HomeMy WebLinkAboutAECOM_-_SA__2,_Cont._No._1128,_La_Porte_Road_Reconstruction_Ph_2_-_12.1.2025Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Contract No. Owner Project No. Iowa DOT Project No. HDP-8155(787)-71-07 Standard Consultant Contract Supplemental Agreement 2 For Local Public Agency Consultant Contracts with Federal -aid Participation This AGREEMENT, made as of the date of the last party's signature below, is by and BETWEEN City of Waterloo, the Owner, located at: 715 Mulberry Street Waterloo, Iowa 50703 Phone: (319) 291-4312 FAX: (319) 291-4262 and AECOM Technical Services, Inc., the Consultant, located at: 501 Sycamore Street, Suite 222 Waterloo, Iowa 50703 Phone: (319) 232-6531 FAX: (319) 232-0271 For the following Project: La Porte Road Reconstruction Project. The Owner has decided to proceed with the Project, subject to the concurrence and approval of the Iowa Department of Transportation (Iowa DOT), and the Federal Highway Administration (FHWA), U.S. Department of Transportation (when applicable). The Owner desires to employ the Consultant to provide Phase 2 Construction Engineering services to assist with the development and completion of the Project. The Consultant is willing to perform engineering services in accordance with the terms of this Agreement. Page 1 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 TABLE OF CONTENTS Article Number And Description 1 Initial Information 1.1 Referenced Agreement/Supplemental Agreement No. 2 1.2 Project Parameters 1.3 Financial Parameters 1.4 Project Team 1.5 Time Parameters Attachment A — Scope of Services Attachment C-1 — Cost Analysis Worksheet Page 2 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 ARTICLE 1 INITIAL INFORMATION This Agreement is based on the following information and assumptions. 1.1 Referenced Agreement/Supplemental Agreement No. 2 This Supplemental Agreement No. 2 is part of the Standard Consultant Agreement for the La Porte Road Reconstruction Project between AECOM Technical Services, Inc. (hereinafter referred to as the "Consultant") and the City of Waterloo (hereinafter referred to as the "Client"). All terms and conditions of the original agreement shall remain in effect for work associated with this Supplemental Agreement, unless specifically noted in a new agreement. The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement is One Million Three Hundred Sixty -Four Thousand Five Hundred Dollars ($1,364,500.00), as shown in Article 1.3 and Attachments C and C-1, and shall be segregated from the fees in the original agreement and Supplemental Agreement No. 1. 1.2 Project Parameters The objective or use is: Provide Phase 2 Construction -Related Service for the construction of La Porte Road — Phase 2, from Highway 218 to Plymouth Avenue, a distance of approximately 0.7 miles. The project also consists of a trail connection along Highway 218 between Hawthorne Avenue and 18th Street. The trail will be parallel to the existing railroad and will protrude into the railroad right-of-way (ROW). The project will include grading, paving, landscaping, enhancements, sanitary and storm sewer, fiber, lighting and traffic signalization. This project will allow for portions of La Porte Road to be closed to traffic for construction with traffic control staging and detour routing. 1.3 Financial Parameters 1.3.1 Amount of the Owner's budget for the Consultant's compensation is: Division VI (RAISE and Local Funding) $1,345,200.00 Division VII (Local Funding) $ 19,300.00 Total $1,346,500.00 1.3.2 Amount of the Consultant's budget for the subconsultants' compensation is: Division VI $116,100.00 Total $116,100.00 1.4 Project Team 1.4.1 The Owner's Designated Representative, identified as the Contract Administrator is: Mr. Jamie Knutson, PE, City Engineer The Contract Administrator is the authorized representative, acting as liaison officer for the Owner for purpose of coordinating and administering the work under the Agreement. The work under this Agreement shall at all times be subject to the general supervision and direction of the Contract Administrator and shall be subject to the Contract Administrator's approval. 