Loading...
HomeMy WebLinkAboutITG_-_Cont._No._1088,_CO__30_-_10.20.2025Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 CITY OF Change Order Request k4JITERLOO E COMMUNICATIONS Change Order Type Retainage Community o,Opportunity esign/Engineering No Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0030 Change Order Cost: $648,926.06 Construction Contractor Name (At ITG Request Date: 10/16/2025 Magellan Project Manager: Michael Regan Requested By: Client/Owner PM Broadband Implementation Client/Owner (Attu) City of Waterloo Entrust Sign -Off Clayton Johnston VP of Construction 111111.1 Change Reque r Description of Change (include location) The following Change Order has been created to account for construction labor and materials for drops associated with the Backbone lateral sites (Qty. 263) Reason for Change City of Waterloo submitted request to bring fiber from the vault to the demarcation point for 263 sites associated with the backbone infrastructure. Labor & material pricing has been provided by ITG to be added to the original BoM approved by Waterloo Material Submittals/ Specifications Fiber and the City of Waterloo associated with Contract # 1088 Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Lo W rk Or Work Order # Itemized Breakdown of Work Description Quantity Unit Price I Amount Unit # LI_148 Install rack mounted patch panel (Any Size) and tails -->[EA] 16 $ 115.00 $ 1,840.00 LI_149 Install Wall Mount Fiber enclosure (w/SCH 80 conduit) 229 $ 750.00 $ 171,750.00 LI_150 Insta11 7ft Rack for patch panels -->[EA] 2 $ 400.00 $ 800.00 LI_151 Survey Backbone Facility 263 $ 200.00 $ 52,600.00 LI_152 Install Pad mounted Traffic Cabinet 12 $ 1,200.00 $ 14,400.00 LI_153 Concete Footing for Traffic Cabinet 12 $ 4,720.00 $ 56,640.00 LI_155 Attach conduit to existing Traffic Control enclosure 43 $ 275.00 $ 11,825.00 LI_161 Pull fiber through building -->[FT] 1,500 $ 2.15 $ 3,225.00 LI_164 Insta11 1.25" SCH 80 Building Riser with LB -up to 10' 12 $ 112.00 $ 1,344.00 LI_165 Insta11 24 x 24 x 10 NEMA 3R enclosure (w/rigid conduit) 155 $ 55.00 $ 8,525.00 *** . CRLaborSubtotal $ 322,949.0• s Unit # LI_279 12 Port Rack Mount Panel 12 $ 226.29 $ 2,715.48 LI_284 288 port rack mount panel -->[EA] 4 $ 4,787.21 $ 19,148.84 LI_286 7ft Rack for patch panels -->[EA] 2 $ 929.34 $ 1,858.68 LI_288 1.25" Sch 80 Riser with LB (up to 10") 11 $ 92.52 $ 1,017.72 LI_290 Traffic Cabinet 12 $ 2,236.30 $ 26,835.60 LI_291 Fiber case w/1.25" SCH 80 Riser (12 ct cassette) 63 $ 328.19 $ 20,675.97 LI_292 24 x 24 x10 Aluminum Enclsure w/wall mount option (fiber case & 12 ct Cassette) 133 $ 1,629.19 $ 216,682.27 LI_293 24 x 24 x10 Aluminum Enclsure w/pole mount option (fiber case & 12 ct Cassette) 22 $ 1,683.75 $ 37,042.50 . , TOTAL CR COST CR Materials _-� Subtotal $ 648,926.06 Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40 Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: CiaerP �eiUia e) Date: 10/16/2025 7Contractor Manager (not needed for design change requests) Print Name / Title: Charles Smith Regional Manager0 Signature: eia4144.. (5'hua Date: 10/16/2025 Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor DocuSigned by: Cat-tAlitn, Rat D0525D78AAC8449... 10/20/2025