HomeMy WebLinkAboutITG_Communications_CO__37,_Cont._No._1088_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
Change Order Request
Change •rter ype
Retainage
CITY OF
�JJI TERLOO
COMMUNICATIONS
E
Community
e�D sign/Engineering
u/Opportunity
Will Be Subject To The Withholdings and Release Set Forth In The
• t ntract Sections 6.2(f)(i) ands)
No
Change Order Name:
CR-2025-0037
.• rder Cos $28,379.01
ITG
equest Date: 10/31/2025
Construction Contractor Name (Attn)
Michael Regan
PM Broadband Implementation
Requested By: Client/Owner
Magellan Project Manager:
Client/Owner (Attn)
City of Waterloo/Waterloo
Fiber/Eric Lage
st Sign -Off Clayton Johnston
VP of Construction
ange Re.. -
Description of Change (include location)
The following Change Order has been created to account for construction labor and material with the new
shelter location on 512 University Ave.
Reason for Change
Due to concerns with a flood zone near the Fletcher Lift Station, potentially damaging the shelter and/or the
equipment inside, the Utility requested a new location at 512 University Ave. This new location was amended
into the original engineering and designs.
Material & Labor pricing has been provided by ITG Communication.
Material Submittals/ Specifications
Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
Itemized Breakdown of Work
Quantity
Unit Price
Location
Work Order #
Description
Amount
w
Underground - Buried Labor
Trench (4) 2" SCH-40 Conduit
15
$ 20.25
$ 303.75
Underground - Buried Labor
Insta11 2" SCH-80 Conduit vertical and attach to building
4
$ 40.00
$ 160.00
Underground - Buried Labor
Install Hammond aluminum box on POP (Includes cutting back of box
and SCH-40 couplers)
1
$ 300.00
$ 300.00
Underground - Buried Labor
Install 5/8"x8' Copper Clad Ground Rod -->[EA]
1
$ 52.00
$ 52.00
Underground - Buried Labor
Installation, Extra Large Vault 33" x 60"-->[EA]
1
$ 540.00
$ 540.00
Patch Panel and Cabinet Labor
Install rack mounted patch panel (Any Size) and tails -->[EA]
4
$ 115.00
$ 460.00
Patch Panel and Cabinet Labor
Insta11 7ft Rack for patch panels -->[EA]
1
$ 400.00
$ 400.00
CR Labor Subtotal
$ 2,215.75
Underground Material
5/8"x8' Copper Clad Ground Rod -->[EA]
1
$ 16.24
$ 16.24
Underground Material
Extra Large Vault 33" x 60" (Split Lid) -->[EA]
1
$ 2,270.43
$ 2,270.43
Underground Material
2" SCH-40 (10' sticks cost per foot)
60
$ 1.46
$ 87.60
Underground Material
2" SCH-40 90 degree Sweep
4
$ 6.54
$ 26.16
Underground Material
2" SCH-40 45 degree Elbow
4
$ 6.37
$ 25.48
Underground Material
2" SCH 80 PVC
40
$ 2.23
$ 89.20
Underground Material
2" Expansion Coupler
4
$ 82.25
$ 329.00
Patch Panels & Cabinets Material
Clearfield FieldSmart Fiber Crossover Distribution System (FxDS)
1
$ 23,319.15
$ 23,319.15
Frame w/door kit, 288 Panels (4), 12-port cassettes (96), 7' x 23"
Frame, Iso pad, Mount kit,cable trays and troughs
$
$
$
$
$
$
I
***
CR Materials Subtotal
26,163.26
***
TOTAL CR COST
I $ 28
Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
Magellan Sign -Off
Print Name / Title: Clayton Johnston VP of Construction
Signature: 2411.4.&11
Date: 11 /5/2
7Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Print Name / Title:
Signature:
Date:
**End**
Charles Smith
Regional Managed
11/5/2025
Quentin Hart, Mayor
DocuSigned by:
D0525D78AAC8449...
11/17/2025