1.4.2 The Consultant's Designated Representative is: Mr. Tony Hemann, PE, Project Manager Page 3 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 1.4.3 The subconsultants retained at the Consultant's expense are identified in the following table: Subconsultant Amount Authorized Maximum Amount Payable Method of Payment Division VI HR Green $ 12,200.00 $ 13,300.00 CPFF Terracon $ 24,000.00 $ 26,200.00 CPFF Robinson Engineering $ 57,900.00 $ 63,100.00 Fixed OH Rate RITLAND+KUIPER L.A. $ 12,300.00 $ 13,500.00 Unit Rate Total $ 106,400.00 $ 116,100.00 1.5 Time Parameters 1.5.1 The Consultant shall begin work under this Agreement upon receipt of a written notice to proceed from the Owner. 1.5.2 Milestones for completion of the work under this Agreement as follows: 1. Completion of all work under this agreement shall be on or before 7/1/2029 unless extended by written approval of the Contract Administrator or adjusted by supplemental agreement. Page 4 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their proper officials thereunto duly authorized as of the dates below. AECOM Technical Services, Inc. By ed4 ��� 11/14/2025 � Date: Michelle M. Sweeney, PE, PTOE Associate Vice President ATTEST: By Kimberley Smith City of Waterloo DocuSigned by: l &t t& slit, (kart Bye Bes a'3 CC443. Quentin Hart Mayor Date: 11/14/2025 Date: 12/1 /2025 IOWA DEPARTMENT OF TRANSPORTATION Accepted for FHWA Authorization* By Date: Name Title * The Iowa DOT is not a party to this agreement. However, by signing this agreement, the Iowa DOT is indicating the work proposed under this Agreement is acceptable for FHWA authorization of Federal funds. Page 5 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 ATTACHMENT A Scope of Services LA PORTE ROAD RECONSTRUCTION PROJECT CITY OF WATERLOO, IOWA CONSTRUCTION -RELATED SERVICES LA PORTE ROAD — PHASE 2 — HIGHWAY 218 TO PLYMOUTH AVENUE SUPPLEMENTAL AGREEMENT NO. 2 PROJECT DESCRIPTION The project consists of the construction of La Porte Road — Phase 2, from Highway 218 to Plymouth Avenue, a distance of approximately 0.7 miles. The project also consists of a trail connection along Highway 218 between Hawthorne Avenue and 18th Street. The trail will be parallel to the existing railroad and will protrude into the railroad right-of-way (ROW). The project will include grading, paving, landscaping, enhancements, sanitary and storm sewer, fiber, lighting and traffic signalization. This project will allow for portions of La Porte Road to be closed to traffic for construction with traffic control staging and detour routing. II. SCOPE OF SERVICES La Porte Road Phase 2 Project Division VI — Construction -Related Services (RAISE Grant and Local Funding) The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant, subconsultants, FHWA, Iowa DOT and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Project Control b. Set Stakes for Erosion Control c. Grading (GPS) d. Set Stakes for Storm Sewer e. Set Stakes for Sanitary Sewer f. Set Stakes for Paving g. Set Stakes for Trail Paving h. Set Stakes for Sidewalks Set Stakes for Lighting j. Set Stakes for Traffic Signals (RRFB) k. Set Stakes for Type A Signs Set Stakes for Landscaping m. Set Stakes for Right -of -Way and Easements n. Set Stakes for Box Culvert Extensions o. Set Stakes for Utility Coordination Task 3. Review shop drawings and other submittals uploaded to DocExpress as required of the Contractor by the contract documents for general conformance with the design concept of the project and compliance with the information given in the contract documents. (Robinson Engineering, RITLAND+KUIPER Landscape Architects and HR Green Inc. will assist with review of shop drawings as needed.) Page 6 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. (Robinson Engineering, RITLAND+KUIPER Landscape Architects and HR Green Inc. will assist with answering design interpretation questions as needed.) Task 5. Prepare bi-weekly applications and upload to Appia for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work generally conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to be in general conformance to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. The project completion date is anticipated to be completed by November 2027. (Robinson Engineering will assist with periodic field observations as needed. Terracon Consultants will assist with an estimated 10 plant monitoring events, 60 gradations, and 5 proctors.) Task 9. Coordinate project construction progress and assist the Client and Contractor with proper ROW entry notification to the railroad company. Maintain Contractor and AECOM railroad insurance files for correspondence. Task 10. Provide weekly SWPPP reviews along with City of Waterloo and Contractor personnel, as required by Iowa DNR and City of Waterloo. (Robinson Engineering will provide weekly SWPPP reviews.) Task 11. