HomeMy WebLinkAboutITG_-_Cont._No._1088,_CO__30_-_10.20.2025Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40
CITY OF
Change Order Request k4JITERLOO E COMMUNICATIONS
Change Order Type
Retainage
Community o,Opportunity
esign/Engineering
No Will Be Subject To The Withholdings and Release Set Forth In The
Contract Sections 6.2(f)(i) and (ii)
Change Order Name:
CR-2025-0030 Change Order Cost: $648,926.06
Construction Contractor Name (At
ITG Request Date: 10/16/2025
Magellan Project Manager:
Michael Regan Requested By: Client/Owner
PM Broadband Implementation
Client/Owner (Attu)
City of Waterloo Entrust Sign -Off
Clayton Johnston
VP of Construction
111111.1
Change Reque
r
Description of Change (include location) The following Change Order has been created to account for construction labor and materials for drops
associated with the Backbone lateral sites (Qty. 263)
Reason for Change City of Waterloo submitted request to bring fiber from the vault to the demarcation point for 263 sites
associated with the backbone infrastructure.
Labor & material pricing has been provided by ITG to be added to the original BoM approved by Waterloo
Material Submittals/ Specifications
Fiber and the City of Waterloo associated with Contract # 1088
Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40
Lo
W rk Or
Work Order #
Itemized Breakdown of Work
Description Quantity Unit Price
I
Amount
Unit #
LI_148
Install rack mounted patch panel (Any Size) and tails -->[EA]
16
$ 115.00
$ 1,840.00
LI_149
Install Wall Mount Fiber enclosure (w/SCH 80 conduit)
229
$ 750.00
$ 171,750.00
LI_150
Insta11 7ft Rack for patch panels -->[EA]
2
$ 400.00
$ 800.00
LI_151
Survey Backbone Facility
263
$ 200.00
$ 52,600.00
LI_152
Install Pad mounted Traffic Cabinet
12
$ 1,200.00
$ 14,400.00
LI_153
Concete Footing for Traffic Cabinet
12
$ 4,720.00
$ 56,640.00
LI_155
Attach conduit to existing Traffic Control enclosure
43
$ 275.00
$ 11,825.00
LI_161
Pull fiber through building -->[FT]
1,500
$ 2.15
$ 3,225.00
LI_164
Insta11 1.25" SCH 80 Building Riser with LB -up to 10'
12
$ 112.00
$ 1,344.00
LI_165
Insta11 24 x 24 x 10 NEMA 3R enclosure (w/rigid conduit)
155
$ 55.00
$ 8,525.00
***
.
CRLaborSubtotal
$ 322,949.0•
s
Unit #
LI_279
12 Port Rack Mount Panel
12
$ 226.29
$ 2,715.48
LI_284
288 port rack mount panel -->[EA]
4
$ 4,787.21
$ 19,148.84
LI_286
7ft Rack for patch panels -->[EA]
2
$ 929.34
$ 1,858.68
LI_288
1.25" Sch 80 Riser with LB (up to 10")
11
$ 92.52
$ 1,017.72
LI_290
Traffic Cabinet
12
$ 2,236.30
$ 26,835.60
LI_291
Fiber case w/1.25" SCH 80 Riser (12 ct cassette)
63
$ 328.19
$ 20,675.97
LI_292
24 x 24 x10 Aluminum Enclsure w/wall mount option (fiber case & 12 ct
Cassette)
133
$ 1,629.19
$ 216,682.27
LI_293
24 x 24 x10 Aluminum Enclsure w/pole mount option (fiber case & 12 ct
Cassette)
22
$ 1,683.75
$ 37,042.50
. ,
TOTAL CR COST
CR Materials
_-�
Subtotal
$
648,926.06
Docusign Envelope ID: 9CCE78DA-7F59-4322-BCA8-0C8C8C479D40
Magellan Sign -Off
Print Name / Title: Clayton Johnston VP of Construction
Signature: CiaerP �eiUia e)
Date: 10/16/2025
7Contractor Manager (not needed for design change requests)
Print Name / Title: Charles Smith Regional Manager0
Signature: eia4144.. (5'hua
Date: 10/16/2025
Client/Owner (Attn)
Print Name / Title:
Signature:
Date:
**End**
Quentin Hart, Mayor
DocuSigned by:
Cat-tAlitn, Rat
D0525D78AAC8449...
10/20/2025