Loading...
HomeMy WebLinkAbout2034 LA PORTE RDINVOICE DATE DUE DATE INVOICE # TOTAL DUE 11/24/2025 12/29/2025 2026-00000232 $200.00 Customer #: 12855 HAMPTON INN 2034 LA PORTE RD WATERLOO, IA 50702 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable 715 Mulberry St WATERLOO, IA 50703 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL FIRE INSPECTION-2034 LA PORTE RD-11/24/2025 FOR BILLING INQUIRY: (319)291-4323 Description REINSPECTION 3 Total Price $200.00 CUSTOMER # BILLING DATE DUE DATE INVOICE # CHARGES 12855 11/24/2025 12/29/2025 2026-00000232 $200.00 Less Prepayment Total Due —> City of Waterloo $0.00 $200.00 Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of Administrative Services Offset Program if not paid in full within ninety days. Waterloo Fire Rescue Inspection Report Hampton Inn & Suites - 2034 La Porte RD, BLDG 2034 La Porte Rd, Waterloo IA 50702 INSPECTION DETAILS Inspection Date 11/24/2025 Lead lnspector BRAD BALDWIN Inspection Type Annual Inspection (1Yr) �REINSPECTION Other inspectors N/A 425 E. 3rd Street Inspection Number 13671-R11 Shift Station Unit NIA N/A NIA SUMMARY OF INSPECTION O 0 o 1 8 Passed codes Resolved violations Failed codes NEXT STEPS Please direct questions about your Inspection to: BRAD BALDWIN brad.baldwin@waterloo-ia.org, 3192914319 GENERAL NOTES BRAD BALDWIN -10/27/2025 @ 07:40 $200 re -inspection fee, failure to correct deficiencies as of 8/22/25. BRAD BALDWIN - 10/27/2025 @ 07:40 $200 Re -inspection fee for failure to correct violations on 6/23/25 BRAD BALDWIN - 10/27/2025 @ 07:40 Provide corrections to avoid re -inspection fees BRAD BALDWIN - 10/27/2025 @ 07:40 Annual inspection $235 BRAD BALDWIN - 10/27/2025 @ 07:40 Provide corrections to avoid re -inspection fees. BRAD BALDWIN - 10/27/2025 @ 07:40 Re -inspection fee $100 BRAD BALDWIN - 10/27/2025 @ 07:40 Corrections not made on fire sprinkler, standpipe, or fire alarm and no date for completion of fire door certifications. BRAD BALDWIN -10/27/2025 @ 07:40 Re -inspection fee $150 BRAD BALDWIN - 10/27/2025 @ 07:40 Called Mitch on 4/17/25 and he stated no improvement. BRAD BALDWIN - 10/27/2025 @ 07:40 Re -inspection fee $200 Reinspection Date 12/17/2025 GENERATED ON 11/24/25, 7:42 AM 1 OF 7 BRAD BALDWIN - 1012712025 @ 07:40 annual inspection $200 BRAD BALDWIN - 10/27/2025 @ 07:40 We are recommending denial of alcohol license to the City Council because of lack of progress on required certification of guest room fire doors that were altered during construction. BRAD BALDWIN - 1012712025 @ 07:40 $200 Re -inspection fee, failure to complete corrections as of 7122125 BRAD BALDWIN - 1012712025 @ 07:40 $200 re -inspection fee, failure to correct deficiencies or provide plan to make corrections as of 10/3/25. BRAD BALDWIN - 10127/2025 @ 07:40 Withholding re -inspection fee today due to progress made 10124125 BRAD BALDWIN - 11124/2025 @ 07:38 $200 re -inspection fee, failure to complete corrections as of 11/24125. Discussion with Cayenne on site (11120125) regarding lack of fire doors re- certification report. SIGNATURES Contact signature Inspector signature No signature Report completed post inspection Cayenne Adams - Manager (2025) CHECKLISTS Rt Date: BRAD BALDWIN 1112412025 GENERATED ON 11/24/25, 7:42 AM 2 OF 7 Reinspection Status Code Fail Fail Fail 102.4 - Application of building code. The design and construction of new structures shall comply with the International Building Code , and any alterations, additions, changes in use or changes in structures required by this code, which are within the scope of the International Building Code , shall be made in accordance therewith. 704.1- Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floor/ceiling assemblies and roof or roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. 704.1- Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floorlceiling assemblies and roof or roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. Description Location: Entire buiding Comments: Obtain permits and inspections for all work concerning fire door repair, replacement smoke seals, all hardware replaced. Please see original attached email with codes concerning information requiered for fire door hardware. Please contact Building Official Greg Ahlhelm with questions. 319-291-4319 Location: Entire second floor guest fire doors Comments: Install approved smoke seal in all fire door openings that has been removed including stair doors and utility areas. Check all other floors Location: Entire Second Floor Comments: verify all removed smoke seals have been replaced on second floor. Also 4th floor and all other smoke sweeps added to bottom of doors must be verified as listed for fire doors and inspected. GENERATED ON 11/24/25, 7:42 AM 3 OF 7 Fail 704.1- Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floorlceiling assemblies and roof or roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. Location: obtain permit and inspections GENERATED ON 11/24/25, 7:42 AM 4 OF 7 Fail 704.1- Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floor/ceiling assemblies and roof or roof/ceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. Location: Entire 4th Floor Fire Doors Comments: Repair or replace fire doors that are improperly installed. Doors must seal all sides including top and botom to prevent smokelfire from inflitrating fire rated coridoor. GENERATED ON 11/24/25, 7:42 AM 5 OF 7 Fail 704.1 - Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids in the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floorlceiling assemblies and roof or rooflceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. Fail 704.1 - Maintaining protection. Where required when the building was originally constructed, materials and systems used to protect joints and voids ih the following locations shall be maintained. The materials and systems shall be securely attached to or bonded to the adjacent construction, without openings visible through the construction. 1.Joints in or between fire -resistance -rated walls, floors or floorlceiling assemblies and roof or rooflceiling assemblies. 2.Joints in smoke barriers. 3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall. 4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall. 5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall. 6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall. 7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed. Where the system design number is known, the system shall be inspected to the listing criteria and manufacturer's installation instructions. Fail 705.2.4 - Door operation. Swinging fire doors shall close from the full -open position and latch automatically. Location: Stairway Fire Door by room 330 Comments: Repair fire door. There is a gap at bottom of door. Must completely seal Location: 1st floor west stair tower door Comments: Fire rated door altered by cutting bottom of door as shown in picture. Either replace door by obtaining permit and inspection or obtain architect to review door, report from architect shall be sent to inspector. Additional comments: No progress made as of 11/20125 Location: 1st floor hallway men's bathroom Comments: Door failed to shut and latch from full open position. Bottom of door drags and sticks on ground. Additional comments: No progress made as of 11/20125 GENERATED ON 11/24/25, 7:42 AM 6 OF 7 Statement of Fees FEE Invoice Date Inspection Fee Date Paid Amount Paid NIA $200.00 Invoice Number N/A Check Number Transaction Number NIA NIA GENERATED ON 11/24/25, 7:42 AM 7 OF 7