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents and advise the Client of any work that should be corrected or rejected. Task 12. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 13. Facilitate weekly construction progress meetings of project and complete minutes for each meeting. Task 14. Prepare weekly email updates for distribution to City of Waterloo staff, citizens and other interested parties of the project's progress. Maintain updates as needed for media outlets. Provide information for the City of Waterloo to post on the City's website and maintain Facebook page for the La Porte Road Project. Also includes preparation of traffic maps/detour maps, individual maps for business owners, additional stakeholder meetings (a total of 10 meetings are anticipated) and construction update reports to City Council work sessions (a total of three presentations are anticipated). Task 15. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 16. Participate in a field observation of the completed project with the Client, Iowa DOT, FHWA and review staff before a final application for payment is processed for the Contractor. Task 17. Maintain files for correspondence, Davis -Bacon and Build America, Buy America requirements, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 18. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Page 7 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Task 19. Prepare and assist the Client with the final close-out documentation received from the Contractor. This project will use DocExpress and Appia for document management during construction. Final Review with Iowa DOT is anticipated to be completed based on the Iowa DOT's Project Review and Close-out Checklist for Local Public Agency Projects. Close-out documents will be uploaded to DocExpress and Appia in electronic format to the Client and include the following: shop drawings, materials certifications, pay estimates, change orders, daily inspection reports, pay quantity summary and record drawings. This task includes correspondence through the Iowa DOT audit. Division Vll — Construction -Related for Fiber (Local Funding) The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the fiber included with the project defined above. The Scope of Services is further defined as follows: Task 20. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Stakes for Fiber Task 21. Review shop drawings and other submittals uploaded to DocExpress as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 22. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 23. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 24. Prepare and assist the Client and Contractor in processing contract change orders. Task 25. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Task 26. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Page 8 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 ATTACHMENT C (referenced from 3.1) Cost Plus Fixed Fee 3.1.1 FEES AND PAYMENTS 3.1.1.1 Fees. For full and complete compensation of all work, materials, and services furnished under the terms of this Agreement, the Consultant shall be paid fees in the amount of the Consultant's actual cost plus applicable fixed fee amount. The Consultant's actual costs shall include payments to any subconsultants. The estimated actual costs and fixed fee are shown below and are itemized in Attachment C-1. Subconsultant costs are not available for use by the prime Consultant or other subconsultants. A contingency amount has been established to provide for actual costs that exceed those estimated. Estimated Actual Costs (Prime Only) Fixed Fee (Prime Only) Contingency (Prime Only) Total Prime Consultant Costs Subconsultant Division VI HR Green Terracon Robinson Engineering RITLAND+KUIPER L.A. Total Subconsultant Costs (Division IV) Total Amount Authorized Division VI Division VII Division VI Division VII $ 1,004,800.00 $ 16,000.00 $ 123,800.00 $ 1,700.00 $ 100,500.00 $ 1,600.00 $ 1,229,100.00 $ 19,300.00 Total $ 1,020,800.00 $ 125,500.00 $ 102,100.00 $ 1,248,400.00 Amount