HomeMy WebLinkAboutIowa DOT - Asphalt resurfacing US218-1/11/2016July 2014
Please return tins copy to:
City Clerk & Finance Dept.
715 Mulberry St.
Waterloo, IA 50703
IOWA DEPARTMENT OF TRANSPORTATION
Preconstruction Agreement
For Primary Road Project
County Black Hawk
City Waterloo
Project No. NHSN-218-7(231)--2R-07
Iowa DOT
Agreement No. 2016-6-105
Staff Action No. S - 2 c3 f G- 0 s S`G�
This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter
designated the "DOT", and the city of Waterloo, Iowa, a Local Public Agency, hereafter designated the
"LPA" in accordance with Iowa Code Chapters 28E, 306, 306A and 313.4 as applicable;
The DOT proposes to establish or make improvements to U S. 218 within Black Hawk County, Iowa; and
The DOT and the LPA are willing to jointly participate in acid project, in the manner hereinafter provided;
and
This Agreement reflects the current concept of this project which is subject to modification by mutual
agreement between the LPA and the DOT; and
Therefore, it is agreed as follows:
1. Project Information
a. The DOT will design, let, and inspect construction of the following described project in accordance
with the project plans and DOT standard specifications:
Hot Mix Asphalt (HMA) resurfacing along U.S. 218 from Mitchell Avenue to north of 18th
Street/Williston Avenue in Waterloo.
b. The DOT will reimburse the LPA a maximum of 968,000 to purchase and install traffic video detection
systems at the following signalized intersections:
i. Mitchell Avenue - 2 additional cameras
ii. Hawthorne Avenue - 4 cameras
iii. Williston Avenue - 3 cameras
iv. 18th Street - 3 cameras
c. DOT reimbursement to the LPA shall not exceed the total cost of purchasing and installing the 12
cameras, in -cabinet video detection equipment, cables and incidental items, The LPA shall take
action to acquire and install the video detection systems prior to construction of the project. All
cameras will be installed and fully functioning by May 15, 2016. The LPA shall own and maintain all
cameras once they are installed.
2016-6-105 Waterloo.docx
July 2014
d. As part of the project, the LPA has requested curb and gutter removal and replacement of intake tops
within the city all at no cost to the DOT.
e. The DOT will install cast iron truncated dome detectable warning pads as part of the project ADA
work. The LPA will own and be responsible for all future maintenance of the ADA sidewalk installed
as part of the project.
2. Project Costs
a. The LPA shall reimburse the DOT for its share of the project costs estimated at $97,430, as shown in
Exhibit A. The amount paid by the LPA upon completion of construction and proper billing by the DOT
will be determined by the actual quantities in place and the accepted bid at the contract letting.
b. The DOT will bear all costs except those allocated to the LPA under other terms of this Agreement.
3. Traffic Control
a. U.S. 218 through -traffic will be maintained during the construction.
b. If it becomes necessary to temporarily close LPA side roads during construction, the DOT will furnish
and install the required barricades and signing for the closure at project cost and shall remove same
upon completion of the project also at no expense or obligation to the LPA. The DOT will work in
close cooperation with the LPA and the contractor to accommodate emergency services and local
access across the project during construction. Any detours which may be necessary for project
related LPA road closures will be the responsibility of the LPA all at no expense or obligation to the
DOT.
4. Right of Way and Permits
a. Subject to the provisions hereof, the LPA in accordance with 761 Iowa Administrative Code Chapter
150.3(1)c and 150.4(2) will remove or cause to be removed (within the corporate limits) all
encroachments or obstructions in the existing primary highway right of way. The LPA will also prevent
the erection and/or placement of any structure or obstruction on said right of way or any additional
right of way which is acquired for this project including but not limited to private signs, buildings,
pumps, and parking areas.
b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road
project.
c. The LPA agrees to relocate all utilities necessary for construction which are located within the existing
street or alley right of way, subject to the approval of and without expense to the DOT and in
accordance with 761 Iowa Administrative Code Chapter 150.4(5) and the DOT Utility Accommodation
Policy.
d. With the exception of service connections no new or future utility occupancy of project right of way,
nor any future relocations of or alterations to existing utilities within said right of way will be permitted
or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in
accordance with the Utility Accommodation Policy and other applicable requirements of the DOT.
