Loading...
HomeMy WebLinkAboutITG_Communications_CO__35,_Cont._No._1088_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Change Order Request Change r er a Retainage CITY OF k4 4 TERLOO E COMMUNICATIONS Community o,Opportunity esign/Engineering No Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) Change Order Name: CR-2025-0035 Change Order Cost: $86,412.80 Construction Contractor Name (At ITG Request Date: 10/31/2025 Magellan Project Manager: Michael Regan Requested By: Client/Owner PM Broadband Implementation Client/Owner (Attu) City of Waterloo/Waterloo Entrust Sign -Off Clayton Johnston Fiber/Eric Lage VP of Construction hange Requ Description of Change (include location) The following Change Order has been created to account for construction labor and materials for an updated design plan in LCP 077 / Task Order 14. Newly constructed homes on Waterloo Air & Rail Park - Hyper Drive & Warp Dr (13 passings) need to be Reason for Change amended into the original engineering and designs. Waterloo Fiber submitted request to add to the FTTP plan. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Material Submittals/ Specifications Waterloo associated with Contract # 1088 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Itemized Breakdown of Work Description I Quantity Unit Price Amount Location Work Order # w Underground - Buried Labor Directional Bore (1)1", (0) 2", (0)1.25"-->[LF] 2,614 $ 11.95 $ 31,237.30 Install #12 AWG Insulated Tracer Wire-->[LF] 2,614 $ - $ - Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->[LF] 14,719 $ 1.20 $ 17,662.50 Installation, Small Vault, 13" x 24" (Composite) -->[EA] 5 $ 150.00 $ 750.00 Installation, Vault 24" x 36"-->[EA] 3 $ 240.00 $ 720.00 Sawcut, Remove and Replace Asphalt 6" Thick-->[SgrFt] 18 $ 28.00 $ 504.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 18 $ 32.00 $ 576.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 8 $ 200.00 $ 1,600.00 Splicing, Fusion, Single Fiber -->[EA] 13 $ 25.00 $ 325.00 Testing, OTDR, Uni-Directional, Power Meter Testing -->[EA] 13 $ 1.00 $ 13.00 *** . CR Labor Subtotal $ 53,388.10 Material Fiber Material 12 CT Micro Fiber Cable -->[FT] 2,216 $ 0.49 $ 1,085.84 144 CT Micro Fiber Cable -->[FT] 12,503 $ 2.06 $ 25,756.18 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 2,614 $ 0.38 $ 993.32 #12 AWG Solid Thhn Insulated Tracer Wire -->[FT] 2,614 $ 0.11 $ 287.54 Small Vault, 13" x 24" - Composite -->[EA] 5 $ 339.52 $ 1,697.60 Vault, 24" x 36"-->[EA] 3 $ 699.76 $ 2,099.28 Closure Material FOSC 450 B Closure -->[EA] 2 $ 282.02 $ 564.04 Splice Tray for B-Gel Closure (SM12)-->[EA] 2 $ 17.31 $ 34.62 Slack Basket for B-Gel Closure -->[EA] 2 $ 40.73 $ 81.46 Commscope CSC100 Micro Closure -->[EA] 4 $ 65.23 $ 260.92 Commscope CSC150 Micro Closure -->[EA] 2 $ 81.95 $ 163.90 . CR Materials Subtotal $ 33,024.71 TOTAL CR COST $ 86,412.80 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: eirrL / 142.C.r1•P Date: 11/5/25 Contractor Manager (not needed for design change requests) Print Name / Title: Charles Smith Regional Manager0 Signature: eiA- l� Date: 11/5/2025 Client/Owner (Attn) Print Name / Title: Signature: Date: **End** Quentin Hart, Mayor DocuSigned by: atAAlitn, Nun' D0525D78AAC8449... 11/17/2025