Contingency Maximum Amount Authorized Payable $ 12, 200.00 $ 1,100.00 $ 24,000.00 $ 2,200.00 $ 57,900.00 $ 5,200.00 $ 12,300.00 $ 1,200.00 $ 13,300.00 $ 26,200.00 $ 63,100.00 $ 13,500.00 $ 106,400.00 $ 9,700.00 $ 116,100.00 $ 1, 235, 000.00 $ 17,700.00 Total $ 1,252,700.00 Maximum Amount Payable (Includes Contingency) Division VI Division VII $ 1, 345, 200.00 $ 19, 300.00 Total $ 1,364,500.00 The nature of engineering services is such that actual costs are not completely determinate. Therefore, the Consultant shall establish a procedure for comparing the actual costs incurred during the performance of the work to the estimated actual costs listed above. The procedure will itemize prime consultant and subconsultant costs in association with each scoped task. The purpose is to monitor these two elements and thus provide for early identification of any potential for the actual costs exceeding the estimated actual costs. The procedure shall be used in a way that will allow enough lead time to execute the paragraphs below without interrupting the work schedule. Therefore once the accrued labor costs for a scoped task reach 85% of the estimated value for the prime or subconsultant, then the Consultant shall notify the Owner in writing. It is possible that the Consultant's costs for the scoped tasks may need to exceed those shown in Attachment C-1. The Consultant's and subconsultants' costs for scoped tasks shall not be exceeded without prior written authorization from the Contract Administrator and concurrence from the Iowa DOT. Page 9 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Costs for scoped tasks that exceed estimated costs, if approved by the Contract Administrator, may be compensated via Supplemental Agreement, Work Order, Amendment, or Contingency as detailed in the paragraphs below. If the Consultant exceeds the estimated costs for scoped tasks for any reason (other than that covered in Section 3.1.1.2) before the Contract Administrator is notified in writing, the Owner will have the right, at its discretion, to deny compensation for that amount. The fixed fee amount will not be changed unless there is a substantial reduction or increase in scope, character, or complexity of the services covered by this Agreement or the time schedule is changed by the Owner. The adjustment to fixed fee will consider both cumulative and aggregate changes in scope, character, or complexity of the services. Any change in the fixed fee amount will be made by a Supplemental Agreement, Work Order, or Amendment. If a contingency amount has been established and at any time during the work the Consultant determines that its actual costs will exceed the estimated actual costs, thus necessitating the use of a contingency amount, it will promptly so notify the Contract Administrator in writing and describe what costs are causing the overrun and the reason. The Consultant shall not exceed the estimated actual costs without the prior written approval of the Contract Administrator and concurrence of the Iowa DOT. The Owner or Iowa DOT may audit the Consultant's cost records prior to authorizing the use of a contingency amount. The maximum amount payable will not be changed except for a change in the scope. Changes due to an overhead adjustment are identified in Section 3.1.1.2. If at any time it is determined that a maximum amount payable will be or has been exceeded, the Consultant shall immediately so notify the Contract Administrator in writing. The maximum amount payable shall be changed by a Supplemental Agreement, Work Order, or Amendment or this Agreement will be terminated as identified in Article 4.12.3. The Owner may audit the Consultant's cost records prior to making a decision whether or not to increase the maximum amount payable. 3.1.1.2 Reimbursable Costs. Reimbursable costs are the actual costs incurred by the Consultant which are attributable to the specific work covered by this Agreement and allowable under the provisions of the Code of Federal Regulations (CFR), Title 48, Federal Acquisition Regulations Systems, Subchapter E., Part 30 (when applicable), and Part 31, Section 31.105 and Subpart 31.2. In addition to Title 48 requirements, for meals to be eligible for reimbursement, an overnight stay will be required. The Title 48 requirements include the following: 1. Salaries of the employees for time directly chargeable to work covered by the Agreement, and salaries of principals for time they are productively engaged in work necessary to fulfill the terms of the Agreement. 