Loading...
HomeMy WebLinkAboutAECOM-12/15/2025Docusign Envelope ID: BED542CA-DF4A-48D8-86C9-1 B8ADDAC3F74 AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-439-3089 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com PLANNING AND ENGINEERING SERVICES CITY OF WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 8 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated September 8, 2015, for Planning and Engineering Services to assist Waste Management Services Department for the City of Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 on April 1, 2019, for continuation of Planning and Engineering Services through the end of the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2 on October 22, 2019, for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 3 on December 7, 2020, for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 4 on March 21, 2022, for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 5 on June 5, 2023, for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 6 on August 19, 2024 for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 7 on April 21, 2025 for continuation of additional Planning and Engineering Services for the current fiscal year; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 8 for continuation of additional Planning and Engineering Services for the current fiscal year. Project Description The project is to provide additional planning and engineering services to assist the Waste Management Services Department and Engineering Department for wastewater collection and treatment -related projects and tasks. II. Scope of Services The Scope of Services to be provided under this supplemental agreement is as follows: The work to be performed by ATS will include work, materials, equipment and supplies necessary to continue providing the services described in the tasks defined below similar to previous years. Task 1 - Evaluating Records and Associated Costs. Assist in evaluating existing records to establish the current costs for various activities performed by the Waste Management Docusign Envelope ID: BED542CA-DF4A-48D8-86C9-1 B8ADDAC3F74 AECOM Page 2 Services Department as requested. The current wastewater services activities include the sanitary sewer collection system maintenance and flood control. The breakdown of the costs for these activities will include estimates for the cost for each of the above areas for both residential/commercial flows and industrial flows. This information will be helpful in evaluating proposed industrial expansions, economic development opportunities and rates. Task 2 - Public Meetings. Provide liaison with the City Council regarding Waste Management Services issues. This task will include attending Council meetings, committee meetings and other public meetings to discuss issues relating to Waste Management Services, when necessary. Task 3 - Regulatory Assistance. Provide liaison with regulatory agencies associated with Waste Management Services. The agencies currently involved in these services include the Iowa Department of Natural Resources (IDNR), the Environmental Protection Agency (EPA) and the U.S. Army Corps of Engineers (USACE). Task 4 - Funding Application Assistance. Assist in pursuing funding opportunities with various potential funding sources. This task will include reviewing potential grant and/or loan opportunities and assist in preparing grant and/or loan applications which may benefit the Client in Waste Management Services activities. Task 5 - Capital Improvement Development. Assist in developing a Capital Improvements Plan for Waste Management Services, including projects needed to meet regulatory requirements, resolve existing problems, and maintain existing programs and services. The Capital Improvements Plan will provide a means to estimate future costs which may be used in evaluating bond schedules, funding opportunities and rates. Task 6 - Sanitary Sewer System Planning Assistance. Develop a priority system for implementing improvements in the Client's sanitary sewer collection system. The existing system experiences significant flow increases during wet weather conditions. The need to reduce the flows has been a long-standing need, and the Client has taken significant steps in reducing these extraneous flows in the past. Significant improvements remain to reduce wet weather flows to stay within the system capacity. Sanitary sewer improvements are needed in the public right-of-way and on the private property side to reach the goal of eliminating sanitary sewer overflows and sewer back-ups. This task will assist in prioritizing the sanitary sewer improvements and continuing with the long-range plan to implement the needed improvements. In addition, this task will assist the Client in continuing with the program and policy to address private source infiltration and inflow sources for future and existing portions of the sanitary sewer system. Task 7 - Assist Department/City with Funding Priorities. Coordinate closely with the other City departments (engineering, finance and planning) in developing the Client's Waste Management Services Capital Improvements Plan, priorities and funding issues. Task 8 - Assist with CMOM Activities. Assist the Client's WPCF staff updating and implementing the Capacity, Management, Operation and Maintenance (CMOM) Program for the wastewater treatment and collection system(s). Task 9 - Assist with Inflow and Infiltration Evaluations. Assist the Client in monitoring the ordinance to eliminate extraneous flows from the sanitary sewer system, including footing drains and sump pump connections. Docusign Envelope ID: BED542CA-DF4A-48D8-86C9-1 B8ADDAC3F74 AECOM Page 3 Task 10 - Evaluating Options for Wastewater Treatment and Collection System. Assist the Client in evaluating options for operating the Client's wastewater treatment and collection system(s). Task 11 - Engineering Tasks. Assist the Client in small miscellaneous engineering tasks as requested. Task 12 — Update Existing Hydraulic Model in Coordination the City's Infrastructure Improvements that have occurred since 2015. The City's existing sanitary sewer hydraulic computer model was created in 2015 and 2016. Since that time, there have been a number of sanitary sewer infrastructure improvements that have been completed within the City. This task would be to coordinate with the City on infrastructure improvements that have occurred since then and add those to the model. Once added, field validation of the modeling results would need to occur. AECOM will work with the City reviewing their existing flow metering information and flow data results as part of this validation. Based on validation information, it will be determined if recalibration is necessary within the system. The original model is based on XPSWMM software from 2014 as was required by USEPA and Iowa DNR. This version of the XPSWMM software is no longer supported by the software vendor. AECOM updated the model to the 2020 version of the XPSWWM software. A future software upgrade will be needed to verify data for the model stays intact and accessible. Task 13 — Miscellaneous Hydraulic Modeling. Perform hydraulic modeling analysis for the sanitary sewer system on an as -needed basis, as requested by Client. Task 14 - Diffuser Performance and Bathymetric Analysis. Provide engineering services, as requested by the client, for wastewater diffuser performance and bathymetric analysis. Task 15 - Update Sanitary Sewer Master Plan. Assist the Client to update the City's Sanitary Sewer Master Plan with past progress and revised future project priorities. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in the original agreement and Supplemental Agreement Nos. 1, 2, 3, 4, 5, 6 and 7. The estimated fee is One Hundred Fifty Thousand Dollars ($150,000.00). Docusign Envelope ID: BED542CA-DF4A-48D8-86C9-1 B8ADDAC3F74 AECOM Page 4 In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated September 8, 2015. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 8 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By edaz %�'� • g-///f-el&er Michelle M. Sweeney, PE, PTOE Associate Vice President CITY OF WATERLOO, IOWA By: DocuSigned by: nittAAlitA, fkotrt Quentin Hart Mayor Date 11/05/2025 Date 12/15/2025 L:\Secure_DCS\Administration\AGREE\SUPPLE\SA8 Waterloo WM Planning and Engineering.doc