Loading...
HomeMy WebLinkAboutITG_Communications_CO_27,_Cont._1088_-_10.6.2025Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Change Order Request Change •rter ype Retainage CITY OF �J�TERLOO E COMMUNICATIONS and Release Set Forth In The Community e�D sign/Engineering of Opportunity Will Be Subject To The Withhoklings t ntract Sections 6.2(f)(i) an No Change Order Name: CR-2025-0027 • rder Cos • $120,066.36 ITG equest Date: 9/23/2025 Construction Contractor Name (Attn) Michael Regan PM Broadband Implementation Requested By: Client/Owner Magellan Project Manager: Client/Owner (Attn) City of Waterloo/Waterloo Fiber/Eric Lage st Sign -Off Clayton Johnston VP of Construction ange Re.- - Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 034. Reason for Change Newly constructed homes in the Paradise Estates subdivision need to be amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Waterloo associated with Contract # 1088 Material Submittals/ Specifications Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Itemized Breakdown of Work Quantity Unit Price Location Work Order # Description Amount w Underground - Buried Labor Directional Bore (1)1", (0) 2", (0) 1.25"-->[LF] 5,816 $ 11.95 $ 69,501.20 Install #12 AWG Insulated Tracer Wire-->[LF] 5,816 $ - $ - Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 6,381 $ 1.20 $ 7,657.20 Installation, Small Vault, 13" x 24" (Composite) -->[EA] 32 $ 150.00 $ 4,800.00 Installation, Vault 24" x 36"-->[EA] 2 $ 240.00 $ 480.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 39 $ 28.00 $ 1,092.00 Sawcut, Remove and Replace Concrete 6" Thick -->[SqrFt] 39 $ 32.00 $ 1,248.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 34 $ 200.00 $ 6,800.00 Splicing, Fusion, Single Fiber -->[EA] 18 $ 25.00 $ 450.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 64 $ 1.00 $ 64.00 *** CR Labor Subtotal 92,092.40 Materials Fiber Material 24 CT Micro Fiber Cable -->[FT] 582 $ 0.57 $ 331.74 48 CT Micro Fiber Cable -->[FT] 2,100 $ 0.90 $ 1,890.00 144 CT Micro Fiber Cable -->[FT] 3,699 $ 2.06 $ 7,619.94 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 5,816 $ 0.38 $ 2,210.08 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 5,816 $ 0.11 $ 639.76 Small Vault, 13" x 24" - Composite -->[EA] 32 $ 339.52 $ 10,864.64 Vault, 24" x 36"-->[EA] 2 $ 699.76 $ 1,399.52 Closure Material FOSC 450 B Closure -->[EA] 2 $ 282.02 $ 564.04 Splice Tray for B-Gel Closure (SM12)-->[EA] 2 $ 17.31 $ 34.62 Slack Basket for B-Gel Closure -->[EA] 2 $ 40.73 $ 81.46 Commscope CSC100 Micro Closure -->[EA] 17 $ 65.23 $ 1,108.91 Commscope CSC150 Micro Closure -->[EA] 15 $ 81.95 $ 1,229.25 *** TOTAL CR COST '73.96 120,066.36 Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: Ki /YL4rli Date: 9/24/ 7Contractor Manager (not needed for design change requests) Print Name / Title: Charles Smith Regional Managed Signature: ����;� -� C-Th31424 Date: 9/25/2025 Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor r—DocuSigned by: D0525D78AAC8449... 10/6/2025