HomeMy WebLinkAboutPeters_Construction_-_Terminal_Canopy_-_CO__2_-_6.2.2025 Docusign Envelope ID:01103EED-CIAO-4BA5-BO38-OC40EB96CC3F
CHANGE ORDER NO. 2
Owner: Waterloo Regional Airport, City of Waterloo,Iowa Date: April 10,2025
Project: Terminal Parking Canopy Structure
Owner's Contract No. ICAIF Project No. 9I220AL0400
Contract No. 0004232
Contractor: Peters Construction Corporation
Date of Contract Start: November 6, 2023
You are directed to make the following changes in the Contract Documents. Description:
Item Contract Percent Revised
No. Description Unit Unit Price QuantityChange ChaneQuantityAmount
107 HEAT TRACE CREDIT LS $ (3,445.00) - 1.0 - 1.0 $ (3,445.00)
108 CAMERA TRANSFORMER AND LS $ 3,960.65 - 1.0 - 1.0 $ 3,960.65
POWER WIRING
109 EXTRA PAVING AT EXIT FOR LS $ 5,991.30 - 1.0 - 1.0 $ 5,991.30
LINE LOOPS
110 WIRELESS BRIDGES CREDIT LS $ (1,622.98) 1.0 - 1.0 $ (1,622.98)
Total Change Order $ 4,883.97
Reason for Change Order:
107—Item added to remove heat trace for down drainpipes from the scope of work.
108—Item added to provide 120V power for cameras.
109—Item added to allow installation of vehicle loop detectors in concrete.
I 10—Item added to remove wireless communication bridge relocations from the scope of work.
ICAIF Project No—9I220AL0400 CO-2 Project No—60723532
Contract No. 0004232
Docusign Envelope ID:01103EED-CIAO-4BA5-BO38-OC40EB96CC3F
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: S 2.382.854.00 Original: 380
Previous C.O.s (ADD): S 27,04892 Previous C.O.s(ADD): 10
This C.O. (ADD): $ 4.883.97 This C.O. (DEDUCT): 0
Contract Price with all REVISED: 390
approved Change Orders: S 2,414,786.89
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By:�] ' ", 3 ) April 10, 2025
Engineer(Authorized Signature) Date
APP boded by:
�v, A
A 6/2/2025
By. D0525 8A 8449.
Owner�'�ut orized Signature) Date
ACCEPTED:
By:�i y110J2 S
Contractor(Authorized Signature) Date
ICAIF Project No—9I220AL0400 CO-2 Project No—60723532
Contract No. 0004232
2