Loading...
HomeMy WebLinkAboutMidstate_Solution_-_CO__1,_Cont._No._1131_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C CITY OF WATERLOO, IOWA CHANGE ORDER NO. 01 PROJECT: FY2026 SIDEWALK INFILL, SIDEWALK RAMP & TRAIL REPAIR PROGRAM --ZONE 5A, CONTRACT NO. 1131 DATE PREPARED: 10/31/25 AMOUNT: $101,249.58 INCREASE TO; MIDSTATE SOLUTION , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated OCTOBER 20.2025 . A. Description of change to be made or extra work to be done: Increase repair quantities. 8. Reason for ordering change or extra work: Availability of additional funds has allowed for the inclusion of trail repair and sidewalk infill in other locations in the City that meet the criteria for repair. C. Settlement for cost of work to be made as follows: BY DIVISION 1 - SIDEWALK INFILL BID ITEM ITEM DESCRIPTION UNIT QTYS UNIT PRICE TOTAL PRICE 1001 SIDEWALK, PCC, 4" SF 44.6 $ 5.00 $ 223.00 1002 EXCAVATION, CLASS 10 SF 89.3 $ 0.50 $ 44.65 1003 HYDROSEEDING SF 44.6 $ 0.50 $ 22.30 290.0 DIVISION 3 - TRAIL REPAIRS BID ITEM ITEM DESCRIPTION UNIT QTYS UNIT PRICE TOTAL PRICE 2001 REMOVE TRAIL, PCC SF 10,989.4 $ 1.00 $ 10,989.43 2002 TRAIL, PCC, 6" SF 10,989.4 $ 7.25 $ 79,673.37 2003 HYDROSEEDING SF 4,395.8 $ 0.75 $ 3,296.83 2004 DETECTABLE WARNING SURFACE SF 40.0 $ 50.00 $ 2,000.00 2005 TRAFFIC CONTROL LS 1.0 $ 5,000.00 $ 5,000.00 $ 100,959.63 DocuSigned by: r AttAliln, ika 11/17/2025 MAigzjSAACo44s.. DATE ATnefby: lathy flidat 11/17/2025 CITY E acc4Ao .. DATE TOTAL INCREASE = $101,249.58 MIDSTATE SOLUTION CONTRACTQR BY: Veil; TITLE: om ... MiAiw APPROVED: CITY ENGINEER 1 1O/1/a5 DATE ///a/ D TE