5. Construction & Maintenance
a. The LPA, in cooperation with the DOT, will take whatever steps may be required with respect to
alteration of the grade lines of the new highway facilities constructed under the project in accordance
2016-6-105_Waterloo.docx 2
July 2014
with Iowa Code section 364.15. The DOT and LPA will work together to minimize potential impacts to
properties that may occur as a result of the project.
b. Upon completion of the project, no changes in the physical features thereof will be undertaken or
permitted without the prior written approval of the DOT.
c. Future maintenance of the primary highway within the project area will be carried out in accordance
with the terms and conditions contained in 761 Iowa Administrative Code Chapter 150.
d. New lighting and/or traffic signal construction for this project shall be provided under guidelines
established in 761 Iowa Administrative Code Chapter 150. The DOT shall construct traffic signal
installations all at no cost to the LPA. Lighting installations will not be constructed as part of the
project unless specifically requested by the LPA. Lighting which is requested by the LPA will also be
paid for entirely by the LPA at no cost to the DOT or project. If constructed, the LPA shall accept
ownership of and responsibility for future energy and maintenance costs of those lighting and/or traffic
signal units which lie within the corporate boundaries.
6. General Provisions
a. If the LPA has completed a Flood Insurance Study (FIS) for an area which is affected by the
proposed Primary Highway project and the FIS is modified, amended or revised in an area affected
by the project after the date of this Agreement, the LPA shall promptly provide notice of the
modification, amendment or revision to the DOT. If the LPA does not have a detailed Flood Insurance
Study (FIS) for an area which is affected by the proposed Primary Highway project and the LPA does
adopt an FIS in an area affected by the project after the date of this Agreement, the LPA shall
promptly provide notice of the FIS to the DOT.
b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting
discrimination and requiring affirmative action to assure equal employment opportunity as required by
Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual
orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from
participation in, be denied the benefits of, or be otherwise subjected to discrimination under any
program or activity for which State funds are used.
c. It is the intent of both (all) parties that no third party beneficiaries be created by this Agreement.
d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional,
such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part
thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the
Agreement cannot be fulfilled.
e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to
be an original.
f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s),
and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this
project. All previously executed agreements will remain in effect except as amended herein. Any
subsequent change or modification to the terms of this Agreement will be in the form of a duly
executed amendment to this document.
2016-6-105 Waterloo.docx
July 2014
IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2016-6-105 as of the
date shown opposite its signature below.
CITY OF WATERLOO:
By: Date
Title: Mayor
I, , �l2 \ Sc-Arem
d fru �„vt 11
,20} .
, certify that I am the Clerk of the City, and that
v-\ — , who signed said Agreement for and on behalf of
the City was duly authorized to execute the same on the 11i day of J r1'41-1'`' "\ , 20
Signed: c
City Clerl.)of Waterloo, Iowa
IOWA DEPARTMENT OF TRANSPORTATION:
By:
E. Jon Ranney
District Engineer
District 2
Date
2016-6-105 Waterloo.docx 4
, 20Z4
July 2014
EXHIBIT A
Quantities & Estimated Costs
Item Quantity Unit Cost Cost
Curb Removal 10.93 STA $1,500.00 $16,395.00
2.5 -foot PCC Curb & Gutter 615 LF $35.00 $21,525.00
3.5 -foot PCC Curb & Gutter 478 LF $45.00 $21,510.00
SW -508 Intake Top 10 EA $1,500.00 $15,000.00
SW -510 Intake Top 9 EA $2,000.00 $18,000.00
Removal of Structures 1 LS $5,000.00 $5,000.00
Estimated cost (100% LPA) $97,430.00
TOTAL Estimated cost (100% LPA) $97,430.00
2016-6-105 Waterloo.docx
CITY OF WATERLOO
Council Communication
Resolution approving Preconstruction Agreement with Iowa Department of Transportation for primary
road improvements in conjunction with Highway 218 Resurfacing Project from Mitchell Avenue to north
of 18th Street/Williston Avenue; and authorize Mayor and City Clerk to execute said document.
City Council Meeting: 1/11/2016
Prepared: 1/6/2016
ATTACHMENTS:
Description Type
1DOT Hwy 218 Precon Agreement 2016 Cover Memo
SUBJECT:
Submitted by:
Summary Statement:
Expenditure Required:
Source of Funds:
Resolution approving Preconstruction Agreement with Iowa Department
of Transportation for primary road improvements in conjunction with
2016 Highway 218 Asphalt Resurfacing Project (from Mitchell Avenue
to 18111 St./Williston Avenue); and authorize Mayor and City Clerk to
execute said document.
