HomeMy WebLinkAboutAECOM Titus Lift Station - Works In Operation CS1920935 01 - Project No. S109-0352A - 12.15.2025Docusign Envelope ID: 5680716F-291 F-4E89-9BF4-4B91 DA90BCEF
WRITTEN NOTICE OF WORKS IN OPERATION,
LOAN RECIPIENT ACCEPTANCE &
CERTIFICATION OF PROJECT COMPLETION
Loan Recipient: City of Waterloo
SRF Number(s): CS1920935 01- Project No. 52019-0352A
DNR Construction Permit Number(s): 2024-0187S
Project Description:
Construction of a new lift station at the location of the Titus Lift Station. New lift station is 12' in diameter and
31' deep with a conventional valve vault and flow meter pit. Additionally, 7,970 feet of new force main was
constructed. A new generator was installed and the existing lift station and housing structure was demolished.
WRITTEN NOTICE OF WORKS IN OPERATION
This is to provide written notification of the date that the referenced project funded with State Revolving Fund
loan assistance was placed in useful operation or was capable of being placed in useful service.
DATE OF INITIATION OF OPERATION: 05/16/2025
PROJECT ACCEPTANCE
The above public improvements project has been completed and accepted by the authorized representative of
the Loan Recipient below.
Representative: Quentin Hart
Loan Recipient
Title: The Mayor of Waterloo, Iowa
Signature:
"—Signed by:
�4CCC432000D4451...
Date: 12/15/2025
CERTIFICATION OF PROJECT COMPLETION
In accordance with 567 IAC 64.2(11) or 567 IAC 43.4, I hereby certify that the project approved by the above
permit was completed in accordance with approved plans and specifications.
Licensed Professional Consulting Engineer
Firm: AECOM
Project Officer: Ross A. Hill man,
Signature:
12/2016 cmc
DNR Form 542-0722