Loading...
HomeMy WebLinkAboutEn_Communications,_Cont._No._1088,_Addendum_No_9_-_11.3.2025Docusign Envelope ID: DE331357-071F-41FD-BF66-D242EA5D95BC ADDENDUM NO. 9 TO THE EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2025 CITY OF WATERLOO, IOWA DATE: OCTOBER 22, 2025 The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2025: o Due to long lead times with USACE permits for one (1) underground levee crossing in Task Order 09, the City requested to change the design and avoid the levee crossing along East Mitchell Avenue and re-route fiber south on Sheffield Avenue and east on Easton Avenue back north onto East Mitchell Avenue. o This Addendum has been created to account for labor towards the re -engineering of the Backbone design/splicing schematics and updating the Bill of Materials (BoM) associated with the new fiber route. It does not include any construction labor or material costs associated with the update BoM. o The following labor pricing is net new costs to the project: Service Description Quantity Unit Price Amount Design Re -work Design Specialist 16 $130.00 $2,080.00 Design Engineer II 8 $140.00 $1,120.00 OSP/ISP Estimator 8 $140.00 $1,120.00 GIS Technician 10 $100.00 $1,000.00 Project Engineer 5 $185.00 $925.00 Design Coordinator 5 $145.00 $725.00 TOTAL $6,970.00 Any revisions to any of the Contract Documents made by this Addendum shall be considered as the same revision to any and all related areas of the Contract Documents not specifically called out in this Addendum. - DocuSigned by: audit& ika.r l D0525D78AAC8449... Quentin Hart Mayor of Waterloo, Iowa City of Waterloo Cole Henkle Vice President Design & Engineering EN Engineering, LLC Page 1 of 1