Loading...
HomeMy WebLinkAbout2025-321-06.02.2025.docDocusign Envelope ID: F820E014-BAB8-4D39-8EF1-5AFD754AD52C Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo, IA 50703, (319) 291-4323. RESOLUTION NO. 2025-321 RESOLUTION APPROVING COMPLETION OF PROJECT AND RECOMMENDATION OF ACCEPTANCE OF WORK FOR WORK PERFORMED BY BAKER ENTERPRISES, INC., OF WAVERLY, IOWA, IN THE AMOUNT OF $429,626.56 IN CONJUNCTION WITH THE FY 2025 STATE STREET SANITARY SEWER REPLACEMENT AND STORM SEWER DISCONNECTS, CONTRACT NO. 1110, AND RECEIVE AND FILE A TWO-YEAR MAINTENANCE BOND. WHEREAS Baker Enterprises, Inc., of Waverly, Iowa, has completed the work associated with the FY 2025 State Street Sanitary Sewer Replacement and Storm Sewer Disconnects, under Contract No. 1110; and WHEREAS, the final project cost is calculated at $429,626.56, aligning with project specifications and contractual obligations; and WHEREAS, the project has been inspected and approved by the City Engineer, with a recommendation for acceptance of the work performed; and WHEREAS, the contractor has provided a two-year maintenance bond, ensuring quality and performance of the work completed; NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, 1. The work completed by Baker Enterprises, Inc., for the FY 2025 State Street Sanitary Sewer Replacement and Storm Sewer Disconnects, Contract No. 1110, is hereby accepted as complete and satisfactory in conformity with contract specifications. 2. The City of Waterloo accepts the two-year maintenance bond provided by Baker Enterprises, Inc., filed as part of the project closeout documentation to ensure ongoing maintenance and quality assurance. PASSED AND ADOPTED this 2nd day of June 2025. LDocuSigned by: aCt&fitA. A -art D0�25 8AA 8 49... Quentm art ayor ATTEST: Signed by: LeAnn ?:°liven; Deputy City Clerk SEAL