2. Direct non -salary costs incurred in fulfilling the terms of this Agreement. The Consultant will be required to submit a detailed listing of direct non -salary costs incurred and certify that such costs are not included in overhead expense pool. These costs may include travel and subsistence, reproductions, computer charges and materials and supplies. 3. The indirect costs (salary related expenses and general overhead costs) to the extent that they are properly allowable to the work covered by this Agreement. The Consultant has submitted to the Owner the following indirect costs as percentages of direct salary costs to be used provisionally for progress payments for work accomplished during the Consultant's current fiscal year: General overhead costs are 121.28% of direct salary costs. Use of updated overhead percentage rates shall be requested by the Consultant after the close of each fiscal year and the updated overhead rate shall be used to update previous year invoices and subsequent years as a provisional rate for invoicing in order to more accurately reflect the cost of work during the previous and subsequent years. Any actual fiscal year or fiscal year's audited or unaudited indirect costs rates known by the Consultant shall be used in computing the final invoice statement. All unverified overhead rates shall have a schedule of computation supporting the proposed rate attached to the final bill. Prior to final payment for work completed under this Agreement all indirect cost rates shall be audited Page 10 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 and adjusted to actual rates through the most recently completed fiscal year during which the work was actually accomplished. In the event that the work is completed in the current fiscal year, audited indirect cost rates for the most recently completed fiscal year may be applied also to work accomplished in the current fiscal year. If these new rates cause the actual costs to be exceeded, the contingency amount will be used. 3.1.1.3 Premium Overtime Pay. Premium overtime pay (pay over normal hourly pay) will not be allowed without written authorization from the Contract Administrator. If allowed, premium overtime pay shall not shall not exceed 2 percent of the total direct salary cost without written authorization from the Contract Administrator. 3.1.1.4 Payments. Monthly payments shall be made based on the work completed and substantiated by monthly progress reports. The report shall indicate the direct and indirect costs associated with the work completed during the month. The Contract Administrator will check such progress reports and payment will be made for the direct non -salary costs and salary and indirect costs during said month, plus a portion of the fixed fee. The Owner shall retain from each monthly payment for construction inspection or construction administration services 0% of the amount due. Fixed fee will be calculated and progressively invoiced based on actual costs incurred for the current billing cycle. Each invoice shall be accompanied with a monthly progress report which details the tasks invoiced, estimated tasks to be billed on the next invoice, and any other contract tracking information. Invoices shall clearly identify the beginning and ending dates of the prime's and subconsultant's billing cycles. All direct and indirect costs incurred during the billing cycle shall be invoiced. Costs incurred from prior billing cycles and previously not billed, will not be allowed for reimbursement unless approved by the Contract Administrator. Upon delivery and acceptance of all work contemplated under this Agreement, the Consultant shall submit one complete invoice statement of costs incurred and amounts earned. Payment of 100% of the total cost claimed, inclusive of retainage, if applicable, will be made upon receipt and review of such claim. Final audit will determine correctness of all invoiced costs and final payment will be based upon this audit. The Consultant agrees to reimburse the Owner for possible overpayment determined by final audit. Page 11 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Attachment C-1 