Loading...
HomeMy WebLinkAboutITG_-_Cont._No._1088,_CO__25_-_10.20.2025Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Change Order Request Change r er ype Retainage CITY OF �JJI TERLOO E COMMUNICATIONS and Release Set Forth In The Community eID sin/Engineering u/Opportunity Will Be Subject To The Withhoklings t ntract Sections 6.20)6) an No Change Order Name: CR-2025-0025 • rder Cos • $18,149.60 ITG equest Date: 9/23/2025 Construction Contractor Name (Attn) Michael Regan PM Broadband Implementation Requested By: Client/Owner Magellan Project Manager: Client/Owner (Attn) City of Waterloo st Sign -Off Clayton Johnston VP of Construction IlMnge Re Description of Change (include location) The following Change Order has been created to account for construction labor and materials associated with the new City Hall building relocation. Reason for Change The City of Waterloo City Hall building is re -locating to 100 E 4th St, original design has the building at 715 Mulberry St. This change order is associated with Addendum No. 5, Contract 1088 for the re -engineering of the design, re -working the splicing schematic and upldating the Bill of Materials. Labor from original BoM pricing approved by Waterloo Fiber and the City of Material Submittals/ Specifications & material pricing came the Waterloo associated with Contract # 1088 Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Itemized Breakdown of Work Quantity Unit Price Location Work Order # Description Amount w Underground - Buried Labor Directional Bore (0)1", (1) 2", (0) 1.25'-->[LF] 549 $ 11.95 $ 6,560.55 Install #12 AWG Insulated Tracer Wire-->[LF] 549 $ - $ - Installation, Underground Fiber Cable - Including Slack (Regular Loose Tube Fiber)-->[LF] 1,844 $ 1.20 $ 2,212.80 Installation, Vault 24" x 36"-->[EA] 1 $ 240.00 $ 240.00 Sawcut, Remove and Replace Asphalt 6" Thick -->[SqrFt] 8 $ 28.00 $ 224.00 Sawcut, Remove and Replace Concrete 6" Thick -->[SqrFt] 8 $ 32.00 $ 256.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 1 $ 200.00 $ 200.00 Splicing, Fusion, Single Fiber -->[EA] 123 $ 25.00 $ 3,075.00 CR Labor Subtotal $ 12,768.35 Material: Fiber Material 288 CT Fiber Cable -->[FT] 1,844 $ 2.00 $ 3,688.00 Underground Material 2" HDPE Roll Conduit, Orange — SDR 11-->[FT] 549 $ 1.00 $ 549.00 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 549 $ 0.11 $ 60.39 Vault, 24" x 36"-->[EA] 1 $ 699.76 $ 699.76 Closure Material FOSC 450 D Closure -->[EA] 1 $ 336.06 $ 336.06 D Size splice Tray -->[EA] 1 $ 25.91 $ 25.91 Slack Basket for D-Gel Closure -->[EA] 1 $ 22.13 $ 22.13 I CR Materials Subtotal $ = 5,381.25 18,149.60 TOTAL CR COST Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: a �iZGJ iV Afrf.4211/ Date: 9/24/25 Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Print Name / Title: Signature: Date: **End** Charles Smith e ed- 9/25/2025 Regional Managed Quentin Hart, Mayor DocuSigned by: Lftt o525D78AAC8449... 10/20/2025