Loading...
HomeMy WebLinkAboutITG - CR2026-0045-Waterloo Broadband Change Order Request - 1.21.26 Change Order Request Change Order TypeDesign/Engineering Will Be Subject To The Withholdings and Release Set Forth In The Retainage No Contract Sections 6.2(f)(i) and (ii) Change Order Name: Change Order Cost:($38,607.87) CR-2026-0045 Construction Contractor Name (Attn)2/3/2026 Request Date: ITG Michael Regan Magellan Project Manager: Requested By:Client/Owner PM Broadband Implementation Clayton Johnston Client/Owner (Attn) Entrust Sign-Off Waterloo Fiber/Eric Lage VP of Construction Change Request Overview The following Change Order has been created to account for a deduction in construction labor and materials Description of Change (include location) associated with the design area near Fletcher Ave, Highway 218 and Westfield Ave in Task Order 15 / LCP 059. Due to Occupancy Fees (~$30,000 Year 1 with an increase of 5-10% each year thereafter) associated with DOT Reason for Change permit UG00272, the decision was made to remove 5 businesses in this area from the FTTH design. Construction to these businesses may be considered as part of a future project, timeframe unknown. Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Material Submittals/ Specifications Waterloo associated with Contract # 1088 Itemized Breakdown of Work Location DescriptionQuantityUnit PriceAmount Work Order # Labor Directional Bore (0) 1", (0) 2", (2) 1.25" -->\[LF\] Underground - Buried Labor161 $ 13.75 $ 2,213.75 Directional Bore (1) 1", (0) 2", (2) 1.25" -->\[LF\] -161 $ 15.85 $ (2,551.85) Directional Bore (1) 1", (0) 2", (0) 1.25" -->\[LF\] -2,199 $ 11.95 $ (26,278.05) Install #12 AWG Insulated Tracer Wire -->\[LF\] -2,199 $ - $ - Installation, Underground Fiber Cable - Including Slack (Micro fiber -2,660 $ 1.20 $ (3,192.00) must be blown in) -->\[LF\] Installation, Small Vault, 13” x 24” (Composite) -->\[EA\] -4 $ 150.00 $ (600.00) Sawcut, Remove and Replace Asphalt 6" Thick -->\[SqrFt\] -10 $ 28.00 $ (280.00) Sawcut, Remove and Replace Asphalt 6" Thick -->\[SqrFt\] -10 $ 32.00 $ (320.00) Install New Splice Case & Prep Cable -->\[EA\] -5 $ 200.00 $ (1,000.00) Splicing, Fusion, Single Fiber -->\[EA\] -7 $ 25.00 $ (175.00) Testing, OTDR, Uni-Directional, Power Meter Testing -->\[EA\] -7 $ 1.00 $ (7.00) CR Labor Subtotal $ (32,190.15) *** Materials 96 CT Micro Fiber Cable -->\[FT\] Fiber Material -2,660 $ 1.32 $ (3,511.20) 1” HDPE Roll Conduit, Orange – SDR 11 -->\[FT\] Underground Material -2,360 $ 0.38 $ (896.80) #12 AWG Solid Thhn Insulated Tracer Wire -->\[FT\] -2,199 $ 0.11 $ (241.89) Small Vault, 13” x 24” - Composite -->\[EA\] -4 $ 339.52 $ (1,358.08) Commscope CSC100 Micro Closure -->\[EA\] -5 $ 81.95 $ (409.75) CR Materials Subtotal $ (6,417.72) *** TOTAL CR COST *** $ (38,607.87) Approvals Magellan Sign-Off Clayton Johnston VP of Construction Print Name / Title: Signature: 2/9/2026 Date: Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: 2/9/2026 Client/Owner (Attn) Print Name / Title: Signature: Date: **End**