Docusign Envelope ID: 377E1 D49-EFF1-47E3-BBBC-21846B7574E4 IA Document G701® - 2017 Change Order PROJECT: (Name and address) 2025-0090 South Hills Golf Course Maintenance Building Waterloo, IA OWNER: (Name and address) City of Waterloo 1101 Campbell Ave. Waterloo, IA 50701 CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Contract For: General Construction Change Order Number: 002 Date: 05-05-2025 Date: 09-17-2025 ARCHITECT: (Name and address) CMIBA Architects 3228 Cedar Heights Drive Cedar Falls, IA 50613 CONTRACTOR: (Name and address) Matt Construction, Inc. 203 Y Ave. Sumner, IA 50674 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference spec fc exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Past Change Order: 001 DEDUCT TO CONTINGENCY (S10,000.00) Cunent Change Order 002: COR 005: Add Cold Water Manifold and Associated Lines COR 006: Remove Vapor Barrier COR 007: Re-route Drainage Tile around building The Original Contingency Sum was The Contigency Suin prior to this change order The Contigency Sum will be decreased by this Change Order in the amount of The New Contigency Sum including this Change Order will be ADD DEDUCT ADD Total S1,166.06 (S700.67) S3,465.20 S3,930.59 S 10.000.00 S0.00 50.00 50.00 S The Original Contract Sum was 230,958.00 The net change by previously authorized Change Orders $ 2,576.52 The Contract Sum prior to this Change Order was $ 233,534.52 The Contract Sum will be increased by this Change Order in the amount of S 3,930.59 The new Contract Sum including this Change Order will be S 23 7,465.11 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. ALA Document G701 — 2017_ Copyright © 1979, 1987, 2000 , 2001 and 2017_ All rights reserved. 'The American Institute of Architects,' 'American Institute of Architects,' °AIA," the AlA Logo, and 'AIA Contract Documents` are trademarks of The American Institute of Architects. This document was produced at 12:16:13 CDT on 09117/2026 under Subscription No_20250091042 which expires on 01/16/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents' Terms of Service. To report copyright violations, e-mail docinfo@aiaconiracts.com. User Notes: (68c9abfld2416e10221ff72e) Docusign Envelope ID: 377E1D49-EFF1-47E3-BBBC-21846B7574E4 NOT VALID UNTIL SIGNED g)fi THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Signature) BY: Dan Levi, Principal Architect (Printed name, title and license number if required) 9.17.25 Date - (du.. C NTRACTOR (Signature) BY: Megan Matt -Callahan, Project Manager (Printed name and title) 9/17/25 Date DocuSigned by: l ,tt AJiIA, iktlYt a ure) BY: Quentin Hart, City of Waterloo Mayor (Printed name and title) 10/6/2025 Date A!A Document G701 — 2017. Copyright 01979, 1987, 2000 , 2001 and 2017_ All rights reserved. The American Institute of Architects," °American Institute of Architects,' 'MA," the AIA Logo, and 'AIA Contract Documents' are trademarks of The American Institute of Architects. This document was produced at 12:16:13 CDT on 09/17/2025 under Subscription No.20260091042 which expires on 01/16/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (68c9abf7d2416e10221ff72e)