Loading...
HomeMy WebLinkAbout2060 CROSSROADS BLVDINVOICE DATE DUE DATE INVOICE # TOTAL DUE 05/20/2025 06/25/2025 2025-00000354 $150.00 Customer #: 3989 CROSSROADS MALL 2060 CROSSROADS BLVD STE 124 WATERLOO, IA 50702 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable 715 Mulberry St WATERLOO, IA 50703 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL INSPECTION - 2060 CROSSROADS BLVD - 5-5-25- LDescription FOR BILLING INQUIRY: (319)291-4323 REINSPECTION 2 Total Price $150.00 CUSTOMER # BILLING DATE DUE DATE INVOICE # CHARGES 3989 05/20/2025 06/25/2025 2025-00000354 $150.00 Less Prepayment Total Due —> City of Waterloo $0.00 $150.00 Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of Administrative Services Offset Program if not paid in full within ninety days. Waterloo Fire Rescue Inspection Report Crossroads Mall - 2060 Crossroads BLVD, BLDG 2060 Crossroads Blvd, Waterloo IA 50702-4424 INSPECTION DETAILS Inspection Date 05/05/2025 Inspection Type Complaint REINSPECTION ) 'ag 425 E. 3rd Street Inspection Number 16292-R3 Lead Inspector Shift Station Unit JEREMIAH VANDYKE NIA NIA NIA Other Inspectors BROCK WELIVER SUMMARY OF INSPECTION O 0 Passed codes NEXT STEPS 11 Failed codes Please direct questions about your Inspection to: JEREMIAH VANDYKE jeremiah.vandyke@waterloo-ia.org FEE Invoice Date NIA Invoice Number N/A Inspection Fee $150.00 Date Paid Amount Paid GENERAL NOTES JEREMIAH VANDYKE - 0312812025 @ 20:31 Last fire report completed 10/25/2024. JEREMIAH VANDYKE - 03/2812025 @ 20:31 Check Number NIA Reinspection Date 06104/2025 Transaction Number NIA Re -inspection date MARCH 13th. Normal operating hours for inspections & re -inspections are Monday A€" Friday, 8:00 a.m. a€" 5:00 p.m. If the automatically generated re -inspection date lands on a weekend, the re -inspection will typically be performed the following Monday or Tuesday. If all corrections are made before the 30 days, you can call to set up an earlier re -inspection. *****Re inspection fees may be assessed for subsequent re - inspections. Re -inspection fees start at $100, then $150, and $200 for all subsequent re-inspections.- JEREMIAH VANDYKE - 03/28/2025 @ 20:31 Lt. Van Dyke - jeremiah.vandyke@waterloo-ia.org A€" Work: 319-291-4460 - Cell: 319-883-1615 JEREMIAH VANDYKE - 03/28/2025 @ 20:31 No inspection fee. RE INSPECT DATE MARCH 13th. JEREMIAH VANDYKE - 03/28/2025 @ 20:31 Met with Mall Manager Keri and Brian Miller of BH Sprinkler. All occupied tenant space is covered under active sprinkler system. Brian is currently working on Sear Auto, Sears store, Gordmans, and at Home store. JEREMIAH VANDYKE - 03/28/2025 @ 20:31 Discussed boiler situation and moving forward with repairs. Discussed needing work order and date on when the boiler will be in operation. Work being done by Brekke contractor. GENERATED ON 5/5/25, 3:51 PM 1 OF 4 JEREMIAH VANDYKE - 03128/2025 @ 20:31 Mall still on fire watch until all sprinkler systems in service AND need to address past dues for FIRE ALARM system. JEREMIAH VANDYKE - 03/28/2025 @ 20:31 No re inspect fee at this time. JEREMIAH VANDYKE - 03128/2025 @ 20:31 rom: Keri Bentley Sent: Monday, March 24, 2025 1:52 PM To: Jeremiah VanDyke Subject: RE: Inspection Report for your occupancy CAUTION: This email originated from outside the City of Waterloo email system. Do not click links or open unexpected attachments unless you recognize the sender and know the content is safe. Good afternoon, I thought la€'^'d send you a quick update as of today. Sears Auto - sprinkler system operating Sears/Gordmans - Blackhawk Sprinklers was here Thursday and gave us a quote of $40k to repair all of the heads that broke in there. My owners havens€'V't given the approval on that yet. At Home - Blackhawk Sprinklers will finish this space when they do Sears/Gordmans. Alarm inspections - Hawkeye Alarms will do the inspection on all three of these locations above, as soon as all the repairs have been made. Boiler a€" I£r"ve attached the invoices you requested for the Brecke repairs to the tubes. We are still finding leaks when filling the boiler, once we have all the leaks located and isolated, the pressure should be where it needs to be and the boiler will be running. Thanks, Keri Bentley I Property Manager Crossroads Mall 2060 Crossroads Blvd, Waterloo, IA 50702 W: (319) 234-1788 www.shoperossroadscenter.com JEREMIAH VANDYKE - 03/28/2025 @ 20:31 Re inspect fee: $100.00. (To be mailed out via snail mail by the City.) JEREMIAH VANDYKE - 05105/2025 @ 20:50 Email from Keri Bentley: Primary Systems is here this morning for our Fire Alarm