Loading...
HomeMy WebLinkAboutFailor Hurley Construction-7/18/2016= Document G704" - 2000 Certificate of Substantia! Completion PROJECT: (Name and address) 13137 Waterloo Center for the Arts Toilet Renovation 225 Commercial Street Waterloo, IA 50701 TO OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 PROJECT NUMBER: 13137/ CONTRACT FOR: General Construction CONTRACT DATE: January 26, 2015 TO CONTRACTOR: (Name and address) Failor Hurley Construction 3337 Marnie Avenue Waterloo, IA 50701 OWNER:X ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty Date of Commencement INVISION Architecture, LTD ` WA ARCHITECT BY May 22, 2015 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within thirty (30) days from the above date of Substantial Completion. �% Failor Hurley V 4fr;1 ). � /2. /2 e//S CONTRACTOR BY DATE The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 5:O0pm (time) on May 22, 2015 (date). City of Waterloo //// i3 `1 OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Oivner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) Both Owner and Contractor to carry such insurance as will protect them for the occupancy and work remaining to be completed AIA Document G704TM — 2000. Copyright® 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA, Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 09:05:59 on 09/04/2015 under Order No.2650364998_1 which expires on 07/20/2016, and is not for resale. User Notes: (1852716113)