HomeMy WebLinkAboutIowa DOT - Asphalt resurfacing US218-1/11/2016July 2014 Please return tins copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 IOWA DEPARTMENT OF TRANSPORTATION Preconstruction Agreement For Primary Road Project County Black Hawk City Waterloo Project No. NHSN-218-7(231)--2R-07 Iowa DOT Agreement No. 2016-6-105 Staff Action No. S - 2 c3 f G- 0 s S`G� This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter designated the "DOT", and the city of Waterloo, Iowa, a Local Public Agency, hereafter designated the "LPA" in accordance with Iowa Code Chapters 28E, 306, 306A and 313.4 as applicable; The DOT proposes to establish or make improvements to U S. 218 within Black Hawk County, Iowa; and The DOT and the LPA are willing to jointly participate in acid project, in the manner hereinafter provided; and This Agreement reflects the current concept of this project which is subject to modification by mutual agreement between the LPA and the DOT; and Therefore, it is agreed as follows: 1. Project Information a. The DOT will design, let, and inspect construction of the following described project in accordance with the project plans and DOT standard specifications: Hot Mix Asphalt (HMA) resurfacing along U.S. 218 from Mitchell Avenue to north of 18th Street/Williston Avenue in Waterloo. b. The DOT will reimburse the LPA a maximum of 968,000 to purchase and install traffic video detection systems at the following signalized intersections: i. Mitchell Avenue - 2 additional cameras ii. Hawthorne Avenue - 4 cameras iii. Williston Avenue - 3 cameras iv. 18th Street - 3 cameras c. DOT reimbursement to the LPA shall not exceed the total cost of purchasing and installing the 12 cameras, in -cabinet video detection equipment, cables and incidental items, The LPA shall take action to acquire and install the video detection systems prior to construction of the project. All cameras will be installed and fully functioning by May 15, 2016. The LPA shall own and maintain all cameras once they are installed. 2016-6-105 Waterloo.docx July 2014 d. As part of the project, the LPA has requested curb and gutter removal and replacement of intake tops within the city all at no cost to the DOT. e. The DOT will install cast iron truncated dome detectable warning pads as part of the project ADA work. The LPA will own and be responsible for all future maintenance of the ADA sidewalk installed as part of the project. 2. Project Costs a. The LPA shall reimburse the DOT for its share of the project costs estimated at $97,430, as shown in Exhibit A. The amount paid by the LPA upon completion of construction and proper billing by the DOT will be determined by the actual quantities in place and the accepted bid at the contract letting. b. The DOT will bear all costs except those allocated to the LPA under other terms of this Agreement. 3. Traffic Control a. U.S. 218 through -traffic will be maintained during the construction. b. If it becomes necessary to temporarily close LPA side roads during construction, the DOT will furnish and install the required barricades and signing for the closure at project cost and shall remove same upon completion of the project also at no expense or obligation to the LPA. The DOT will work in close cooperation with the LPA and the contractor to accommodate emergency services and local access across the project during construction. Any detours which may be necessary for project related LPA road closures will be the responsibility of the LPA all at no expense or obligation to the DOT. 4. Right of Way and Permits a. Subject to the provisions hereof, the LPA in accordance with 761 Iowa Administrative Code Chapter 150.3(1)c and 150.4(2) will remove or cause to be removed (within the corporate limits) all encroachments or obstructions in the existing primary highway right of way. The LPA will also prevent the erection and/or placement of any structure or obstruction on said right of way or any additional right of way which is acquired for this project including but not limited to private signs, buildings, pumps, and parking areas. b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road project. c. The LPA agrees to relocate all utilities necessary for construction which are located within the existing street or alley right of way, subject to the approval of and without expense to the DOT and in accordance with 761 Iowa Administrative Code Chapter 150.4(5) and the DOT Utility Accommodation Policy. d. With the exception of service connections no new or future utility occupancy of project right of way, nor any