HomeMy WebLinkAboutPeterson_Contractors_CO__1,_Cont._No._1133_-_10.6.2025Docusign Envelope ID: 377E1D49-EFF1-47E3-BBBC-21846B7574E4 CHANGE ORDER NO. 1 Owner City of Waterloo Date: 9/5/2025 Project FY 2026 Airport Fence Relocation Owner's Contract No. 1133 Contractor: Peterson Contractors Inc. Date of Contact Start 6/26/2025 Contract Amount: $ 317,080.00 You are directed to make the following changes in the Contract Documents. Description: 10 EMBANKMENT -IN -PLACE (ON -SITE) 11 PAVEMENT REMOVAL, ASPHALT $ 10.00 /CY x 585 CY $ 5,850.00 $ 4.25 /SY x 3515 SY $ 14,938.75 TOTAL ADDITIONS $ 20,788.75 Reason for Change Order 10 Due to the additional pavement thickness removal, more embankment material was needed for backfill. 11 Once pavement removal began within the runway safety area, the existing pavement was found to be thicker than the 6 inch depth shown in the planset. This additional square yardage of removal accounts for the end area average 1 foot depth of thickness in this area. CONTRACT PRICE Original: $ 317,080.00 Original Working Days Previous C.O.s (ADD/DEDUCT) $ This C.O. (ADD/DEDUCT) $ 20,788.75 Revised Working Days: Contract Price with all approved Change Orders: $ 337,868.75 CONTRACT TIME To Substantial To Final Completion Completion 9/30/20251 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. DocuSigned by: APP OVED: BY: 61ALIAlitA, ikaV% Ownerr(uutnionzeA Signature) Digitally signed by Chris D. Fleshner ACCEPTED: DN: C=US, F=cfleshner@pcius.com, 0="Peterson Chris D . Fleshner Contractors, Inc. ", CN=Chris D. Fleshner Reason: I am approving this document BY: Date: 2025.09.05 11:04:06-05'00' Contractor (Authorized Signature) ACCEPTED: BY: 10/6/2025 Date 09-05-2025 Date 09-05-2025 AECOM Date AECOM 60764963 I 1 Project No. C.O. No.