Loading...
HomeMy WebLinkAboutPeters_Construction_-_Terminal_Canopy_-_CO__2_-_6.2.2025 Docusign Envelope ID:01103EED-CIAO-4BA5-BO38-OC40EB96CC3F CHANGE ORDER NO. 2 Owner: Waterloo Regional Airport, City of Waterloo,Iowa Date: April 10,2025 Project: Terminal Parking Canopy Structure Owner's Contract No. ICAIF Project No. 9I220AL0400 Contract No. 0004232 Contractor: Peters Construction Corporation Date of Contract Start: November 6, 2023 You are directed to make the following changes in the Contract Documents. Description: Item Contract Percent Revised No. Description Unit Unit Price QuantityChange ChaneQuantityAmount 107 HEAT TRACE CREDIT LS $ (3,445.00) - 1.0 - 1.0 $ (3,445.00) 108 CAMERA TRANSFORMER AND LS $ 3,960.65 - 1.0 - 1.0 $ 3,960.65 POWER WIRING 109 EXTRA PAVING AT EXIT FOR LS $ 5,991.30 - 1.0 - 1.0 $ 5,991.30 LINE LOOPS 110 WIRELESS BRIDGES CREDIT LS $ (1,622.98) 1.0 - 1.0 $ (1,622.98) Total Change Order $ 4,883.97 Reason for Change Order: 107—Item added to remove heat trace for down drainpipes from the scope of work. 108—Item added to provide 120V power for cameras. 109—Item added to allow installation of vehicle loop detectors in concrete. I 10—Item added to remove wireless communication bridge relocations from the scope of work. ICAIF Project No—9I220AL0400 CO-2 Project No—60723532 Contract No. 0004232 Docusign Envelope ID:01103EED-CIAO-4BA5-BO38-OC40EB96CC3F CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: S 2.382.854.00 Original: 380 Previous C.O.s (ADD): S 27,04892 Previous C.O.s(ADD): 10 This C.O. (ADD): $ 4.883.97 This C.O. (DEDUCT): 0 Contract Price with all REVISED: 390 approved Change Orders: S 2,414,786.89 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By:�] ' ", 3 ) April 10, 2025 Engineer(Authorized Signature) Date APP boded by: �v, A A 6/2/2025 By. D0525 8A 8449. Owner�'�ut orized Signature) Date ACCEPTED: By:�i y110J2 S Contractor(Authorized Signature) Date ICAIF Project No—9I220AL0400 CO-2 Project No—60723532 Contract No. 0004232 2