HomeMy WebLinkAbout250 ANSBOROUGH AVEINVOICE DATE
DUE DATE
INVOICE #
TOTAL DUE
02/06/2025
03/10/2025
2025-00000259
$80.00
Customer #: 20789
CATTLE CONGRESS PAVILION
257 ANSBOROUGH AV
WATERLOO, IA 50701
Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
715 Mulberry St
WATERLOO, IA 50703
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION - 250 ANSBOROUGH AVE - 2-3-25
FOR BILLING INQUIRY: (319)291-4323
L Description
INSPECTION 2,000
OCCUPANCY FEE
Total Price j
$70.00
$10.00
CUSTOMER #
20789
BILLING DATE
02/06/2025
DUE DATE
03/10/2025
INVOICE #
2025-00000259
CHARGES
$80.00
Less Prepayment
Total Due -->
City of Waterloo
$0.00
$80.00
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
WATERLOO FIRE RESCUE Il
INSPECTION REPORT
NATIONAL CATTLE CONGRESS PAVILUON, ISO ANSBOROUGH AVE, BLDG 250 ANSBOROUGH
AVE, WATERLOO IA S0701
DETAILS
Inspection Date: 02/03/2025;j Inspection Type: Annual Inspection (1Yr) ; Inspection Number: 12859 i Shift: N/A } Station: N/A
Unit: N/A I Lead InspectorJEFF SIEBEL I Other Inspectors: N/A
VIOLATIONS AND COMPLIANCES
Showing only violations and images for this inspection. Please reach out to the lead inspector for more details.
Resolved Violations: 0 ( Passed Codes: 38 ( Violations: 2 ( N/A Codes: 33
STATUS CODE DESCRIPTION
FAIL
2015 IFC - Fire alarm testing Is the fire alarm system powered, operational and displaying normal operation
and maintenance (no troubles, supervisory, or alarms)?
Location: Fire Alarm Panel
Original Comment: Contractor must obtain final fire alarm inspection. Faults on
panel must be corrected.
FAIL 903.3.1 - Standards. Sprinkler systems shall be designed and installed in accordance with Section
903.3.1.1, unless otherwise permitted by Sections 903.3.1.2 and 903.3.1.3 and
other chapters of this code, as applicable.
Location: Fire Sprinkler Final Inspection
Original Comment: Contractor must Obtain final fire sprinkler inspection
GENERAL NOTES
JEFF SIEBEL-02/04/2025 @ 13:48 annual inspection $80
JEFF SIEBEL - 02/04/2025 @ 13:50 Dryer vent cleaning by Chuck 12/28/24
Printed on 02/04/2025 @ 13:52
Page 1 of 2
REINSPECTION DATE
03/21/2025
CONTACT SIGNATURE
Jim Koch
Signed on: 02/04/2025 @ 13:50
INSPECTOR SIGNATURE
JEFF SIEBEL
Signed on: 02/04/2025 @ 13:50
QUESTIONS ABOUT YOUR INSPECTION?
JEFF SIEBEL
Jeff.Siebel@Waterloo-ia.org
3192301224
Printed on 02/04/2025 @ 13:52
Page 2 of 2