HomeMy WebLinkAboutOwen_Contracting_-_CO__2_Waterloo_Taxiway_A_West_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
CHANGE ORDER NO. 2
Owner: Waterloo Regional Airport, City of Waterloo, Iowa
Project: Reconstruct Taxiway A West
Owner's Contract No. FAA AIP Project No. 3-19-0094-056-2023 BIL
Contractor: Owen Contracting, Inc.
Date of Contract Start: April 3, 2023
Date: October 13, 2025
You are directed to make the following changes in the Contract Documents. Description:
Item
No.
Description
Unit
Unit Price
Contract
Quantity
Change
Percent
Change
Revised
Quantity
Amount
33
SEEDING
AC
$ 1,400.00
3.0
2.2
73%
5.2
$ 3,080.00
35
MULCHING, HYDRO -APPLIED
AC
$ 1,700.00
3.0
2.2
73%
8.2
$ 3,740.00
Total Change Order $ 6,820.00
Reason for Change Order:
33 & 35 — Original seeding and mulching did not establish due to excessive rainfall that occurred post -seeding.
The area required reseeding and mulching.
ALO FAA AIP 3-19-0094-056-2023 BIL
CO-2 Project No — 60695167
Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C
CONTRACT PRICE
Original: $
Previous C.O.s (DEDUCT):$
This C.O. (ADD): $
Liquidated Damages: $
(21 Days @ $1,000/Day
Previously Processed)
2,488,523.75
(139,049.45)
6,820.00
(21,000.00)
Contract Price with all
approved Change Orders: $ 2,335,294.30
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original:
Previous C.O.s (ADD):
This C.O. (ADD):
REVISED:
120
0
0
120
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: �� 3.
Engineer (Authorized Signature)
APPR`"b` 1E D:ed by:
&.t, in, tsar?
wneiTAtilinzed Signature)
By:
ACCEPTED:
By: a- Ow
Co actor (Authorized Signature)
11/5/2025
Date
11/17/2025
Date
10/14/25
Date
ALO FAA AIP 3-19-0094-056-2023 BIL
CO-2 Project No — 60695167
2