Loading...
HomeMy WebLinkAboutITG_Communications_CO__34,_Cont._No._1088_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Change Order Request Change r er a Retainage CITY OF k4 4 TERLOO E COMMUNICATIONS Community esign/Engineering o,Opportunity Will Be Subject To The Withholdings and Release Set Forth In The No Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0034 Change Order Cost: $59,616.22 Construction Contractor Name (At ITG Request Date: 10/31/2025 Magellan Project Manager: Michael Regan PM Broadband Implementation Requested By: Client/Owner Client/Owner (Attu) City of Waterloo/Waterloo Fiber/Eric Lage Entrust Sign -Off Clayton Johnston VP of Construction hange Requ Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 057 / Task Order 15. Reason for Change Newly constructed homes on Edison Addition (34 passings) need to be amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. original BoM pricing approved by Waterloo Fiber and the City of Labor & material pricing came from the Material Submittals/ Specifications Waterloo associated with Contract # 1088 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Itemized Breakdown of Work Description Quantity Unit Price Amount Location ir Work Order # w Underground - Buried Labor Directional Bore (0)1", (0) 2", (1)1.25"-->[LF] 282 $ 11.95 $ 3,369.90 Directional Bore (1)1", (0) 2", (0)1.25"-->[LF] 2,127 $ 11.95 $ 25,417.65 Install #12 AWG Insulated Tracer Wire-->[LF] 2,409 $ - $ - Installation, Underground Fiber Cable - Including Slack (Regular Loose Tube Fiber)-->[LF] 382 $ 1.20 $ 458.40 Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 3,028 $ 1.20 $ 3,633.60 Installation, Small Vault, 13" x 24" (Composite) -->[EA] 19 $ 150.00 $ 2,850.00 Installation, Vault 24" x 36"-->[EA] 1 $ 240.00 $ 240.00 Installation, Extra Large Vault 33" x 60"-->[EA] 1 $ 540.00 $ 540.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 16 $ 28.00 $ 448.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 16 $ 32.00 $ 512.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 18 $ 200.00 $ 3,600.00 Splicing, Fusion, Single Fiber -->[EA] 42 $ 25.00 $ 1,050.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 34 $ 1.00 $ 34.00 Patch Panels and Cabinets Labor Install Pad mounted FDH Splitter Cabinet + Site prep and Prefab Vault -- >[EA] 1 $ 3,700.00 $ 3,700.00 CR Labor Subtotal $ 45,853.55 Fiber Material 12 CT Fiber Cable -->[FT] 382 $ 0.33 $ 126.06 12 CT Micro Fiber Cable -->[FT] 2,100 $ 0.49 $ 1,029.00 24 CT Micro Fiber Cable -->[FT] 928 $ 0.57 $ 528.96 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 2,127 $ 0.38 $ 808.26 1.25" HDPE Roll Conduit, Orange - SDR 11-->[FT] 282 $ 0.48 $ 135.36 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 2,409 $ 0.11 $ 264.99 Small Vault, 13" x 24" - Composite -->[EA] 19 $ 339.52 $ 6,450.88 Vault, 24" x 36"-->[EA] 1 $ 699.76 $ 699.76 Extra Large Vault 33" x 60" (Split Lid) -->[EA] 1 $ 2,270.43 $ 2,270.43 Closure Material FOSC 450 B Closure -->[EA] 1 $ 282.02 $ 282.02 Splice Tray for B-Gel Closure (SM12)-->[EA] 1 $ 17.31 $ 17.31 Slack Basket for B-Gel Closure -->[EA] 1 $ 40.73 $ 40.73 Commscope CSC100 Micro Closure -->[EA] 17 $ 65.23 $ 1,108.91 *** . CR Materials Subtotal IlUa TOTAL CR COST 59,616.22 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: Date: 11 /"11, 29/.44/1•P Contractor Manager (not needed for design change requests) Print Name / Title: Charles Smith Regional Manager0 Signature: e%LG ht Z Date: 11 /5/2025 Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor ,-DocuSigned by: Bf1Y25D7 11 /17/2025