Loading...
HomeMy WebLinkAboutITG_Communications_-_Contract_No._1088,_CO__31_-_11.3.2025Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Change Order Request Change r er a Retainage CITY OF k4 4 TERLOO E COMMUNICATIONS Community esign/Engineering o,Opportunity Will Be Subject To The Withholdings and Release Set Forth In The No Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0031 Change Order Cost: i $44,845.42 Construction Contractor Name (At ITG Request Date: 10/8/2025 Magellan Project Manager: Michael Regan PM Broadband Implementation Requested By: Client/Owner Client/Owner (Attu) City of Waterloo/Waterloo Fiber/Eric Lage Entrust Sign -Off Clayton Johnston VP of Construction hange Requ Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 082. Reason for Change Newly constructed homes in the San Marnan Business Park First Addition (14 passings) need to be amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. original BoM pricing approved by Waterloo Fiber and the City of Labor & material pricing came from the Material Submittals/ Specifications Waterloo associated with Contract # 1088 Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Location Work Order # Itemized Breakdown of Work Description Quantity I Unit Price Amount w Underground - Buried Labor Directional Bore (1) 1", (0) 2", (0)1.25"-->[LF] 2,304 $ 11.95 $ 27,532.80 Install #12 AWG Insulated Tracer Wire-->[LF] 2,304 $ - $ - Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 2,904 $ 1.20 $ 3,484.80 Installation, Small Vault, 13" x 24" (Composite) -->[EA] 6 $ 150.00 $ 900.00 Installation, Vault 24" x 36"-->[EA] 3 $ 240.00 $ 720.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 16 $ 28.00 $ 448.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 16 $ 32.00 $ 512.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 9 $ 200.00 $ 1,800.00 Splicing, Fusion, Single Fiber -->[EA] 20 $ 25.00 $ 500.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 14 $ 1.00 $ 14.00 CR Labor Subtotal $ 35,911.60 Fiber Material 12 CT Micro Fiber Cable -->[FT] 870 $ 0.49 $ 426.30 48 CT Micro Fiber Cable -->[FT] 2,034 $ 0.90 $ 1,830.60 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 2,304 $ 0.38 $ 875.52 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 2,304 $ 0.11 $ 253.44 Small Vault, 13" x 24" - Composite -->[EA] 6 $ 339.52 $ 2,037.12 Vault, 24" x 36"-->[EA] 3 $ 699.76 $ 2,099.28 Closure Material FOSC 450 B Closure -->[EA] 3 $ 282.02 $ 846.06 Splice Tray for B-Gel Closure (SM12)-->[EA] 3 $ 17.31 $ 51.93 Slack Basket for B-Gel Closure -->[EA] 3 $ 40.73 $ 122.19 Commscope CSC100 Micro Closure -->[EA] 6 $ 65.23 $ 391.38 *** • CR Materials Subtotal $ 8,933.8 *** TOTAL CR COST ��� 44,845.42 Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: Date: 10/9/25 Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Print Name / Title: Signature: Date: **End** Charles Smith Regional Manager[] e%L'!%Lf.e c 10/9/2025 Quentin Hart, Mayor c6DuuriczuSigned by: & ltA, _AYIL 5D78RAC844 11/3/2025