inspection. This does not include the At Home, Sears and Gordmans. I am waiting for approval to schedule those as well as all of the sprinkler system repairs. As far as the boiler, we wona€'"t be needing heat now through the summer. We just replaced a backflow (invoice attached for documentation) and will continue to make any necessary repairs so its€'"'s up and running for this fall/winter, Thanks, Keri Bentley I Property Manager Crossroads Mall 2060 Crossroads Blvd, Waterloo, IA 50702 W: (319) 234-1788 www.shoperossroadscenter.com JEREMIAH VANDYKE - 05/05/2025 @ 20:50 Re inspect fee: $150.00. (To be mailed out via snail mail by the City.) SIGNATURES Contact signature Inspector signature Keri Bentley CHECKLISTS Reinspection No signature Person not available for signature Date: JEREMIAH VANDYKE Status Code Description Fail 114.1.1 0 Structures or existing equipment that are or hereafter become Location: Entire mall building. unsafe, insanitary or deficient because of inadequate means of egress, inadequate light and ventilation, or that constitute a fire hazard, are otherwise dangerous to human life or the public welfare, or involve illegal or improper occupancy or inadequate maintenance, shall be deemed an unsafe condition. Unsafe structures shall be taken down and 05105/2025 GENERATED ON 5/5/25, 3:51 PM 2 OF 4 Fail O Fail Fail Fail Fail removed or made safe, as the fire code official deems necessary and as provided for in this section. A vacant structure that is not secured against unauthorized entry as required by Section 311 shall be deemed unsafe. 704.1 Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floor/ceiling assemblies and roof or roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. 9 Upon visual inspection does situation match the complaints concerns? Fail to indicate that the complaint was found to be valid and use the codes tab to document what violations were noted. If no violations are noted, pass and use the notes section to indicate that no evidence of the complaints concerns were found. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the international Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design Location: Entire mall including Sear Auto. Comments: Multiple ceiling tiles are missing and need to be replaced. Location: Entire mall. Comments: Called for a complaint of no heat in the Mall. I stopped at the mall 2/24/2025 and talked with the Mall Manager Keri Bentley. She confirmed that the boiler was not working and was supposedly getting fixed. She also confirmed that they are on fire watch for the mall and that they had multiple broken sprinkler lines that were turned off. She states that she has there are bids out to get them fixed, but nothing has been approved by the owner for the sprinkler system and the boiler. I talks with the workers at Gino's pizza and China Express that the temperatures were down to 36F and they were keeping warm with space heaters or staying near the cooking appliances. Location: 2060 Crossroads Blvd Comments: 12 open sprinkler deficiences according to Compliance Engine. Location: Former Sears Comments: *Fire alarm 338 past due. *Sprinkler system has 10 open deficiencies according to compliance engine. Location: Former Younkers Comments: *Sprinkler system has 2 open deficiencies according to compliance engine. GENERATED ON 5/5/25, 3:51 PM 3 OF 4 Fail l^J Fail Fail Fail Fail option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. 901.4.1 Fire protection and life safety systems required by this code or the International Building Code shall be installed, repaired, operated, tested and maintained in accordance with this code. A fire protection or life safety system for which a design option, exception or reduction to the provisions of this code or the International Building Code has been granted shall be considered to be a required system. Location: Former Gordmans Comments: Fire alarm inspection is 341 days past due. *Sprinkler system has 12 open deficiencies according to compliance engine. Location: Former At Home Comments: Fire alarm inspection is 245 days past due. Location: China Express Comments: Commercial Kitchen Exhaust Cleaning is 64 days past due with 1 open deficiency according to compliance engine. Location: Gino's Pizza Comments: Commercial kitchen exhaust cleaning 20 days past due according to Compliance Engine. Location: Former Sears Auto. 6002 Crossroads Blvd Comments: Fire alarm system inspection is 338 days past due. Fire sprinkler system has 7 open deficiencies according to compliance engine. GENERATED ON 5/5/25, 3:51 PM 4 OF 4