HomeMy WebLinkAboutKWS, INC., Change Order #2-06.06.2016 ' CITY OF WATERLOO Ja .k,C1;-/H1(1 Council Communication Motion approving Change Order No. 2 for a net decrease of$5,956.00 for the F.Y. 2011 Downtown Wayfinding Signage Project, Contract No. 783 and authorize the Mayor and City Clerk to execute said document. City Council Meeting: 6/6/2016 Prepared: 6/1/2016 REVIEWERS: Department Reviewer Action Date Engineering Thorson,Eric Approved 6/1/2016- 11:09 AM ATTACHMENTS: Description Type Cont 783 final CO Cover Memo Motion approving Change Order No. 2 for a net decrease of$5,956.00 SUBJECT: for the F.Y. 2011 Downtown Wayfinding Signage Project, Contract No. 783 and authorize the Mayor and City Clerk to execute said document. Submitted by: Submitted By: Jeff Bales,Associate Engineer This is the accumulated amount of adjustments from original to final Summary Statement: quantities that were determined necessary during the construction of the project,which results in a decrease to the total project cost. Source of Funds: Federal STP Funds(80%),City Match(G.O. Bond Funds)(20%) CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 2 PROJECT: F.Y. 2011 INSTALLATION OF WAYFINDING SIGNAGE WITHIN DOWNTOWN WATERLOO, IOWA CONTRACT NO. 783 Date Prepared: April 21, 2016 AMOUNT: ($ 5,956.00) CR TO: KWS, Inc. of Cedar Falls, Iowa Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated March 14, 2011. A. Description of change to be made or extra work to be done: Item 1—SIDEWALK, P.C. CONCRETE,5-INCH—Decrease Quantity by 17.3 SY Item 3—FLAGGERS—Decrease Quantity by 5.0 DAY Item 8—D.O.T. GUIDE SIGN, 60" x 42"—Decrease Quantity by 1.0 EA Item 12—SIDEWALK, BRICK PAVING—Decrease Quantity by 2.44 SY Item 13—SODDING—Decrease Quantity by 2.6 SQ Item Summary: ITEM UNIT TOTAL ITEM DESCRIPTION UNIT QUANTITY NO. COST AMOUNT 1 SIDEWALK, P.C. CONCRETE, 5-INCH SY 17.3 $150.00 ($2,595.00) CR 3 FLAGGERS DAY 5.0 $295.00 ($1,475.00) CR 8 D.O.T GUIDE SIGN, 60" x 42" EA 1.0 $1,000.00 ($1,000.00) CR 12 SIDEWALK, BRICK PAVING SY 2.44 $150.00 ($366.00) CR 13 SODDING SQ 2.6 $200.00 ($520.00) CR NET INCREASE ($5,956.00) CR B. Reason for ordering change or extra work: Adjust quantities for all items listed above to the final as-built quantities. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid unit prices. Project Summary: Original Contract Amount $103,985.00 Change Order# 1 $2,110.90 Change Order# 2 (Balancing) ($5,956.00) CR Final Contract Amount $100,139.90 CITY OF WATERLOO BY: `may( (o-6- KWS, Inc. Mayor Date CONTRACTOR BY: ,Ztiw `/ -VV%, Date ATTEST: PRINTED NAME: 146k.r..D,4 TITLE: P- City Clerk Date APPROVED: ( 3.eiit______„9-1-1,0 AA> 5/3//e0 City Engineer Date