HomeMy WebLinkAboutPeters_Construction_-_Terminal_Canopy_-_Change_Order_No_3_-_11.17.25Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C CHANGE ORDER NO. 3 Owner: Waterloo Regional Airport, City of Waterloo, Iowa Project: Terminal Parking Canopy Structure Owner's Contract No. ICAIF Project No. 9I220AL0400 Contract No. 0004232 Contractor: Peters Construction Corporation Date of Contract Start: November 6, 2023 Date: October 22, 2025 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Contract Quantity Change Percent Change Revised Quantity Amount 111 UTILITY LOCATES LS $ 2,058.39 - 1.0 - 1.0 $ 2,058.39 112 RELOCATE BARRIER GATES LS $ 3,454.78 - 1.0 - 1.0 $ 3,454.78 113 AIRPORT BRANDING ALLOWANCE LS $ (10,000.00) - 1.0 - 0.0 $ (10,000.00) 114 BIRD CONTROL LS $ (9,828.00) - 1.0 - 0.0 $ (9,828.00) Total Change Order $ (14,314.83) Reason for Change Order: 111 — Contract modification locating existing underground utilities differing from the "as -built" locations from previous project plans. 112 — Contract modification revising the final gate arm location and arrangement to facilitate the parking lot entry and exit canopy geometries. 113 — Contract modification to remove airport branding from the scope of work. 114 — Contract modification to remove bird control from the scope of work. ICAIF Project No — 9I220AL0400 Contract No. 0004232 CO-3 Project No — 60723532 1 Docusign Envelope ID: 05D585E8-8EDA-4802-A8A3-5749EAF8E48C CONTRACT PRICE Original: $ 2382.854.00 Previous C.O.s (ADD): $ 31,932.89 This C.O. (DEDUCT): $ 14,314.83 Contract Price with all approved Change Orders: $ 2,400,472.06 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (DEDUCT): REVISED: 380 10 0 390 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: c-L\ 3 10/24/2025 Engineer (Authorized Signature) Date APP,13..QVd by: at,ik, lUvt 11/17/2025 By. %,—UUSGS /MA kf44y.. Owner (Authorized Signature) Date ACCEPTED: By Contractor (Authorized Signature) Lc/2L//z1 Date ICAIF Project No — 9I220AL0400 Contract No. 0004232 CO-3 Project No — 60723532 2