future relocations of or alterations to existing utilities within said right of way will be permitted or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in accordance with the Utility Accommodation Policy and other applicable requirements of the DOT. 5. Construction & Maintenance a. The LPA, in cooperation with the DOT, will take whatever steps may be required with respect to alteration of the grade lines of the new highway facilities constructed under the project in accordance 2016-6-105_Waterloo.docx 2 July 2014 with Iowa Code section 364.15. The DOT and LPA will work together to minimize potential impacts to properties that may occur as a result of the project. b. Upon completion of the project, no changes in the physical features thereof will be undertaken or permitted without the prior written approval of the DOT. c. Future maintenance of the primary highway within the project area will be carried out in accordance with the terms and conditions contained in 761 Iowa Administrative Code Chapter 150. d. New lighting and/or traffic signal construction for this project shall be provided under guidelines established in 761 Iowa Administrative Code Chapter 150. The DOT shall construct traffic signal installations all at no cost to the LPA. Lighting installations will not be constructed as part of the project unless specifically requested by the LPA. Lighting which is requested by the LPA will also be paid for entirely by the LPA at no cost to the DOT or project. If constructed, the LPA shall accept ownership of and responsibility for future energy and maintenance costs of those lighting and/or traffic signal units which lie within the corporate boundaries. 6. General Provisions a. If the LPA has completed a Flood Insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the FIS is modified, amended or revised in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the modification, amendment or revision to the DOT. If the LPA does not have a detailed Flood Insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the LPA does adopt an FIS in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the FIS to the DOT. b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting discrimination and requiring affirmative action to assure equal employment opportunity as required by Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which State funds are used. c. It is the intent of both (all) parties that no third party beneficiaries be created by this Agreement. d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Agreement cannot be fulfilled. e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to be an original. f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this project. All previously executed agreements will remain in effect except as amended herein. Any subsequent change or modification to the terms of this Agreement will be in the form of a duly executed amendment to this document. 2016-6-105 Waterloo.docx July 2014 IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2016-6-105 as of the date shown opposite its signature below. CITY OF WATERLOO: By: Date Title: Mayor I, , �l2 \ Sc-Arem d fru �„vt 11 ,20} . , certify that I am the Clerk of the City, and that v-\ — , who signed said Agreement for and on behalf of the City was duly authorized to execute the same on the 11i day of J r1'41-1'`' "\ , 20 Signed: c City Clerl.)of Waterloo, Iowa IOWA DEPARTMENT OF TRANSPORTATION: By: E. Jon Ranney District Engineer District 2 Date 2016-6-105 Waterloo.docx 4 , 20Z4 July 2014 EXHIBIT A Quantities & Estimated Costs Item Quantity Unit Cost Cost Curb Removal 10.93 STA $1,500.00 $16,395.00 2.5 -foot PCC Curb & Gutter 615 LF $35.00 $21,525.00 3.5 -foot PCC Curb & Gutter 478 LF $45.00 $21,510.00 SW -508 Intake Top 10 EA $1,500.00 $15,000.00 SW -510 Intake Top 9 EA $2,000.00 $18,000.00 Removal of Structures 1 LS $5,000.00 $5,000.00 Estimated cost (100% LPA) $97,430.00 TOTAL Estimated cost (100% LPA) $97,430.00 2016-6-105 Waterloo.docx CITY OF WATERLOO Council Communication Resolution approving Preconstruction Agreement with Iowa Department of Transportation for primary road improvements in conjunction with Highway 218 Resurfacing Project from Mitchell Avenue to north of 18th Street/Williston Avenue; and authorize Mayor and City Clerk to execute said document. City Council Meeting: 1/11/2016 Prepared: 1/6/2016 ATTACHMENTS: Description Type 1DOT Hwy 218 Precon Agreement 2016 Cover Memo SUBJECT: Submitted by: Summary Statement: Expenditure Required: Source of Funds: Resolution approving Preconstruction Agreement with Iowa Department of