Loading...
HomeMy WebLinkAboutITG - CR2026-0040 - Waterloo Broadband Change Order Request - 2.27.26 Change Order Request Change Order TypeDesign/Engineering Will Be Subject To The Withholdings and Release Set Forth In The Retainage No Contract Sections 6.2(f)(i) and (ii) Change Order Name: Change Order Cost:$221,139.75 CR-2026-0040 Construction Contractor Name (Attn)2/20/2026 Request Date: ITG Michael Regan Magellan Project Manager: Requested By:Client/Owner PM Broadband Implementation Clayton Johnston City of Waterloo/Waterloo Client/Owner (Attn) Entrust Sign-Off VP of Construction Fiber/Eric Lage Change Request Overview The following Change Order has been created to account for additional construction labor associated with Description of Change (include location) rock boring along Westfield Ave and West Commercial St in LCP 048 / Task Order 13. The contractor, ITG, completed 4,768 feet of bore in this area and the work involved rock. This bore covered both FTTH & BB infrastructure (BB = 2,450 feet / FTTH = 2,318 feet). Entrust verified the that the bore was completed. However, the Bill of Materials (BoM) line item for rock bore adder shows a zero-unit quantity with a unit rate of $48.75 per linear foot. This means that while rock conditions were encountered and the work was performed, it was not included in the approved scope nor was a change request discussed or submitted prior to construction. At the point when rock was identified or anticipated, the expectation would have been to engage the Waterloo team, review the scope impact, and revise the BoM. Unfortunately, those Reason for Change steps did not occur. This scope of work will need the unit quantities of 4,768 feet for rock adder added to the BoM. : Breakdown of Costs BB = 132ft x $48.75/ft = $6,435.00 BB SHARED = 2,318ft x $48.75/ft = $113,002.50 FTTP SHARED = 2,318ft x $48.75/ft = $113,002.50 - $11,300.25 (10% discount) = $101,702.25 Labor pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Waterloo Material Submittals/ Specifications associated with Contract # 1088 Itemized Breakdown of Work Location DescriptionQuantityUnit PriceAmount Work Order # Labor City of Waterloo Bore Rock Adder -->\[LF\] Underground - Buried Labor2,450 $ 48.75 $ 119,437.50 Waterloo Fiber Bore Rock Adder -->\[LF\] 2,318 $ 48.75 $ 113,002.50 Waterloo Fiber 10% Discount 1 $ (11,300.25) $ (11,300.25) CR Labor Subtotal $ 221,139.75 *** Materials CR Materials Subtotal $ - *** TOTAL CR COST *** $ 221,139.75 Approvals Magellan Sign-Off Clayton Johnston VP of Construction Print Name / Title: Signature: Date: 2/23/2026 Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: 2/23/2026 Client/Owner (Attn) Print Name / Title: Signature: Date: **End**