrete 03 35 11 Concrete Floor Finishes DIVISION 04— MASONRY(NOT USED) DIVISION 05 - METALS (NOT USED) DIVISION 06 -WOOD, PLASTICS,AND COMPOSITES 06 10 00 Rough Carpentry 06 17 53 Shop-Fabricated Wood Trusses 0641 00 Architectural Wood Casework F.Y. 2025 South Hills Golf Course 0001 10 Maintenance Building TABLE OF CONTENTS City of Waterloo Leisure Services Page 1 of 2 Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA DIVISION 07 -THERMAL AND MOISTURE PROTECTION 0721 00 Thermal Insulation 0721 26 Blown Insulation 07 26 00 Vapor Retarders 07 26 13 Under-Slab Vapor Retarders 07 27 00 Air Barriers 07 62 00 Sheet Metal Flashings and Trim 07 92 00 Joint Sealants DIVISION 08 -OPENINGS 0811 13 Hollow Metal Doors and Frames 08 36 13 Sectional Doors 08 53 13 Vinyl Fixed Windows 0871 00 Door Hardware DIVISION 09 - FINISHES 0921 16 Gypsum Board Assemblies 0991 13 Exterior Painting 0991 23 Interior Painting DIVISION 10 -SPECIALTIES 10 14 00 Signage 10 28 00 Toilet Accessories 10 44 00 Fire Protection Specialties DIVISION 11 - EQUIPMENT (NOT USED) DIVISION 12 - FURNISHINGS 12 36 00 Countertops DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 - CONVEYING EQUIPMENT (NOT USED) DIVISION 21 - FIRE SUPPRESSION (NOT USED) DIVISION 22— PLUMBING (NOT USED) DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) (NOT USED) DIVISION 26— ELECTRICAL (NOT USED) DIVISION 27—COMMUNICATIONS (NOT USED) DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (NOT USED) DIVISION 31 - EARTHWORK (NOT USED, SEE DRAWINGS) DIVISION 32 - EXTERIOR IMPROVMENTS (NOT USED) DIVISION 33 - UTILITES (NOT USED, SEE DRAWINGS) END OF SECTION F.Y. 2025 South Hills Golf Course 0001 10 Maintenance Building TABLE OF CONTENTS City of Waterloo Leisure Services Page 2 of 2 Docusign Envelope ID: 196F35D1-5F00-498C-862F-A279E83711AA Certification of Document's Authenticity AIA° Document D401 TM - 2003 I,Dan Levi,hereby certify,to the best of my knowledge,information and belief,that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 10:56:58 CT on 05/29/2025 under Order No.4104246108 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA®Document Al0lTM-2017,Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum,other than those additions and deletions shown in the associ d Additions and Deletions Report. (Signed) Principal Architect (Title) 5.5.2025 (Dated) AIA Document D401—2003.Copyright©1992 and 2003.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 10:56:58 CT on 05/29/2025 under Order No.4104246108 which expires on 05/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA43)