Loading...
HomeMy WebLinkAboutPeters_Construction_CO_2,_Cont._No._1077_-_Byrnes_Aquatic_Center_-_7.21.2025 Docusign Envelope ID:0OF41629-38EB-4A7D-B85B-C7012A773B32 IIN17W1/AIA Document G701 ° - 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 22095 Byrnes Park Aquatic Center Contract For:General Construction Change Order Number:002 801 Campbell Ave. Date:November 6,2023 Date:May 19,2025 Waterloo,IA 50701 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address) City of Waterloo INVISION Architecture,LLC Peters Construction Corporation 715 Mulberry St. 900 Mulberry St. 901 Black Hawk Road Waterloo,IA 50703 Des Moines,IA 50309 Waterloo,IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable,attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives) 1.CR 01 to provide a cost for revised PR#10 and what it now includes-dated 5.31.25 ADD$1,402.92 2.CR 02 to provide cost for work associated with PR#12-dated 5.31.25 DEDUCT$2,575.00 3. CR 02 to provide Option#1 in PR#14-dated 5.31.25 ADD$24,739.86 The original Contract Sum was $ 7,053,078.55 The net change by previously authorized Change Orders $ -2,595.75 The Contract Sum prior to this Change Order was $ 7,050,482.80 The Contract Sum will be increased by this Change Order in the amount of $ 23,567.78 The new Contract Sum including this Change Order will be $ 7,074,050.58 The Contract Time will be increased by Five(5)days. The new date of Substantial Completion will be May 20,2025 NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. INVISION Architecture,LLC Peters Construction Corporation City of Waterloo ARCHITECT(Firm name) CO TRACT R(Firm ame) OW irm name w R� SIGNATURE NATURE SIG Brett Van zee,AIA Gabe Berger, Vice President Quentin Hart, Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE 05.19.2025 5 2$ 25 7/21/2025 DATE DATE DATE AIA Document G701—2017.Copyright @ 1979,1987,2000,2001 and 2017.All rights reserved.'The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 11:56:25 ET on 05/19/2025 under Order No.3104238829 which expires on 06/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA55)