HomeMy WebLinkAboutEN_Communications_Proposal,_Addendum_No_10_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
ADDENDUM NO. 10
TO THE
EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT,
CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT
SERVICES 2025
CITY OF WATERLOO, IOWA
DATE: NOVEMBER 6, 2025
The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO
IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION
INSPECTION AND ENGINEERING SUPPORT SERVICES 2025:
o Due to long lead times with USACE permits for one (1) underground levee
crossing in Task Order 13, the City has requested to go overhead versus
underground and attach to MidAmerican Energy poles along Fletcher Avenue
serving the Hope Martin Memorial Park.
o This Addendum has been created to account for labor towards the Make Ready
Engineering (MRE) services (make ready, pole loading analysis, pole applications,
PE stamps, and pole data collection) for the MidAmerican Energy pole
attachment application. It does not include any construction labor or material
costs associated with an updated BoM.
o The following labor pricing is net new costs to the project:
Service
Description
Quantity
Unit Price
Amount
Make Ready Engineering
Design Tech II
2
$130.00
$260.00
Pole Load Analysis
Design Coordinator
2
$145.00
$290.00
Pole Data Collection
Construction Manager
1.5
$175.00
$262.50
Pole Data Collection
Construction Inspector
1.5
$140.00
$210.00
Pole Data Collection
Field Manager
0.5
$200.00
$100.00
PE Stamps
PE Stamps
2
$190.00
$380.00
TOTAL
$1,502.50
Any revisions to any of the Contract Documents made by this Addendum shall be
considered as the same revision to any and all related areas of the Contract Documents not
specifically called out in this Addendum.
DocuSigned by:
C nuAJiln, iktvit
"- D0525D78AAC8449...
11/17/2025 1 - 574.n7e4
Quentin Hart
Mayor of Waterloo, Iowa
City of Waterloo
11 /6/2025
Cole Henkle
Vice President Design & Engineering
EN Engineering, LLC
Page 1 of 1