HomeMy WebLinkAboutASPRO, Inc.-12/14/2015 (C.O. 4 - Rehab of Taxiway A)CUANGE OIIDER NO.4 Owflet WaterlOo Reti0fl AiriOTt Ci ofWatenboo IoWa Date project Rehabilitti0fl of TaxiWa A Owner's contractNo EMPPro•ectNo:il90O94O44 Date of Coflttact Start se.tem 12 2015 You ate directedto make the f0lloWiflg 0angeS in the ConttaCt DoCUm6nt DeseTiPtiOtt Contractot Reason for Change Ordefl Item 9 - The field measured quantitY for HMA paving was sho of the plan quantitY. As a resUh, a poIOfl of this undetrun wiR be utilized to cover the cost of some additional pavement arking. Item 105 - uring a review of the airfteld it was noted that the runWaY edge stripe5 noh of the RunWaY 12-30 craek 5ealing area are athering and in need of replacemwt. In additiofl, the edge stripes on both sides of RunWaY 12-30 need to be outlined in black paint again to inerease the eolor contrast between the paint and the pavement. DiseU5S10 with the paintev on this project have resulted in a slightlY lower unit eost for this additi0fl edge arking (Si .60 per sqUare foot) SO a new bid item has been created. 00-4 RehabilitIt1011 of Twy A Crack ealing RwY 12/30 1 Project No _60340634 CONTRACT PRICE Original: $ 861,208.50 Previous C.O.s (DEDUCT):$ 10.282.00 This C.O. (DEDUCT): $ 19.15 Contract Price with all approved Change Orders: $ 850 907.35 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: � 0 0 90 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: �— Signature) Owner (Authorized Signatun ACCEPTED: By: Cont ctor (Authorized Signature) Rehabilitation of Twy A & Crack Sealing Rwy 12/30 C04 2 'it, Date V -z- l' �0 Date Date Project No — 60340634