HomeMy WebLinkAboutLodge_Construction_FQS_Cont_No._1105_-_9.2.2025Docusign Envelope ID: A2154141-201C-404C-ACD2-589D3DFB784C CITY OF WATERLOO, IOWA FINAL QUANTITY SUMMARY PROJECT: F.Y. 2024 SULENTIC PARK SHELTER , CONTRACT NO. 1105 Date Prepared: AUGUST 25, 2025 AMOUNT: $ $2,213.80 Increase TO; LODGE CONSTRUCTION, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 05/08/2024. A. Description of change to be made or extra work to be done: Adjustment of original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items due to necessity. C. Settlement for cost of work to be made as follows: Compensation has already been made to the contractor through bid items. See attached summary. CITY OF WATERLOO - DocuSigned by: BY: Cat- itn, hrt y tAC8449. fdzitt 9/2/2025 Total Net Increase $2,213.80 LODGE CONSTRUCTION, INC. Date CONTRACTOR 9/2/2025 City SierkC64Ae... Date BY: PRINTED NAME: v c Se TITLE: 1 APPROVED: y Engineer Date 8/27/2025 Date Docusign Envelope ID: A2154141-201C-404C-ACD2-589D3DFB784C ITEM NO. 1 F.Y. 2024 SULENTIC PARK SHELTER, CONT 1105 SUBGRADE PREPARATION 2 3 4 5 6 7 8 9 10 11 12 1001 1002 1003 2001 3001 3002 ITEM DESCRIPTION STRIPPING, SALVAGING, AND SPREADING TOPSOIL EXCAVATION, CLASS 10 EXCAVATION, CLASS 10, BORROW SHELTER PAD, 5 INCH, PCC, CLASS C SIDEWALK, PCC, CLASS C, 4 INCH SHELTER STRUCTURE, 20' x 28', COMPLETE, STRAW WATTLE INSTALLATION STRAW WATTLE REMOVAL HYDRAULIC SEEDING CONSTRUCTION ENTRANCE INSTALLATION, MAINTENANCE AND REMOVAL MOBILIZATION SIDEWALK, PCC, CLASS C, 4 INCH EXCAVATION, CLASS 10 HYDRAULIC SEEDING TOPSOIL,OFFSITE TEMPORARY SEEDING & MULCHING MODIFIED SUBBASE UNIT SY CY CY CY SY SY LS LF LF SY LS 0 SY LS SY CY SY LS ORIGINAL QUANTITY 86.7 901 75.0 13.0 86.7 162.0 1.0 180.0 180.0 901.0 1.0 1.0 178.7 1.0 126.57 48.0 1100.0 1.0 FINAL QUANTITY 86.7 901.0 75.0 13.0 86.7 162.0 1.0 175.0 175.0 2,183.4 1.0 1,0 166.5 1.0 126.60 48.0 1,100.0 1.0 DocuSigned by: autfitA, ikLV% D0525D78AAC8449... CITY OF WATERLOO APPROVAL CONTRACTOR APPROVAL: LODGE CONSTRUCTION CONTRACTOR UNIT PRICE $ 12.00 $ 4.00 $ 20.00 $ 65.00 $ 71.00 $ 66.00 $ 61,000.00 $ 4.00 $ 2.00 $ 2.50 $ 1,500.00 $ 7,500.00 $ 79.20 $ 1,000.00 $ 2.50 $ 62.00 $ 1.45 $ 771.80 INCREASE/ DECREASE QUANTITY INCREASE/ DECREASE COST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ -5.00 $ (20.00) -5.00 1282.40 (10.00) $ 3,206.00 0.00 0.00 12.15 $ (962.28) 0.00 $ 0.03 0.08 0.00 0.00 0.00 TOTAL= 2,213.80 ORIGINAL CONTRACT AMOUNT= $ 97,169.60 CHANGE ORDER #1= $ 15,465.50 CHANGE ORDER #2 = $ 2,976.00 CHANGE ORDER #3 = $ 2,366.80 FINAL QUANTITY SUMMARY = $ 2,213.80 TOTAL CONTRACT AMOUNT = $ 120,191.70 PAYMENTS TO CONTRACTOR ESTIMATES 1-5 = $ 114,182.12 RETAINAGE = $ 6,009.58 TOTAL PAID TO CONTRACTOR = $ 120,191.70