CR-2025-0025
• rder Cos •
$18,149.60
ITG
equest Date:
9/23/2025
Construction Contractor Name (Attn)
Michael Regan
PM Broadband Implementation
Requested By:
Client/Owner
Magellan Project Manager:
Client/Owner (Attn)
City of Waterloo
st Sign -Off Clayton Johnston
VP of Construction
IlMnge
Re
Description of Change (include location)
The following Change Order has been created to account for construction labor and materials associated with
the new City Hall building relocation.
Reason for Change
The City of Waterloo City Hall building is re -locating to 100 E 4th St, original design has the building at 715
Mulberry St. This change order is associated with Addendum No. 5, Contract 1088 for the re -engineering of
the design, re -working the splicing schematic and upldating the Bill of Materials.
Labor from
original BoM pricing approved by Waterloo Fiber and the City of
Material Submittals/ Specifications
& material pricing came the
Waterloo associated with Contract # 1088
Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40
Itemized Breakdown of Work
Quantity Unit Price
Location
Work Order #
Description
Amount
w
Underground - Buried Labor
Directional Bore (0)1", (1) 2", (0) 1.25'-->[LF]
549
$ 11.95
$ 6,560.55
Install #12 AWG Insulated Tracer Wire-->[LF]
549
$ -
$ -
Installation, Underground Fiber Cable - Including Slack (Regular Loose
Tube Fiber)-->[LF]
1,844
$ 1.20
$ 2,212.80
Installation, Vault 24" x 36"-->[EA]
1
$ 240.00
$ 240.00
Sawcut, Remove and Replace Asphalt 6" Thick -->[SqrFt]
8
$ 28.00
$ 224.00
Sawcut, Remove and Replace Concrete 6" Thick -->[SqrFt]
8
$ 32.00
$ 256.00
Splicing Labor
Install New Splice Case & Prep Cable -->[EA]
1
$ 200.00
$ 200.00
Splicing, Fusion, Single Fiber -->[EA]
123
$ 25.00
$ 3,075.00
CR Labor Subtotal
$ 12,768.35
Material:
Fiber Material
288 CT Fiber Cable -->[FT]
1,844
$ 2.00
$ 3,688.00
Underground Material
2" HDPE Roll Conduit, Orange — SDR 11-->[FT]
549
$ 1.00
$ 549.00
#12 AWG Solid Thhn Insulated Tracer Wire -->[FT]
549
$ 0.11
$ 60.39
Vault, 24" x 36"-->[EA]
1
$ 699.76
$ 699.76
Closure Material
FOSC 450 D Closure -->[EA]
1
$ 336.06
$ 336.06
D Size splice Tray -->[EA]
1
$ 25.91
$ 25.91
Slack Basket for D-Gel Closure -->[EA]
1
$ 22.13
$ 22.13
I
CR Materials
Subtotal
$ = 5,381.25
18,149.60
TOTAL CR COST
Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40
Magellan Sign -Off
Print Name / Title: Clayton Johnston VP of Construction
Signature: a �iZGJ iV Afrf.4211/
Date: 9/24/25
Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Print Name / Title:
Signature:
Date:
**End**
Charles Smith
e ed-
9/25/2025
Regional Managed
Quentin Hart, Mayor
DocuSigned by:
Lftt
o525D78AAC8449...
10/20/2025