Loading...
HomeMy WebLinkAboutPeters_Construction_-_Byrnes_Pool_Cont._No._1077,_CO__3_-_11.3.2025Docusign Envelope ID: DE331357-071F-41FD-BF66-D242EA5D95BC StAIA Document G701® 2017 Change Order PROJECT: (Name and address) 22095 Byrnes Park Aquatic Center 801 Campbell Ave. Waterloo, IA 50701 OWNER: (Name and address) City of Waterloo 715 Mulberry St. Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Date: November 6, 2023 ARCHITECT: (Name and address) INVISION Architecture, LLC 900 Mulberry St. Des Moines, IA 50309 CHANGE ORDER INFORMATION: Change Order Number: 003 Date: October 20, 2025 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) 1. CR 10 Cost Associated with PR #09 - dated 9/17/2024 ADD $15,003.72 2. CR 18 Provide Air Compressor Power Credit - dated 9/23/2025 DEDUCT $137.63 3. CR 20R Water Slide Bonding - dated 9/23/2025 ADD $11,186.80 4. CR 21 Bollard Credit - dated 9/30/2025 DEDUCT $1,500.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be unchanged $ 7,053,078.55 $ 20,972.03 $ 7,074,050.58 $ 24,552.89 $ 7,098,603.47 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture, LLC ARCHITECT (Firm name) Peters Construction Corporation Citypof Waterloo CONT CTOR (F� na e) •�• .• qJ Ly. i� SIGNATURE SIGNATURE Brad Leeper Partner, Architect PRINTED NAME AND TITLE 10.21.25 DATE �rac(t �Q sl - 1�ve s,tk PRINTED NAME AND TITLE tv=4z►1'75 DATE SIGrear' Quentin Hart, Mayor PRINTED NAME AND TITLE 11/3/2025 DATE AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:42:50 ET on 10/21/2025 under Order No.3104238829 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA42) 1