HomeMy WebLinkAbout2060 CROSSROADS BLVDINVOICE DATE
DUE DATE
INVOICE #
TOTAL DUE
06/12/2025
07/15/2025
2025-00000415
$200.00
Customer #: 3989
CROSSROADS MALL
2060 CROSSROADS BLVD STE 124
WATERLOO, IA 50702
Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
715 Mulberry St
WATERLOO, IA 50703
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION - 2060 CROSSROADS BLVD - 6-12-25
FOR BILLING INQUIRY: (319)291-4323
Description
Total Price
REINSPECTION 3
$200.00
CUSTOMER #
BILLING DATE
DUE DATE
INVOICE #
CHARGES
3989
06/12/2025
07/15/2025
2025-00000415
$200.00
Less Prepayment
Total Due -->
City of Waterloo
$0.00
8200.00
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five Percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Coiiections ( f
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
Waterloo Fire Rescue
Crossroads Mall - 2060 Crossroads BLVD, LDG 2060 Crossroads Blvd, Waterloo IA
50702-4424
INSPECTION DETAILS
425 E. 3rd Street
/ Inspection Date Inspection Type inspection Number
06112/2025 . 1 Complaint [ REINSPECTION ) 16292-R4
Lead Inspector
�EREMIAH V DYKE
Other Inspectors
BROCK WELIVER
Shift Station Unit
NIA N/A NIA
SUMMARY OF INSPECTION
0 0
Passed codes
NEXT STEPS
0 11
Failed codes
Please direct questions about your Inspection to:
JEREMIAH VANDYKE
jeremiah.vandyke@waterloo-ia.org
GENERAL NOTES
Reinspection Date
07/12/2025
JEREMIAH VANDYKE - 06/12/2025 @ 12:34
Email from Keri: Good morning! These have not been addressed yet. Thanks, Keri Bentley I Property Manager Crossroads Mall 2060 Crossroads Blvd,
Waterloo, IA 50702 W: (319) 234-1788 www.shoperossroadscenter.com www.NamdarRealtyGroup.com The contents and any attachments of this
electronic mail message are confidential and intended only for the named addressees. Dissemination, forwarding, publication or other use of the
message or attachments by any unauthorized person is strictly prohibited. Unless stated to the contrary, any opinions expressed in this message are
personal and may not be attributed to Namdar Realty Group. Internet a -mails are not necessarily secure. Namdar Realty Group does not accept
responsibility for changes made to this message after it was sent. From: Jeremiah VanDyke <Jeremiah.VanDyke@WATERLOO-IA.ORG> Sent: Monday,
June 09, 2025 9:37 AM To: Keri Bentley <keri@waterloocenter.com> Subject: Re: Inspection Report for your occupancy
6/12/2025 @ 12:36
o be mailed out via snail mail by the City)
JEREMI VANDYK t 5/05/2025 @ 15:50
Last fire report completed 10/25/2024.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Re -inspection date MARCH 13th. Normal operating hours for inspections & re -inspections are Monday 5€" Friday, 8:00 a.m. fie" 5:00 p.m. If the
automatically generated re -inspection date lands on a weekend, the re -inspection will typically be performed the following Monday or Tuesday. If all
corrections are made before the 30 days, you can call to set up an earlier re -inspection. *****Re inspection fees may be assessed for subsequent re -
inspections. Re -inspection fees start at $100, then $150, and $200 for all subsequent re-inspections.-
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Lt. Van Dyke - jeremiah.vandyke@waterloo-ia.org a€" Work: 319-291-4460 - Cell: 319-883-1615
JEREMIAH VANDYKE - 05/0512025 @ 15:50
No inspection fee. RE INSPECT DATE MARCH 13th.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
GENERATED ON 6/12/25, 12:38 PM 1 OF 5
Met with Mall Manager Keri and Brian Miller of BH Sprinkler. All occupied tenant space is covered under active sprinkler system. Brian is currently
working on Sear Auto, Sears store, Gordmans, and at Home store.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Discussed boiler situation and moving forward with repairs. Discussed needing work order and date on when the boiler will be in operation. Work being
done by Brekke contractor.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Mall still on fire watch until all sprinkler systems in service AND need to address past dues for FIRE ALARM system.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
No re inspect fee at this time.
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
rom: Keri Bentley Sent: Monday, March 24, 2025 1:52 PM To: Jeremiah VanDyke Subject: RE: Inspection Report for your occupancy CAUTION: This email
originated from outside the City of Waterloo email system. Do not click links or open unexpected attachments unless you recognize the sender and know
the content is safe. Good afternoon, I thought Ia€""d send you a quick update as of today. Sears Auto - sprinkler system operating Sears/Gordmans -
Blackhawk Sprinklers was here Thursday and gave us a quote of $40k to repair all of the heads that broke in there. My owners havens€TM't given the
approval on that yet. At Home - Blackhawk Sprinklers will finish this space when they do SearslGordmans. Alarm inspections - Hawkeye Alarms will do
the inspection on all three of these locations above, as soon as all the repairs have been made. Boiler a€" la€""ve attached the invoices you requested for
the Brecke repairs to the tubes. We are still finding leaks when filling the boiler, once we have all the leaks located and isolated, the pressure should be
where it needs to be and the boiler will be running. Thanks, Keri Bentley j Property Manager Crossroads Mall 2060 Crossroads Blvd, Waterloo, IA 50702
W: (319) 234-1788 www.shoperossroadscenter.com
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Re inspect fee: $100.00. (To be mailed out via snail mail by the City.)
