Loading...
HomeMy WebLinkAboutITG_Communications_CO_29,_Cont._No._1088_-_10.6.2025Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Change Order Request Change r er a Retainage CITY OF k4 4 TERLOO E COMMUNICATIONS Community o,Opportunity esign/Engineering No Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0029 Change Order Cost: i $83,074.31 Construction Contractor Name (At ITG Request Date: 9/23/2025 Magellan Project Manager: Michael Regan Requested By: Client/Owner PM Broadband Implementation Client/Owner (Attu) City of Waterloo/Waterloo Entrust Sign -Off Clayton Johnston Fiber/Eric Lage VP of Construction hange Requ Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 140. Reason for Change Newly constructed homes in the Prairie Meadows Estates subdivision need to be amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Material Submittals/ Specifications Waterloo associated with Contract # 1088 Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Itemized Breakdown of Work Quantity Unit Price Amount Location Work Order # Description w Underground - Buried Labor Directional Bore (1) 1", (0) 2", (0)1.25"-->[LF] 2,244 $ 11.95 $ 26,815.80 Install #12 AWG Insulated Tracer Wire-->[LF] 2,244 $ - $ - Rod Existing Conduit and Install Pull Tape-->[LF] 1,265 $ 1.65 $ 2,087.25 Remove existing cable - i.e. coax/twisted pair in street light conduits to replace with fiber-->[LF] 3,072 $ 1.35 $ 4,147.20 Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 6,613 $ 1.20 $ 7,935.60 _ Installation, Small Vault, 13" x 24" (Composite) -->[EA] 24 $ 150.00 $ 3,600.00 Installation, Vault 24" x 36"-->[EA] 2 $ 240.00 $ 480.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 15 $ 28.00 $ 420.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 15 $ 32.00 $ 480.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 24 $ 200.00 $ 4,800.00 Splicing, Fusion, Single Fiber -->[EA] 10 $ 25.00 $ 250.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 53 $ 1.00 $ 53.00 *** CR Labor Subtotal $ 51,068.85 Materials Fiber Material 24 CT Micro Fiber Cable -->[FT] 448 $ 0.57 $ 255.36 288 CT Micro Fiber Cable -->[FT] 6,165 $ 2.15 $ 13,254.75 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 2,244 $ 0.38 $ 852.72 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 2,244 $ 0.11 $ 246.84 Small Vault, 13" x 24" - Composite -->[EA] 24 $ 339.52 $ 8,148.48 Vault, 24" x 36"-->[EA] 2 $ 699.76 $ 1,399.52 Closure Material FOSC 450 B Closure -->[EA] 2 $ 282.02 $ 564.04 Splice Tray for B-Gel Closure (SM12)-->[EA] 2 $ 17.31 $ 34.62 Slack Basket for B-Gel Closure -->[EA] 2 $ 40.73 $ 81.46 Commscope CSC100 Micro Closure -->[EA] 2 $ 65.23 $ 130.46 Commscope CSC150 Micro Closure -->[EA] 19 $ 81.95 $ 1,557.05 Patch Panels and Cabinets Material 288F Pad mounted FDH Splitter Cabinet -->[EA] 1 $ 5,480.16 $ 5,480.16 CR Materials Sub 32,005.46 +++ TOTAL CR COST $ Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: /1i Z Date: 9/24/ Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Print Name / Title: Signature: Date: **End** Charles Smith eial 3ln 9/25/2025 Regional Manager[] Quentin Hart, Mayor DocuSigned by: r i lv�, RaVt� UU51511 /sAAU344y... 10/6/2025