HomeMy WebLinkAboutMatt_Construction_Cont._No._1130_CO_1_-_9.2.2025Docusign Envelope ID: A2154141-201C-404C-ACD2-589D3DFB784C AIA Change Order Document G701° - 2017 PROJECT: (Name and address) South Hills Golf Course Maintenance Building 1830 East Shaulis Road Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 1101 Campbell Ave. Waterloo, IA 50701 CONTRACT INFORMATION: Contract For: Date: May 5, 2025 ARCHITECT: (Name and address) CMBA Architects 3228 Cedar Heights Drive Cedar Falls, IA 50613 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: August 15, 2025 CONTRACTOR: (Name and address) Matt Construction, Inc. 203 Y Ave. Sumner, IA 50674 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Past Change Orders: Current Change Order: 001 the following changes were made to the contingency. COR 001: Trash Bucket for trench drain catch basin COR 002: Utilize existing water meter pit COR 004: Change 1" PEX to 1" copper service line DEDUCT DEDUCT DEDUCT TOTAL CONTINGENCY DEDUCT TOTAL CONTRACT ADD The Original Contingency Sum was The Contigency Sum prior to this change order The Contigency Sum will be decreased by this Change Order in the amount of The New Contigency Sum including this Change Order will be The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be ($279.64) ($3,647.33) ($8,649.55) ($10,000.00) ($2,576.52) $10,000.00 $0.00 ($10,000.00) $0.00 $ 230,958.00 $ 0.00 $ 230,958.00 $ 2,576.52 $ 233,534.52 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. CMBA Architects ARCHITECT (Firm name) Matt Construction, Inc. City of Waterloo CONTRACTOR (Firm name) PPWINV 'name) 7��t D0525D78AAC8449... AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 16:34:29 ET on 08/18/2025 under Order No.3104240090 which expires on 10/01/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA4B) Docusign Envelope ID: A2154141-201C-404C-ACD2-589D3DFB784C SIGNATURE Dan Levi, SIGNATURE Megan Matt -Callahan, Principal Architect Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE 8/19/2025 DATE 8/19/2025 DATE SIGNATURE Quentin Hart, City of Waterloo Mayor PRINTED NAME AND TITLE DATE AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 16:34:29 ET on 08/18/2025 under Order No.3104240090 which expires on 10/01/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA4B)