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 COST ANALYSIS - DIVISION VI I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.3 Senior Professional 12 $100.56 $1,206.72 3.3 Project Professional I 14 $74.29 $1,040.06 4.3 Staff Professional 122 $62.75 $7,655.50 4.6 Staff Professional 202 $50.14 $10,128.28 5.1 Professional II 908 $48.21 $43,774.68 6.7 Professional I 72 $35.38 $2,547.36 7.3 CADD Operator II 1,500 $36.50 $54,750.00 9.1 Senior Technician 3,210 $54.60 $175,266.00 9.3 Senior Technician 1,580 $41.98 $66,328.40 10.1 Technician 834 $32.38 $27,004.92 10.2 Technician 858 $25.00 $21,450.00 11.2 Project Support 420 $45.75 $19,215.00 $430,366.92 9732 II. Payroll Burden and Overhead Provisional Costs 121.28% $521,949.00 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 35000 0.7 24,500.00 Per Diem 0 60.00 0.00 Lodging 0 110.00 0.00 B/W Copies 5000 0.06 300.00 Color Copies 10000 0.22 2,200.00 EDM Equipment 1000 15.00 15,000.00 GPS Equipment 500 15.00 7,500.00 Miscellaneous, Other 3,000.00 IV. AECOM Estimated Actual Costs V. Fixed Fee (13%) VI. Prime Consultant Authorized Costs VII. Authorized Subcontract Expense HR Green Terracon Robinson Engineering RITLAND+KUIPER Rounded $123,801.07 Rounded $12,200.00 $24,000.00 $57,900.00 $12,300.00 $52,500.00 $1,004,815.92 $1,004,800.00 $123,800.00 $1,128,600.00 $106,400.00 VIII. Authorized Budget $1,235,000.00 IX. Contingency (10%) $100,480.00 (AECOM) $100,500.00 Rounded AECOM $100,500.00 HR Green $1,100.00 Terracon $2,200.00 Robinson Engineering $5,200.00 RITLAND+KUIPER $1,200.00 $110,200.00 X. Maximum Amount Payable $1,345,200.00 Page 12 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 Attachment C-1 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 COST ANALYSIS - DIVISION VII I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.3 Senior Professional 0 $100.56 $0.00 3.3 Project Professional I 0 $74.29 $0.00 4.3 Staff Professional 8 $62.75 $502.00 4.6 Staff Professional 0 $50.14 $0.00 5.1 Professional II 20 $48.21 $964.20 6.7 Professional I 8 $35.38 $283.04 7.3 CADD Operator II 40 $36.50 $1,460.00 9.1 Senior Technician 8 $54.60 $436.80 9.3 Senior Technician 0 $41.98 $0.00 10.1 Technician 30 $32.38 $971.40 10.2 Technician 30 $25.00 $750.00 11.2 Project Support 12 $45.75 $549.00 $5,916.44 156 II. Payroll Burden and Overhead Provisional Costs 121.28% $7,175.46 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 1000 0.7 700.00 Per Diem 0 60.00 0.00 Lodging 0 110.00 0.00 B/W Copies 1000 0.06 60.00 Color Copies 1000 0.22 220.00 EDM Equipment 30 15.00 450.00 GPS Equipment 30 15.00 450.00 Miscellaneous, Other 1,000.00 IV. AECOM Estimated Actual Costs V. Fixed Fee (13%) VI. Prime Consultant Authorized Costs VII. Authorized Subcontract Expense VIII. Authorized Budget Rounded IX. Contingency (10%) $1,600.00 (AECOM) $1,600.00 Rounded $2,880.00 $15,971.90 $16, 000.00 $1,701.95 Rounded $1,700.00 AECOM $1,600.00 $17, 700.00 $0.00 $17, 700.00 $1,600.00 X. Maximum Amount Payable $19,300.00 Page 13 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo AECOM Technical Services, Inc. Staff Hour Estimate Description of Work 1.3 Senior Prof 3.3 Project Prof I 4.3 Staff Prof 4.6 Staff Prof 5.1 Prof II 6.7 Prof I 7.3 CADD Op I 9.1 Snr Tech 9.3 Snr Tech 10.1 Technician 10.2 Technician 11.2 Project Support Total DIVISION W- (RAISE and Local Funding) La Porte Road Phase 2 Construction Related Services 1 Conduct Pre -Construction Conference 2 2 2 10 2 18 2 Construction Staking 120 834 858 1,812 3 Review Shop Drawings 80 20 100 4 Answer Design Questions 40 80 120 5 Prepare Pay Applications 50 120 170 6 Construction Site Visits -Design Personnel 6 6 40 100 152 7 Prepare Contract Change Orders 40 80 20 140 8 Field Observation 1,500 2,700 1,500 5,700 9 Railroad Coordination 16 16 10 SWPPP Reviews 4 20 24 11 Reports to Client 80 20 100 12 Consider Contractor Modifications 40 80 120 13 Bi-Weekly Progress Meetings 100 100 200 14 Public Information Distribution including weekly updates 40 80 40 20 180 15 Field Review Near Project Completion 8 24 32 16 Final Project Field Review 8 24 32 17 File Administration 40 240 280 18 Record Drawings 16 32 80 128 19 Prepare Final Close Out Documentation 4 4 80 160 80 80 408 DIVISION VI -(RAISE and Local Funding) -Total = 14 8 72 1,500 3,21034 = 920 9,732 DIVISION WI - (Local Funding) AM Construction -Related Services for Fiber (Local Funding) 