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Email from Keri Bentley: Primary Systems is here this morning for our Fire Alarm inspection. This does not include the At Home, Sears and Gordmans.
am waiting for approval to schedule those as well as all of the sprinkler system repairs. As far as the boiler, we wona€T"t be needing heat now through
the summer. We just replaced a backflow (invoice attached for documentation) and will continue to make any necessary repairs so its€'"s up and running
for this fall/winter. Thanks, Keri Bentley j Property Manager Crossroads Mall 2060 Crossroads Blvd, Waterloo, IA 50702 W: (319) 234-1788
www.shoperossroadscenter.com
JEREMIAH VANDYKE - 05/05/2025 @ 15:50
Re inspect fee: $150.00. (To be mailed out via snail mail by the City.)
SIGNATURES
Contact signature
No signature
NA
Keri Bentley
CHECKLISTS
Inspector signature
Date: JEREMIAH VANDYKE 06/12/2025
GENERATED ON 6/12/25, 12:38 PM 2 OF 5
Reinspection
status Code
Fail
Fail
Fail
Fail
114.1.1
Structures or existing equipment that are or hereafter become
unsafe, insanitary or deficient because of inadequate means
of egress, inadequate light and ventilation, or that constitute
a fire hazard, are otherwise dangerous to human life or the
public welfare, or involve illegal or improper occupancy or
inadequate maintenance, shall be deemed an unsafe
condition. Unsafe structures shall be taken down and
removed or made safe, as the fire code official deems
necessary and as provided for in this section. A vacant
structure that is not secured against unauthorized entry as
required by Section 311 shall be deemed unsafe.
704.1
Where required when the building was originally constructed,
materials and systems used to protect joints and voids in the
following locations shall be maintained. The materials and
systems shall be securely attached to or bonded to the
adjacent construction, without openings visible through the
construction. 1.Joints in or between fire -resistance -rated
walls, floors or floor/ceiling assemblies and roof or
roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at
the intersection of a horizontal floor assembly and an exterior
curtain wall. 4.Voids at the intersection of a horizontal smoke
barrier and an exterior curtain wall. 5.Voids at the intersection
of a nonfire-resistance-rated floor assembly and an exterior
curtain wall. 6.Voids at the intersection of a vertical fire
barrier and an exterior curtain wall. 7.Voids at the intersection
of a vertical fire barrier and a nonfire-resistance-rated roof
assembly. Unprotected joints and voids do not need to be
protected where such joints and voids were not required to
be protected when the building was originally
constructed. Where the system design number is known, the
system shall be inspected to the listing criteria and
manufacturer's installation instructions.
9
Upon visual inspection does situation match the complaints
concerns? Fail to indicate that the complaint was found to be
valid and use the codes tab to document what violations were
noted. If no violations are noted, pass and use the notes
section to indicate that no evidence of the complaints
concerns were found.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
Description
Location: Entire mall building.
Location: Entire mall including Sear Auto.
Comments: Multiple ceiling tiles are missing and need to be replaced.
Location: Entire mall.
Comments: Called for a complaint of no heat in the Mall. I stopped at
the mall 2/24/2025 and talked with the Mall Manager Keri Bentley. She
confirmed that the boiler was not working and was supposedly
getting fixed. She also confirmed that they are on fire watch for the
mall and that they had multiple broken sprinkler lines that were
turned off. She states that she has there are bids out to get them
fixed, but nothing has been approved by the owner for the sprinkler
system and the boiler. I talks with the workers at Gino's pizza and
China Express that the temperatures were down to 36F and they were
keeping warm with space heaters or staying near the cooking
appliances.
Location: 2060 Crossroads Blvd
Comments: 12 open sprinkler deficiences according to Compliance
Engine.
GENERATED ON 6/12/25, 12:38 PM 3 OF 5
Fail
Fail
Fail
Fail
Fail
o
Fail
0
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
901.4.1
Fire protection and life safety systems required by this code
or the International Building Code shall be installed, repaired,
operated, tested and maintained in accordance with this
code. A fire protection or life safety system for which a design
option, exception or reduction to the provisions of this code
or the International Building Code has been granted shall be
considered to be a required system.
Location: Former Sears
Comments: *Fire alarm 338 past due. *Sprinkler system has 10 open
deficiencies according to compliance engine.
Location: Former Younkers
Comments: *Sprinkler system has 2 open deficiencies according to
compliance engine.
Location: Former Gordmans
Comments: Fire alarm inspection is 341 days past due. *Sprinkler
system has 12 open deficiencies according to compliance engine.
Location: Former At Home
Comments: Fire alarm inspection is 245 days past due.
Location: China Express
Comments: Commercial Kitchen Exhaust Cleaning is 64 days past
due with 1 open deficiency according to compliance engine.
Location: Gino's Pizza
Comments: Commercial kitchen exhaust cleaning 20 days past due
according to Compliance Engine.
Location: Former Sears Auto. 6002 Crossroads Blvd
Comments: Fire alarm system inspection is 338 days past due. Fire
sprinkler system has 7 open deficiencies according to compliance
engine.
GENERATED ON 6/12/25, 12:38 PM
4 OF 5
Statement of Fees
FEE
Invoice Date Inspection Fee
NIA $200.00
Invoice Number
NIA
Date Paid Amount Paid
Check Number Transaction Number
N/A N/A
GENERATED ON 6/12/25, 12:38 PM