Submitted By: Jeff Bales, Associate Engineer
Estimated City costs amounts to $97,430 for curb and gutter and storm
intake structure improvements and corresponding removals. This will be
paid out of General Obligation Bond funds. The DOT will reimburse
City up to $68,000 to purchase and install traffic video detection systems
for the Mitchell Avenue, Hawthorne Avenue, 18th Street/Williston
Avenue signalized intersections. The City will own and maintain these
systems.
$97,430.00
G.O. Bonds
July 2014
Please return this copy to:
City Clerk & Finance Dept.
715 Mulberry St.
Waterloo, IA 50703
IOWA DEPARTMENT OF TRANSPORTATION
Preconstruction Agreement
For Primary Road Project
County
City
Project No.
Iowa DOT
Agreement No.
Staff Action No.
Black Hawk
Waterloo
NHSN-218-7(231)--2R-07
2016-6-105
This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter
designated the "DOT", and the city of Waterloo, Iowa, a Local Public Agency, hereafter designated the
"LPA" in accordance with Iowa Code Chapters 28E, 306, 306A and 313.4 as applicable;
The DOT proposes to establish or make improvements to U.S. 218 within Black Hawk County, Iowa; and
The DOT and the LPA are willing to jointly participate in said project, in the manner hereinafter provided;
and
This Agreement reflects the current concept of this project which is subject to modification by mutual
agreement between the LPA and the DOT; and
Therefore, it is agreed as follows:
1. Project Information
a. The DOT will design, let, and inspect construction of the following described project in accordance
with the project plans and DOT standard specifications:
Hot Mix Asphalt (HMA) resurfacing along U.S. 218 from Mitchell Avenue to north of 18th
StreeUWilliston Avenue in Waterloo,
b. The DOT will reimburse the LPA a maximum of 8168,000 to purchase and install traffic video detection
systems at the following signalized intersections:
Mitchell Avenue - 2 additional cameras
ii. Hawthorne Avenue - 4 cameras
iii. Williston Avenue - 3 cameras
iv. 18th Street - 3 cameras
c. DOT reimbursement to the LPA shall not exceed the total cost of purchasing and installing the 12
cameras, in -cabinet video detection equipment, cables and incidental items. The LPA shall take
action to acquire and install the video detection systems prior to construction of the project. All
cameras will be installed and fully functioning by May 15, 2016. The LPA shall own and maintain all
cameras once they are installed.
2016-6-105 Waterloo.docx
July 2014
d. As part of the project, the LPA has requested curb and gutter removal and replacement of intake tops
within the city all at no cost to the DOT.
e. The DOT will install cast iron truncated dome detectable warning pads as part of the project ADA
work. The LPA will own and be responsible for all future maintenance of the ADA sidewalk installed
as part of the project.
2. Project Costs
a. The LPA shall reimburse the DOT for its share of the project costs estimated at $97,430, as shown in
Exhibit A. The amount paid by the LPA upon completion of construction and proper billing by the DOT
will be determined by the actual quantities in place and the accepted bid at the contract letting.
b. The DOT will bear all costs except those allocated to the LPA under other terms of this Agreement.
3. Traffic Control
a. U.S. 218 through -traffic will be maintained during the construction.
b. If it becomes necessary to temporarily close LPA side roads during construction, the DOT will furnish
and install the required barricades and signing for the closure at project cost and shall remove same
upon completion of the project also at no expense or obligation to the LPA. The DOT will work in
close cooperation with the LPA and the contractor to accommodate emergency services and local
access across the project during construction. Any detours which may be necessary for project
related LPA road closures will be the responsibility of the LPA all at no expense or obligation to the
DOT.
