Loading...
HomeMy WebLinkAboutITG_Communications_CO__37,_Cont._No._1088_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Change Order Request Change •rter ype Retainage CITY OF �JJI TERLOO COMMUNICATIONS E Community e�D sign/Engineering u/Opportunity Will Be Subject To The Withholdings and Release Set Forth In The • t ntract Sections 6.2(f)(i) ands) No Change Order Name: CR-2025-0037 .• rder Cos $28,379.01 ITG equest Date: 10/31/2025 Construction Contractor Name (Attn) Michael Regan PM Broadband Implementation Requested By: Client/Owner Magellan Project Manager: Client/Owner (Attn) City of Waterloo/Waterloo Fiber/Eric Lage st Sign -Off Clayton Johnston VP of Construction ange Re.. - Description of Change (include location) The following Change Order has been created to account for construction labor and material with the new shelter location on 512 University Ave. Reason for Change Due to concerns with a flood zone near the Fletcher Lift Station, potentially damaging the shelter and/or the equipment inside, the Utility requested a new location at 512 University Ave. This new location was amended into the original engineering and designs. Material & Labor pricing has been provided by ITG Communication. Material Submittals/ Specifications Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Itemized Breakdown of Work Quantity Unit Price Location Work Order # Description Amount w Underground - Buried Labor Trench (4) 2" SCH-40 Conduit 15 $ 20.25 $ 303.75 Underground - Buried Labor Insta11 2" SCH-80 Conduit vertical and attach to building 4 $ 40.00 $ 160.00 Underground - Buried Labor Install Hammond aluminum box on POP (Includes cutting back of box and SCH-40 couplers) 1 $ 300.00 $ 300.00 Underground - Buried Labor Install 5/8"x8' Copper Clad Ground Rod -->[EA] 1 $ 52.00 $ 52.00 Underground - Buried Labor Installation, Extra Large Vault 33" x 60"-->[EA] 1 $ 540.00 $ 540.00 Patch Panel and Cabinet Labor Install rack mounted patch panel (Any Size) and tails -->[EA] 4 $ 115.00 $ 460.00 Patch Panel and Cabinet Labor Insta11 7ft Rack for patch panels -->[EA] 1 $ 400.00 $ 400.00 CR Labor Subtotal $ 2,215.75 Underground Material 5/8"x8' Copper Clad Ground Rod -->[EA] 1 $ 16.24 $ 16.24 Underground Material Extra Large Vault 33" x 60" (Split Lid) -->[EA] 1 $ 2,270.43 $ 2,270.43 Underground Material 2" SCH-40 (10' sticks cost per foot) 60 $ 1.46 $ 87.60 Underground Material 2" SCH-40 90 degree Sweep 4 $ 6.54 $ 26.16 Underground Material 2" SCH-40 45 degree Elbow 4 $ 6.37 $ 25.48 Underground Material 2" SCH 80 PVC 40 $ 2.23 $ 89.20 Underground Material 2" Expansion Coupler 4 $ 82.25 $ 329.00 Patch Panels & Cabinets Material Clearfield FieldSmart Fiber Crossover Distribution System (FxDS) 1 $ 23,319.15 $ 23,319.15 Frame w/door kit, 288 Panels (4), 12-port cassettes (96), 7' x 23" Frame, Iso pad, Mount kit,cable trays and troughs $ $ $ $ $ $ I *** CR Materials Subtotal 26,163.26 *** TOTAL CR COST I $ 28 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: 2411.4.&11 Date: 11 /5/2 7Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Print Name / Title: Signature: Date: **End** Charles Smith Regional Managed 11/5/2025 Quentin Hart, Mayor DocuSigned by: D0525D78AAC8449... 11/17/2025