HomeMy WebLinkAboutMidstate_Solution_-_CO__1,_Cont._No._1131_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
CITY OF WATERLOO, IOWA
CHANGE ORDER NO. 01
PROJECT: FY2026 SIDEWALK INFILL, SIDEWALK RAMP & TRAIL REPAIR PROGRAM --ZONE 5A, CONTRACT NO. 1131
DATE PREPARED: 10/31/25 AMOUNT: $101,249.58 INCREASE
TO; MIDSTATE SOLUTION , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your
contract dated OCTOBER 20.2025 .
A. Description of change to be made or extra work to be done:
Increase repair quantities.
8. Reason for ordering change or extra work:
Availability of additional funds has allowed for the inclusion of trail repair and sidewalk infill in other locations in the City that meet
the criteria for repair.
C. Settlement for cost of work to be made as follows:
BY
DIVISION 1 - SIDEWALK INFILL
BID
ITEM
ITEM DESCRIPTION
UNIT
QTYS
UNIT PRICE
TOTAL PRICE
1001
SIDEWALK, PCC, 4"
SF
44.6
$ 5.00
$ 223.00
1002
EXCAVATION, CLASS 10
SF
89.3
$ 0.50
$ 44.65
1003
HYDROSEEDING
SF
44.6
$ 0.50
$ 22.30
290.0
DIVISION 3 - TRAIL REPAIRS
BID
ITEM
ITEM DESCRIPTION
UNIT
QTYS
UNIT PRICE
TOTAL PRICE
2001
REMOVE TRAIL, PCC
SF
10,989.4
$ 1.00
$ 10,989.43
2002
TRAIL, PCC, 6"
SF
10,989.4
$ 7.25
$ 79,673.37
2003
HYDROSEEDING
SF
4,395.8
$ 0.75
$ 3,296.83
2004
DETECTABLE WARNING
SURFACE
SF
40.0
$ 50.00
$ 2,000.00
2005
TRAFFIC CONTROL
LS
1.0
$ 5,000.00
$ 5,000.00
$ 100,959.63
DocuSigned by:
r AttAliln, ika 11/17/2025
MAigzjSAACo44s.. DATE
ATnefby:
lathy flidat 11/17/2025
CITY E acc4Ao .. DATE
TOTAL INCREASE = $101,249.58
MIDSTATE SOLUTION
CONTRACTQR
BY: Veil;
TITLE: om ... MiAiw
APPROVED:
CITY ENGINEER
1
1O/1/a5
DATE
///a/