HomeMy WebLinkAboutMunicipal_Pipe_Tool_Co.,_CO__21_-_FY2025_CIP_Pipelining_Phase_V_-_Cont_1118_-_3.16.2026Docusign Envelope ID: 45707B4B-42D4-4EEC-B3A6-246A0F471B9D AECOM March 2, 2026 Mr. Jesse Gaherty Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: FY 2025 CIP Pipelining Phase V Change Order No. 1 City of Waterloo, Iowa City Contract No. 1118 AECOM #60743622 Rear Mr. Gaherty: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Attached is Change Order No. 1 for the FY 2025 CIP Pipelining Phase V project. This Change Order is to reconcile the final quantities for the project. 319-232-6531 tel 319-232-0271 fax AECOM recommends approval by the City to approve Change Order No. 1 for a deduction of $7,721.51,. This Change Order decreases the Contract by 0.79%. The revised Contract Amount is $973,764.99. Yours sincerely, �/ 41._..Z. Nick Schrock, PE Enclosure: Change Order No. 1 Form L5DCS%ProjectslWTR5fi67436.22_FY_2025_CIPP5606_Canstruction_SuppoRlPH V1660_Change _Orders\CO 111116 FY25 Wat CIPP PH V - CO 1 - Reel docx Docusign Envelope ID: 45707B4B-42D4-4EEC-B3A6-246A0F471B9D Original Completion Date: Revised Completion Date: CHANGE ORDER 1 Owner City of Waterloo Project FY 2025 CIP PIPELINING PHASE V A=COM Date: February 24, 2026 Owner's Contract No. 1118 Contractor: Municipal Pipe Tool Co. LLC Date of Contact Start March 3, 2025 Contract Amount: BASE +ALT 1 $ 981,486.50 You are directed to make the following changes in the Contract Documents. Description: ALL FINAL QUANTITY RECONCILIATION - SEE ATTACHED PROJECT TABULATION FOR BID ITEM CHANGES $ (7,721.51) TOTAL $ (7,721.51) Reason for Change Order FINAL QUANTITY RECONCILIATION - SEE ATTACHED PROJECT TABULATION FOR BID ITEM CHANGES CONTRACT PRICE Original: $ 981,486.50 BASE + ALT 1 Previous C.O.s $ NA This C.O. $ (7,721.51) CO 1 Contract Price with all approved $ 973,764.99 Total Change Orders: $ (7,721.51) -0.79% Total CO % CONTRACT TIME To Substantial To Final Completion Completion 12/5/2025 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APP ned by: BY: Po &i L i5bt.St tit, 3/16/2026 tEVeistharsaed..Signature) Date ACCEPTED: �- 1 a,wvi (AJNOC A k t* BY: Contractor (Authorized Signature) ACCEPTED: BY: February 24, 2026 Date February 24, 2026 AECOM Date AECOM 60743622 I 1 Project No. C.O. No. Docusign Envelope ID: 45707B4B-42D4-4EEC-B3A6-246A0F471B9D FINAL QUANTITY SUMMARY FY 2025 CIP PIPELINING PHASE V CITY CONTRACT NO. 1118 AECOM NO 60743622 ITEM NO. ITEM UNIT BID PRICE ORIGINAL QUANTITY FINAL QUANTITY QUANTITY DIFFERENCE INCREASE / DECREASE FINAL AMOUNT BASE BID - SA 15 A Mobilization LS $ 15,000.00 1.00 1.00 0.00 $ - $ 15,000.00 1 8" Diameter CIP Pi.e Linin. LF $ 27.75 16,311.00 16216.10 -94.90 $ (2,633.47) $ 449,996.78 