Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
INVISION_Architecture_-_Amendment_No._1_-_addl_services_Raker_Rhodes_-_6.16.2025
Docusign Envelope ID:A8FE78FB-1 CEE-4C1 E-A85F-EAE04COAF869 \17W//AIA Document G802° - 2017 Amendment to the Professional Services Agreement PROJECT: (name and address) AGREEMENT INFORMATION: AMENDMENT INFORMATION: 24102 City Hall 2025 Date:January 20,2025 Amendment Number:001 100 E 4th St. Date:May 28,2025 Waterloo,IA 50703 OWNER:(name and address) ARCHITECT:(name and address) City of Waterloo INVISION Architecture,LLC 715 Mulberry St. 360 Westfield Ave Waterloo,IA 50703 Suite 401 Waterloo,IA 50701 The Owner and Architect amend the Agreement as follows: Additional services for Raker Rhodes to conduct a cursory structural analysis of the Regions Bank Building to evaluate its feasibility for conversion from a Risk Level 2 office building to a Risk Level 4 facility for the Police Department,should renovations to the Courier Building exceed the cost of aquiring the Regions Bank property.The scope of work will include the following-ADD$10,000 -Reviewing existing structural drawings and current building conditions(as needed) -Assessing the lateral and roof framing systems for compliance with wind,seismic,and snow load requirements under current code -Determining the extent of potential structural retrofits or supplemental framing needed to support the change in occupancy -Preparing a short report outlining findings,recommendations,and annotated architectural concept plans -Participating in a virtual meeting with the client and Owner to present and discuss the results § 1.1.11.1 Consultants retained under Basic Services: 1 Structural Engineer: Raker Rhodes Engineering 4717 Grand Ave. Des Moines,IA 50312 The Architect's compensation and schedule shall be adjusted as follows: Compensation Adjustment: ADD$10,000 Fee summary: Original Contract $420,000.00 Amendment 01 $22,700.00 Amendment 02 $10,000.00 Total Compensation $452,700.00 AIA Document G802—2017.Copyright @ 2000,2007 and 2017.All rights reserved.'The American Institute of Architects,""American Institute of Architects," "AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 15:25:32 CT on 05/28/2025 under Order No.3104238829 which expires on 06/29/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADME) Docusign Envelope ID:A8FE78FB-10EE-4C1E-A85F-EAE04COAF869 Schedule Adjustment: Study anticipated to be complete early June 2025 SIGNATURES: INVISION Architecture,LLC City of Waterloo ARCHITECT(Firm name) CIVPEI��Firm name) ocu i ned by: SIGNATURE 08449.. Kathryn A. Payne,AIA Quentin Hart , Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE May 29, 2025 6/16/2025 DATE DATE AIA Document G802—2017.Copyright©2000,2007 and 2017.All rights reserved.`The American Institute of Architects,""American Institute of Architects," "AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 15:25:32 CT on 2 05/28/2025 under Order No.3104238829 which expires on 06/29/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA4E)