20 Construction Staking 8 30 30 68 21 Review Shop Drawings 4 8 12 22 Answer Design Questions 4 4 23 Construction Site Visits - Design Personnel 4 4 24 Prepare Contract Change Orders 4 4 8 25 Field Observation 40 40 26 Record Drawings 4 8 8 20 TOTAL HOURS 12 14 130 202 928 80 1,540 3,218 1,580 864 888 932 9,888 Page 14 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 COST ANALYSIS - HR Green - DIVISION VI Direct Labor Cost (HR Green) Category Hours Rate/Hour Amount Lighting Engineer 30 $81.22 $2,436.60 Traffic Signal Engineer 28 $50.52 $1,414.56 58 I I. Payroll Burden and Overhead Provisional Costs 183.31 III. Direct Project Expenses Category Units Rate/Unit Amount Equipment Rental 0 110 0.00 IV. Estimated Actual Costs Rounded V. Fixed Fee (12%) $1,309.29 Rounded VI. Subconsultant Authorized Amount VII. Contingency (10%) $1,090.00 VIII. Maximum Amount Payable Rounded $3,851.16 $7,059.56 $0.00 $10,910.72 $10,900.00 $1,300.00 $12,200.00 $1,100.00 $13,300.00 Page 15 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo HR Green Staff Hour Estimate Description of Work Lighting Engineer Traffic Engineer Total DIVISION VI - (RAISE and Local Funding) La Porte Road Phase 2 Construction -Related Services 1 Addend Pre -Construction Conference 0 0 0 3 Review Shop Drawings 22 20 42 4 Answer Design Questions 8 8 16 DIVISION VI - (RAISE and Local Funding) - Total 30 28 58 TOTAL HOURS 30 28 58 Page 16 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 COST ANALYSIS - Terracon - DIVISION VI I. Direct Labor Cost (Terracon) Category Hours Rate/Hour Amount Department Manager I - 002488 5 $45.10 $225.50 Project Manager - 001334 58 $37.00 $2,146.00 Engineering Technician III - 208692 175 $22.55 $3,946.25 Resource Coordinator - 007968 28 $25.50 $714.00 $7,031.75 266 II. Payroll Burden and Overhead Provisional Costs 202.86% $14,264.61 FCCM (%) 1.78% $125.17 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 200 0.7 140.00 $140.00 IV. Estimated Actual Costs $21,561.52 Rounded $21,600.00 V. Fixed Fee (12%) $2,555.56 FCCM ($125.17) Fixed Fee Less FCCM $2,430.40 Rounded $2,400.00 VI. Subconsultant Authorized Amount $24,000.00 VII. Contingency (10%) $2,160.00 Rounded $2,200.00 VIII. Maximum Amount Payable $26,200.00 Page 17 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 COST ANALYSIS - Robinson Engineering Company - DIVISION VI I. Direct Labor Cost (Robinson Engineering Company) Category Hours Rate/Hour Amount Principal 0 $40.00 $0.00 Engineer 400 $40.00 $16,000.00 $16,000.00 400 II. Payroll Burden and Overhead Provisional Costs (Fixed) 223.22% $35,715.20 III. Direct Project Expenses Category Units Rate/Unit Amount 0.00 $0.00 IV. Estimated Actual Costs $51,715.20 Rounded $51,700.00 V. Fixed Fee (12%) $6,205.82 Rounded $6,200.00 VI. Subconsultant Authorized Amount $57,900.00 VII. Contingency (10%) $5,170.00 Rounded $5,200.00 VIII. Maximum Amount Payable $63,100.00 Page 18 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Robinson Engineering Company Staff Hour Estimate Description of Work Principal Engineer Total DIVISION VI - (RAISE and Local Funding) La Porte Road Phase 2 Construction -Related Services 1 Pre -Construction Conference 8 Field Observation 9 SWPPP Reviews DIVISION VI - (RAISE and Local Funding) - Total 0 8 80 312 400 8 80 312 400 TOTAL HOURS 0 400 400 Page 19 Docusign Envelope ID: AC81CF90-9C1B-4F9B-AF4C-FA92B4B71C55 La Porte Road Reconstruction Construction Related Services - Phase 2 City of Waterloo Local Systems Project Number: HDP-8155(787)--71-07 Cost Analysis - RITLAND+KUIPER Landscape Architects - DIVISION VI Task No. Description of Work Senior LA 1 Senior LA 2 Landscape Architect Total DIVISION VI - (RAISE and Local Funding) La Porte Road Phase 2 Construction -Related Services 3 Review Shop Drawings 12 12 4 Answer Design Questions 42 42 6 Construction Site Visits - Design Personnel 8 8 12 Weekly Progress Meetings 8 8 14 Field Review Near Project Completion 8 8 15 Final Project Field Review 4 4 DIVISION VI - (RAISE and Local Funding) - Total 0 82 0 82 TOTAL HOURS 0 82 0 82 Hourly Rate Direct Labor Amount Estimated Expenses Direct Expense Costs Estimated Actual Costs Subconsultant Authorized Amount Contingency (10%) - Rounded Maximum Amount Payable (Rounded) $150.00 $0.00 $0.00 Rounded $150.00 $12,300.00 $125.00 $0.00 $12,300.00 $0.00 $12,300.00 $12,300.00 $1,200.00 $13,500.00 Page 20