2 10" Diameter CIP Pipe Lining LF $ 33.50 1,879.00 1995.02 116.02 $ 3,886.67 $ 66,833.17 3 12" Diameter CIP Pipe Lining LF $ 38.50 868.00 872.00 4.00 $ 154.00 $ 33,572.00 4 15" Diameter CIP Pipe Lining LF $ 75.00 806.00 807.00 1.00 $ 75.00 $ 60,525.00 5 Lateral Reinstatement EA $ 50.00 249.00 277.00 28.00 $ 1,400.00 $ 13,850.00 6 3-FT Lateral Grouting EA $ 400.00 249.00 217.00 -32.00 $ (12,800.00) $ 86,800.00 7 Pipe Televising - 8" LF $ 1.00 32,622.00 32432.20 -189.80 $ (189.80) $ 32,432.20 8 Pipe Televising - 10" LF $ 1.00 3,758.00 3990.04 232.04 $ 232.04 $ 3,990.04 9 Pipe Televising - 12" LF $ 1.00 1,736.00 1744.00 8.00 $ 8.00 $ 1,744.00 10 Pipe Televising - 15" LF $ 1.00 1,612.00 1614.00 2.00 $ 2.00 $ 1,614.00 11 Type A Pipe Cleaning - 8" LF $ 2.50 16,311.00 16216.10 -94.90 $ (237.25) $ 40,540.25 12 Type A Pipe Cleaning - 10" LF $ 2.50 1,879.00 1995.02 116.02 $ 290.05 $ 4,987.55 13 Type A Pipe Cleaning - 12" LF $ 2.50 868.00 872.00 4.00 $ 10.00 $ 2,180.00 14 Type A Pipe Cleaning -15" LF $ 2.50 806.00 807.00 1.00 $ 2.50 $ 2,017.50 15 Type C Root Removal - 8"-10" LF $ 1.00 4,547.00 1060.00 -3487.00 $ (3,487.001 $ 1,060.00 16 Type C Root Removal - 12"-15" LF $ 1.00 217.00 0.00 -217.00 $ (217.001 $ - 17 Type D Lumberjack - 8"-10" LF $ 1.00 4,547.00 6272.00 1725.00 $ 1,725.00 $ 6,272.00 18 Type D Lumberjack - 12"-15" LF $ 1.00 217.00 0.00 -217.00 $ (217.00) $ - 19 Protruding Taps Removal EA $ 75.00 50.00 7.00 -43.00 $ (3,225.00) $ 525.00 Alternate No. 1 - DWG 8 0.0 $ - o.00 $ - - 101 8" Diameter CIP Pipe Lining LF $ 35.25 2,905.00 2958.00 53.00 $ 1,868.25 $ 104,269.50 102 Lateral Reinstatement EA $ 75.00 40.00 59.00 19.00 $ 1,425.00 $ 4,425.00 103 3-FT Lateral Grouting EA $ 485.00 40.00 57.00 17.00 $ 8,245.00 $ 27,645.00 104 Pipe Televising - 8" LF $ 1.00 5,810.00 5916.00 106.00 $ 106.00 $ 5,916.00 105 Type A Pipe Cleaning - 8" LF $ 2.50 2,905.00 2958.00 53.00 $ 132.50 $ 7,395.00 106 Type C Root Removal - 8"-10" LF $ 1.00 726.00 65.00 -661.00 $ (661.00) $ 65.00 107 Type D Lumberjack - 8"-10" LE $ 1.00 726.00 110.00 -616.00 $ (616.00) $ 110.00 108 Protruding Taps Removal EA $ 150.00 20.00 0.00 -20.00 $ (3,000.001 $ - ORIGINAL CONTRACT INCREASE/DECREASE $ (7,721.51) CONTRACT MODIFICATIONS INCREASE/DECREASE Pay Estimate Number 1 Pay Estimate Number 2 Pay Estimate Number 3 Pay Estimate Number 4 Pay Estimate Number 5 Pay Estimate Number 6 Pay Estimate Number7 (Release Retainage( Total All Payments $408,734.89 $329,309.43 $100,166.81 521,230.11 $39,890.50 $9,120.00 $65,313.25 5973,769.99 Original Contract Amount $ Original Contract Modification Amount $ Increase/Decrease Contract Modification $ Final Contract Amount $ 981,486.50 (7,721.51) 973,764.99 Overall Reduction in Cost: $ (7,721.51)