Loading...
HomeMy WebLinkAboutEntrust CO 2026-0040_Waterloo_Broadband_ 2.16.2026Docusign Envelope ID: D7FE2D5B-4323-4C36-AE54-FFD529DE157B Change Order Request Change •rter ype Retainage CITY OF �J�TERLOO COMMUNICATIONS E Community e�D sign/Engineering of Opportunity Will Be Subject To The Withhoklings t ntract Sections 6.2(f)(i) and_ib and Release Set Forth In The No Change Order Name: CR-2026-0040 • rder Cos • $232,440.00 ITG equest Date: 2/3/2026 Construction Contractor Name (Attn) Michael Regan PM Broadband Implementation Requested By: Client/Owner Magellan Project Manager: Client/Owner (Attn) City of Waterloo/Waterloo Fiber/Eric Lage st Sign -Off Clayton Johnston VP of Construction ange Ret- - Description of Change (include location) The following Change Order has been created to account for additional construction labor associated with rock boring along Westfield Ave and West Commercial St in LCP 048 / Task Order 13. Reason for Change The contractor, ITG, completed 4,768 both FTTH & BB infrastructure (BB = completed. However, the Bill of Materials with a unit rate of $48.75 per linear foot. work was performed, it was not included submitted prior to construction. At the have been to engage the Waterloo team, steps did not occur. This scope of work BoM. Breakdown of Costs: feet of bore in this area and the work involved rock. This bore covered 2,450 feet / FTTH = 2,318 feet). Entrust verified the that the bore was (BoM) line item for rock bore adder shows a zero -unit quantity This means that while rock conditions were encountered and the in the approved scope nor was a change request discussed or point when rock was identified or anticipated, the expectation would review the scope impact, and revise the BoM. Unfortunately, those will need the unit quantities of 4,768 feet for rock adder added to the $113,002.50 BB = 132ft x $48.75/ft = $6,435.00 BB SHARED = 2,318ft x $48.75/ft = $113,002.50 FTTP SHARED = 2,318ft x $48.75/ft - Labor pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Waterloo associated with Contract # 1088 Material Submittals/ Specifications Docusign Envelope ID: D7FE2D5B-4323-4C36-AE54-FFD529DE157B Itemized Breakdown of Work Quantity Unit Price Location Work Order # Description Amount 11.1 Underground - Buried Labor Bore Rock Adder-->[LF] 4,768 $ 48.75 $ 232,440.00 CR Labor Subtotal $ 232,440.00 Materials CR Materials Subtotal $ - """ TOTAL CR COST $ 232,440. s . Docusign Envelope ID: D7FE2D5B-4323-4C36-AE54-FFD529DE157B Magellan Sign -Off Print Name / Title: Clayton Johnston VP of Construction Signature: Date: 2/2/2026 7Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Charles Smith 2/3/2026 Regional Managed Print Name / Title: Signature: Date: Dave Boesen, Mayor "—Signed by: R M. bbt -StAn, '-393E8397B3D3421... 2/16/2026 **End**