Transportation for primary road improvements in conjunction with 2016 Highway 218 Asphalt Resurfacing Project (from Mitchell Avenue to 18111 St./Williston Avenue); and authorize Mayor and City Clerk to execute said document. Submitted By: Jeff Bales, Associate Engineer Estimated City costs amounts to $97,430 for curb and gutter and storm intake structure improvements and corresponding removals. This will be paid out of General Obligation Bond funds. The DOT will reimburse City up to $68,000 to purchase and install traffic video detection systems for the Mitchell Avenue, Hawthorne Avenue, 18th Street/Williston Avenue signalized intersections. The City will own and maintain these systems. $97,430.00 G.O. Bonds July 2014 Please return this copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 IOWA DEPARTMENT OF TRANSPORTATION Preconstruction Agreement For Primary Road Project County City Project No. Iowa DOT Agreement No. Staff Action No. Black Hawk Waterloo NHSN-218-7(231)--2R-07 2016-6-105 This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter designated the "DOT", and the city of Waterloo, Iowa, a Local Public Agency, hereafter designated the "LPA" in accordance with Iowa Code Chapters 28E, 306, 306A and 313.4 as applicable; The DOT proposes to establish or make improvements to U.S. 218 within Black Hawk County, Iowa; and The DOT and the LPA are willing to jointly participate in said project, in the manner hereinafter provided; and This Agreement reflects the current concept of this project which is subject to modification by mutual agreement between the LPA and the DOT; and Therefore, it is agreed as follows: 1. Project Information a. The DOT will design, let, and inspect construction of the following described project in accordance with the project plans and DOT standard specifications: Hot Mix Asphalt (HMA) resurfacing along U.S. 218 from Mitchell Avenue to north of 18th StreeUWilliston Avenue in Waterloo, b. The DOT will reimburse the LPA a maximum of 8168,000 to purchase and install traffic video detection systems at the following signalized intersections: Mitchell Avenue - 2 additional cameras ii. Hawthorne Avenue - 4 cameras iii. Williston Avenue - 3 cameras iv. 18th Street - 3 cameras c. DOT reimbursement to the LPA shall not exceed the total cost of purchasing and installing the 12 cameras, in -cabinet video detection equipment, cables and incidental items. The LPA shall take action to acquire and install the video detection systems prior to construction of the project. All cameras will be installed and fully functioning by May 15, 2016. The LPA shall own and maintain all cameras once they are installed. 2016-6-105 Waterloo.docx July 2014 d. As part of the project, the LPA has requested curb and gutter removal and replacement of intake tops within the city all at no cost to the DOT. e. The DOT will install cast iron truncated dome detectable warning pads as part of the project ADA work. The LPA will own and be responsible for all future maintenance of the ADA sidewalk installed as part of the project. 2. Project Costs a. The LPA shall reimburse the DOT for its share of the project costs estimated at $97,430, as shown in Exhibit A. The amount paid by the LPA upon completion of construction and proper billing by the DOT will be determined by the actual quantities in place and the accepted bid at the contract letting. b. The DOT will bear all costs except those allocated to the LPA under other terms of this Agreement. 3. Traffic Control a. U.S. 218 through -traffic will be maintained during the construction. b. If it becomes necessary to temporarily close LPA side roads during construction, the DOT will furnish and install the required barricades and signing for the closure at project cost and shall remove same upon completion of the project also at no expense or obligation to the LPA. The DOT will work in close cooperation with the LPA and the contractor to accommodate emergency services and local access across the project during construction. Any detours which may be necessary for project related LPA road closures will be the responsibility of the LPA all at no expense or obligation to the DOT. 4. Right of Way and Permits a. Subject to the provisions hereof, the LPA in accordance with 761 Iowa Administrative Code Chapter 150.3(1)c and 150.4(2) will remove or cause to be removed (within the corporate limits) all encroachments or obstructions in the existing primary highway right of way. The LPA will also prevent the erection and/or placement of any structure or obstruction on said right of way or any