HomeMy WebLinkAbout2046 SOVIA DRINVOICE DATE
DUE DATE
INVOICE #
TOTAL DUE
10/22/2025
01/09/2026
2026-00000166
$100.00
Customer #: 23043
FREDDY'S
2046 SOVIA DR
WATERLOO, IA 50702
Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
715 Mulberry St
WATERLOO, IA 50703
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION - 2046 SOVIA DR - 10-10-25
FOR BILLING INQUIRY: (319)291-4323
Description
Total Price
REINSPECTION 1
$100.00
CUSTOMER #
BILLING DATE
DUE DATE
INVOICE #
CHARGES
23043
10/22/2025
01/09/2026
2026-00000166
$100.00
Less Prepayment
Total Due —�
City of Waterloo
$0.00
$100.00
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
Waterloo Fire Rescue
Inspection Report
Freddy's - 2046 Sovia DR, BLDG 2046 Sovia Dr, Waterloo IA 50702
INSPECTION DETAILS
Inspection Date Inspection Type
10/10/2025 Annual Inspection (1Yr) REINSPECTION
Lead Inspector
BRAD BALDWIN
Other Inspectors
N/A
425 E. 3rd Street
Inspection Number
1119-R2
Shift Station Unit
NIA N/A N/A
SUMMARY OF INSPECTION
0 0 0 5 0 4
Passed codes
NEXT STEPS
Resolved violations Failed codes
Please direct questions about your Inspection to:
BRAD BALDWIN
brad.baldwin@waterloo-ia.org, 3192914319
GENERAL NOTES
BRAD BALDWIN - 09/12/2025 @ 12:25
$80 annual inspection fee
BRAD BALDWIN - 09/12/2025 @ 12:25
Fire extinguishers due annually serviced by March 2026
BRAD BALDWIN - 09/12/2025 @ 12:25
• Commercial Fire Inspector - brad.baldwin@waterloo-ia.org - Work: 319-291-4319 (#5) - Cell: 319-230-1224
Reinspection Date
11/14/2025
BRAD BALDWIN - 09112/2025 @ 12:25
• If all corrections are made before the scheduled re -inspection date, you can call to set up an earlier re -inspection. Normal operating hours for
inspections & re -inspections are Monday - Friday, 9:00 a.m. - 4:00 p.m. *****Re inspection fees may be assessed for subsequent re -inspections. Re -
inspection fees start at $100, then $150, and $200 for all subsequent re -inspections.
BRAD BALDWIN - 09/12/2025 @ 12:25
Complete corrections of open violations to avoid re -inspection fees.
BRAD BALDWIN -10/10/2025 @ 13:43
$100 re -inspection fee, failure to make corrections as of 10/10/25
SIGNATURES
Contact signature Inspector signature
No signature
Report completed post inspection
Yolanza Chambers (2025 GM)
Rr
Date: BRAD BALDWIN 10/10/2025
GENERATED ON 10/10/25, 1:44 PM 1 OF 5
CHECKLISTS
GENERATED ON 10/10/25, 1:44 PM
2 OF 5
Reinspection
Status Code
Fail
Fail
509.2 - Equipment access.
Approved access shall be provided and maintained for all fire
protection system equipment to permit immediate safe
operation and maintenance of such equipment. Storage, trash
and other materials or objects shall not be placed or kept in
such a manner that would prevent such equipment from
being readily accessible.
603.2 - Abatement of unsafe conditions and electrical
hazards.
Identified electrical hazards shall be abated. Identified
hazardous electrical conditions in permanent wiring shall be
brought to the attention of the responsible code official.
Electrical wiring, devices, appliances and other equipment
that is modified or damaged and constitutes Conditions that
constitute an electrical shock or fire hazard shall be abated
not be used.
Description
Location: Kitchen sprinkler system
Comments: Remove obstructions and maintain to clear path of
access to sprinkler system.
Additional comments: Remove obstructions immediately
Location: West exterior light fixture
Comments: Repair or replace damaged light fixture exposing wires.
GENERATED ON 10/10/25, 1:44 PM
3 OF 5
Fail 603.4 - Working space and clearancesclearance.
A working space of not Working space around electrical
equipment shall be provided in accordance with Section
110.26 of NFPA 70 for electrical equipment rated 1,000 volts or
less, and Section 110.33 of NFPA 70 for electrical equipment
rated over 1,000 volts. The minimum required working space
shall be not less than 30 inches (762 mm) in width, 36 inches
(914 mm) in depth and 78 inches (1981 mm) in height shall be
providedin front of electrical service equipment. Where the
electrical service equipment is wider than 30 inches (762
mm), the minimum working space shall be not less than the
width of the equipment. Storage of materials shall not be
located within the designated working space. Exceptions: 1.
Where other dimensions are required or allowed by NFPA 70.
2. Access openings into attics or under -floor areas that
provide a minimum clear opening of 22 inches (559 mm) by 30
inches (762 mm).
Additional Codes
Status
Fail
606.3.3.1 - Inspection.
Hoods, grease -removal devices, fans, ducts and other
appurtenances shall be inspected at intervals specified in
Table 606.3.3.1 or as approved by the fire code official.
Inspections shall be completed by qualified individuals.
Location: Kitchen electric panels
Comments: Maintain 36" clearance in front of panel and clear path for
access.
Description
Location: Kitchen hood suppression system
Comments: Provide suppression system inspection report with any
deficiencies corrected. Contractor must upload report to Compliance
Engine. Currently 10 days past due as of 10/10125
GENERATED ON 10/10/25, 1:44 PM
4 OF 5
=Q
FEE
Statement of Fees
Invoice Date Inspection Fee Date Paid Amount Paid
NIA $100.00
Invoice Number
NIA
Check Number Transaction Number
NIA NIA
GENERATED ON 10/10/25, 1:44 PM 5 OF 5