Loading...
HomeMy WebLinkAboutITG_Communications_-_Contract_No._1088,_CO__33_-_11.3.2025Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Change Order Request Change r er a Retainage CITY OF k4 4 TERLOO E COMMUNICATIONS Community o,Opportunity esign/Engineering No Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0033 Change Order Cost: $42,373.57 Construction Contractor Name (At ITG Request Date: 10/8/2025 Magellan Project Manager: Michael Regan Requested By: Client/Owner PM Broadband Implementation Client/Owner (Attu) City of Waterloo/Waterloo Entrust Sign -Off Clayton Johnston Fiber/Eric Lage VP of Construction hange Requ Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 079. Reason for Change Newly constructed homes on Presley Cir (36 passings) need to be amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Material Submittals/ Specifications Waterloo associated with Contract # 1088 Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Location Work Order # Itemized Breakdown of Work Description I Quantity Unit Price Amount w Underground - Buried Labor Directional Bore (1)1", (0) 2", (0)1.25"-->[LF] 1,946 $ 11.95 $ 23,254.70 Install #12 AWG Insulated Tracer Wire-->[LF] 1,946 $ - $ - Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 2,700 $ 1.20 $ 3,240.00 Installation, Small Vault, 13" x 24" (Composite) -->[EA] 9 $ 150.00 $ 1,350.00 Installation, Vault 24" x 36"-->[EA] 3 $ 240.00 $ 720.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 13 $ 28.00 $ 364.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 13 $ 32.00 $ 416.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 11 $ 200.00 $ 2,200.00 Splicing, Fusion, Single Fiber -->[EA] 60 $ 25.00 $ 1,500.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 36 $ 1.00 $ 36.00 *** CRLaborSubtotal $ 33,080.7I Material Fiber Material 24 CT Micro Fiber Cable -->[FT] 1,554 $ 0.57 $ 885.78 48 CT Micro Fiber Cable -->[FT] 1,146 $ 0.90 $ 1,031.40 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 1,946 $ 0.38 $ 739.48 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 1,946 $ 0.11 $ 214.06 Small Vault, 13" x 24" - Composite -->[EA] 9 $ 339.52 $ 3,055.68 Vault, 24" x 36"-->[EA] 3 $ 699.76 $ 2,099.28 Closure Material FOSC 450 B Closure -->[EA] 2 $ 282.02 $ 564.04 Splice Tray for B-Gel Closure (SM12)-->[EA] 2 $ 17.31 $ 34.62 Slack Basket for B-Gel Closure -->[EA] 2 $ 40.73 $ 81.46 Commscope CSC100 Micro Closure -->[EA] 9 $ 65.23 $ 587.07 CR Materials Subtotal $ 9,292.87 *** TOTALCRCOST .--, 42,373.57 Docusign Envelope ID: DE331357-071 F-41 FD-BF66-D242EA5D95BC Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: Date: (2—Eatif. fG/ZQC,�lrL 10/9/2 Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Charles Smith 10/9/2025 Regional Manager[] Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor DocuSigned by: L_ttt'& Rot D0525D78AAC8449... 11 /3/2025