4. Right of Way and Permits
a. Subject to the provisions hereof, the LPA in accordance with 761 Iowa Administrative Code Chapter
150.3(1)c and 150.4(2) will remove or cause to be removed (within the corporate limits) all
encroachments or obstructions in the existing primary highway right of way. The LPA will also prevent
the erection and/or placement of any structure or obstruction on said right of way or any additional
right of way which is acquired for this project including but not limited to private signs, buildings,
pumps, and parking areas.
b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road
project.
c. The LPA agrees to relocate all utilities necessary for construction which are located within the existing
street or alley right of way, subject to the approval of and without expense to the DOT and in
accordance with 761 Iowa Administrative Code Chapter 150.4(5) and the DOT Utility Accommodation
Policy.
d. With the exception of service connections no new or future utility occupancy of project right of way,
nor any future relocations of or alterations to existing utilities within said right of way will be permitted
or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in
accordance with the Utility Accommodation Policy and other applicable requirements of the DOT.
5. Construction & Maintenance
a. The LPA, in cooperation with the DOT, will take whatever steps may be required with respect to
alteration of the grade lines of the new highway facilities constructed under the project in accordance
2016-6-105 Waterloo.docx 2
July 2014
with Iowa Code section 364.15. The DOT and LPA will work together to minimize potential impacts to
properties that may occur as a result of the project.
b. Upon completion of the project, no changes in the physical features thereof will be undertaken or
permitted without the prior written approval of the DOT.
c. Future maintenance of the primary highway within the project area will be carried out in accordance
with the terms and conditions contained in 761 Iowa Administrative Code Chapter 150.
d. New lighting and/or traffic signal construction for this project shall be provided under guidelines
established in 761 Iowa Administrative Code Chapter 150. The DOT shall construct traffic signal
installations all at no cost to the LPA. Lighting installations will not be constructed as part of the
project unless specifically requested by the LPA. Lighting which is requested by the LPA will also be
paid for entirely by the LPA at no cost to the DOT or project. If constructed, the LPA shall accept
ownership of and responsibility for future energy and maintenance costs of those lighting and/or traffic
signal units which lie within the corporate boundaries.
6. General Provisions
a. If the LPA has completed a Flood Insurance Study (FIS) for an area which is affected by the
proposed Primary Highway project and the FIS is modified, amended or revised in an area affected
by the project after the date of this Agreement, the LPA shall promptly provide notice of the
modification, amendment or revision to the DOT: If the LPA does not have a detailed Flood Insurance
Study (FIS) for an area which is affected by the proposed Primary Highway project and the LPA does
adopt an FIS in an area affected by the project after the date of this Agreement, the LPA shall
promptly provide notice of the FIS to the DOT.
b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting
discrimination and requiring affirmative action to assure equal employment opportunity as required by
Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual
orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from
participation in, be denied the benefits of, or be otherwise subjected to discrimination under any
program or activity for which State funds are used.
c. It is the intent of both (all) parties that no third'party beneficiaries be created by this Agreement.
d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional,
such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part
thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the
Agreement cannot be fulfilled.
e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to
be an original.
f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s),
and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this
project. All previously executed agreements will remain in effect except as amended herein. Any
subsequent change or modification to the terms of this Agreement will be in the form of a duly
executed amendment to this document.
2016-6-105 Waterloo.docx 3
July 2014
IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2016-6-105 as of the
date shown opposite its signature below.
CITY OF WATERLOO:
BY: L
Title: Mayor
Date
20 �.
Sc_ka, its , certify that I am the Clerk of the City, and that
Lucy-\ n ~ ` , who signed said Agreement for and on behalf of
CPA,
the City was duly authorized to execute the same on the I. day of �e`AnA `�'L-''"N 20� Le
Signed:
City CIeraterloo, Iowa
IOWA DEPARTMENT OF TRANSPORTATION:
By: Date
E. Jon Ranney
District Engineer
District 2
, 20 .
2016-6-105 Waterloo.docx 4
July 2014
Item
Curb Removal
2.5 -foot PCC Curb & Gutter
3.5 -foot PCC Curb & Gutter
SW -508 Intake Top
SW -510 Intake Top
Removal of Structures
2016-6-105 Waterloo.docx
Quantities & Estimated Costs
Quantity Unit Cost
10.93 STA $1,500.00
615 LF $35.00
478 LF $45.00
10 EA $1,500.00
9 EA $2,000.00
1 LS $5,000.00
Estimated cost (100% LPA)
EXHIBIT A
Cost
$16,395.00
$21,525.00
$21,510.00
$15,000.00
$18,000.00
$5 000.00
$97,430.00
TOTAL Estimated cost (100% LPA) $97,430.00