HomeMy WebLinkAboutITG_-_Cont._No._1088,_CO__24_-_10.20.2025Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 CITY OF Change Order Request �JJ' TERLOO E COMMUNICATIONS Community u/Opportunity Change r er a eID sin/Engineering - Retainage No Will Be Subject To The Withholdings ' . ntract Sections 6.2(f)(i) and " and Release Set Forth In The Change Order Name: CR-2025-0024 .• rder Cost $1,028,028.66 Construction Contractor Name (Attn) ITG equest Date: 9/23/2025 Michael Regan Magellan Project Manager: PM Broadband Implementation Requested By: Client/Owner Client/Owner (Attn) City of Waterloo st Sign -Off Clayton Johnston VP of Construction Mtge Re Description of Change (include locaho The following Change Order has been created to account for construction labor and materials for the (62) net new sites added to the Backbone infrastructure. Reason for Change The City of Waterloo has a need to add (62) new sites, which includes a combination of Stormwater (3), Traffic (34), Water (9) and City facilities (16), to the backbone infrastructure; these sites were not part of the original design. This change order is associated with Addendum No., Contract 1088 for the re -engineering of the design, re -working the splicing schematics, upldating the Bill of Materials and any applicable permit work for these sites. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Waterloo associated with Contract # 1088 Material Submittals/ Specifications Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Itemized Breakdown of Work Quantity Unit Price Location Work Order # Description Amount w Underground - Buried Labor Directional Bore (0)1", (0) 2", (1) 1.25'-->[LF] 64,124 $ 11.95 $ 766,281.80 Install #12 AWG Insulated Tracer Wire-->[LF] 64,124 $ - $ - Installation, Underground Fiber Cable - Including Slack (Regular Loose Tube Fiber)-->[LF] 91,778 $ 1.20 $ 110,133.60 Installation, Vault 24" x 36"-->[EA] 25 $ 240.00 $ 6,000.00 Sawcut, Remove and Replace Asphalt 6" Thick -->[SqrFt] 640 $ 28.00 $ 17,920.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 640 $ 32.00 $ 20,480.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 10 $ 200.00 $ 2,000.00 Splicing, Fusion, Single Fiber -->[EA] 372 $ 25.00 $ 9,300.00 Testing, OTDR, Bi-Directional, Power Meter Testing -->[EA] 124 $ 1.25 $ 155.00 CR Labor Subtotal $ 932,270.40 Fiber Material 12 CT Fiber Cable -->[FT] 5,066 $ 0.33 $ 1,671.78 24 CT Fiber Cable -->[FT] 83,793 $ 0.40 $ 33,517.20 48 CT Fiber Cable -->[FT] 2,919 $ 0.48 $ 1,401.12 Underground Material 1.25" HDPE Roll Conduit, Orange - SDR 11-->[FT] 64,124 $ 0.48 $ 30,779.52 2" HDPE Roll Conduit, Orange - SDR 11-->[FT] 0 $ 1.00 $ - #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 64,124 $ 0.11 $ 7,053.64 Vault, 24" x 36"-->[EA] 25 $ 699.76 $ 17,494.00 Closures Material FOSC 450 D Closure -->[EA] 10 $ 336.06 $ 3,360.60 D Size splice Tray -->[EA] 10 $ 25.91 $ 259.10 Slack Basket for D-Gel Closure -->[EA] 10 $ 22.13 $ 221.30 *** CR Materials Subtotal I $ 95,758.26 TOTAL CR COST 1,028,028. Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: eiezert, Date: 9/24/25 Contractor Manager (not needed for design change requests) Print Name / Title: Charles Smith Regional Managed Signature: CACe Date: 9/25/2025 Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor DocuSigned by: 61,tuAlaA, tkart D0525D78AAC8449... 10/20/2025