Loading...
HomeMy WebLinkAboutAECOM Titus Lift Station - Works In Operation CS1920935 01 - Project No. S109-0352A - 12.15.2025Docusign Envelope ID: 5680716F-291 F-4E89-9BF4-4B91 DA90BCEF WRITTEN NOTICE OF WORKS IN OPERATION, LOAN RECIPIENT ACCEPTANCE & CERTIFICATION OF PROJECT COMPLETION Loan Recipient: City of Waterloo SRF Number(s): CS1920935 01- Project No. 52019-0352A DNR Construction Permit Number(s): 2024-0187S Project Description: Construction of a new lift station at the location of the Titus Lift Station. New lift station is 12' in diameter and 31' deep with a conventional valve vault and flow meter pit. Additionally, 7,970 feet of new force main was constructed. A new generator was installed and the existing lift station and housing structure was demolished. WRITTEN NOTICE OF WORKS IN OPERATION This is to provide written notification of the date that the referenced project funded with State Revolving Fund loan assistance was placed in useful operation or was capable of being placed in useful service. DATE OF INITIATION OF OPERATION: 05/16/2025 PROJECT ACCEPTANCE The above public improvements project has been completed and accepted by the authorized representative of the Loan Recipient below. Representative: Quentin Hart Loan Recipient Title: The Mayor of Waterloo, Iowa Signature: "—Signed by: �4CCC432000D4451... Date: 12/15/2025 CERTIFICATION OF PROJECT COMPLETION In accordance with 567 IAC 64.2(11) or 567 IAC 43.4, I hereby certify that the project approved by the above permit was completed in accordance with approved plans and specifications. Licensed Professional Consulting Engineer Firm: AECOM Project Officer: Ross A. Hill man, Signature: 12/2016 cmc DNR Form 542-0722