additional right of way which is acquired for this project including but not limited to private signs, buildings, pumps, and parking areas. b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road project. c. The LPA agrees to relocate all utilities necessary for construction which are located within the existing street or alley right of way, subject to the approval of and without expense to the DOT and in accordance with 761 Iowa Administrative Code Chapter 150.4(5) and the DOT Utility Accommodation Policy. d. With the exception of service connections no new or future utility occupancy of project right of way, nor any future relocations of or alterations to existing utilities within said right of way will be permitted or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in accordance with the Utility Accommodation Policy and other applicable requirements of the DOT. 5. Construction & Maintenance a. The LPA, in cooperation with the DOT, will take whatever steps may be required with respect to alteration of the grade lines of the new highway facilities constructed under the project in accordance 2016-6-105 Waterloo.docx 2 July 2014 with Iowa Code section 364.15. The DOT and LPA will work together to minimize potential impacts to properties that may occur as a result of the project. b. Upon completion of the project, no changes in the physical features thereof will be undertaken or permitted without the prior written approval of the DOT. c. Future maintenance of the primary highway within the project area will be carried out in accordance with the terms and conditions contained in 761 Iowa Administrative Code Chapter 150. d. New lighting and/or traffic signal construction for this project shall be provided under guidelines established in 761 Iowa Administrative Code Chapter 150. The DOT shall construct traffic signal installations all at no cost to the LPA. Lighting installations will not be constructed as part of the project unless specifically requested by the LPA. Lighting which is requested by the LPA will also be paid for entirely by the LPA at no cost to the DOT or project. If constructed, the LPA shall accept ownership of and responsibility for future energy and maintenance costs of those lighting and/or traffic signal units which lie within the corporate boundaries. 6. General Provisions a. If the LPA has completed a Flood Insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the FIS is modified, amended or revised in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the modification, amendment or revision to the DOT: If the LPA does not have a detailed Flood Insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the LPA does adopt an FIS in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the FIS to the DOT. b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting discrimination and requiring affirmative action to assure equal employment opportunity as required by Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which State funds are used. c. It is the intent of both (all) parties that no third'party beneficiaries be created by this Agreement. d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Agreement cannot be fulfilled. e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to be an original. f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this project. All previously executed agreements will remain in effect except as amended herein. Any subsequent change or modification to the terms of this Agreement will be in the form of a duly executed amendment to this document. 2016-6-105 Waterloo.docx 3 July 2014 IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2016-6-105 as of the date shown opposite its signature below. CITY OF WATERLOO: BY: L Title: Mayor Date 20 �. Sc_ka, its , certify that I am the Clerk of the City, and that Lucy-\ n ~ ` , who signed said Agreement for and on behalf of CPA, the City was duly authorized to execute the same on the I. day of �e`AnA `�'L-''"N 20� Le Signed: City CIeraterloo, Iowa IOWA DEPARTMENT OF TRANSPORTATION: By: Date E. Jon Ranney District Engineer District 2 , 20 . 2016-6-105 Waterloo.docx 4 July 2014 Item Curb Removal 2.5 -foot PCC Curb & Gutter 3.5 -foot PCC Curb & Gutter SW -508 Intake Top SW -510 Intake Top Removal of Structures 2016-6-105 Waterloo.docx Quantities & Estimated Costs Quantity Unit Cost 10.93 STA $1,500.00 615 LF $35.00 478 LF $45.00 10 EA $1,500.00 9 EA $2,000.00 1 LS $5,000.00 Estimated cost (100% LPA) EXHIBIT A Cost $16,395.00 $21,525.00 $21,510.00 $15,000.00 $18,000.00 $5 000.00 $97,430.00 TOTAL Estimated cost (100% LPA) $97,430.00